Loading...
HomeMy WebLinkAbout2025-05 PERMITS APPLIED SUMMARY MAY 2025PERMIT TYPE NUMBER OF PERMITS VALUATION FEES CHARGED ACCESSORY DWELLING UNIT 2 $410,540.04 $15,145.92 SFD-CUSTOM/MODEL 2 $410,540.04 $15,145.92 ETRAKIT 76 $1,321,627.11 $17,760.25 DEMOLITION 3 $2,400.00 $599.70 DUCT WORK ONLY 1 $15,216.00 $199.90 ELECTRIC PANEL RES 15 $51,468.00 $4,665.51 FIRE SUPPRESSION-RES 2 $4,660.00 $558.92 HVAC FRNC HT PMP HVAC CHNG OUT OVER 100K BTU 1 $12,795.00 $238.66 HVAC FRNC HT PMP HVAC CHNG OUT TO 100K BTU 16 $422,607.00 $3,283.92 REROOF COMMERCIAL 2 $95,000.00 $561.92 REROOF RESIDENTIAL 25 $589,523.11 $5,165.60 RETRO MH PERM FND 1 $1,800.00 $616.70 WATER HEATER 6 $24,512.00 $471.12 WNDW GLASS DOOR RPLCMNT NO STRCTRL 4 $101,646.00 $1,398.30 MASTER PLANS 1 $0.00 $4,167.14 Unassigned 1 $0.00 $4,167.14 MECH ELECTRIC PLUMB 35 $294,456.42 $10,597.38 3 PHASE ELECTRIC SER 1 $125,000.00 $554.98 ELECTRIC PANEL COM 3 $16,070.00 $1,001.31 ELECTRIC PANEL RES 19 $81,503.42 $5,436.08 ELECTRICAL 4 $11,000.00 $1,128.24 GAS PIPING RES 1 $345.00 $476.32 HVAC C/O RESIDENTIAL 1 $5,900.00 $238.66 PLUMBING 3 $21,290.00 $875.10 POWER WALLS-BATTERIES SYSTEMS 1 $32,748.00 $531.77 WATER HEATER C/O RES 2 $600.00 $354.92 MISCELLANEOUS 92 $5,388,603.26 $96,632.60 AWNING/CANOPY/CARPT 4 $112,320.20 $3,590.86 DEMOLITION 8 $222,800.00 $2,058.87 FIRE SUPPRESSION-COM 6 $55,120.00 $4,669.32 FIRE SUPPRESSION-RES 5 $30,130.00 $2,005.10 LIMITED AG 3 $834,603.20 $5,258.91 Printed: Tuesday, 24 June, 2025 1 of 2 Permits Applied - Summary by Type Butte County Date Range Between 5/1/2025 and 5/31/2025 PATIO COVER/CVD PCH 5 $184,238.85 $5,269.62 PERMIT TO COMPLETE 1 $337,100.87 $5,514.65 PRIVATE GARAGE/SHOP 12 $1,121,353.90 $27,888.13 PRIVATE POOL 5 $309,000.00 $6,747.88 REMODEL 2 $108,474.00 $2,849.82 REPAIR 2 $74,284.00 $1,875.29 REROOF RESIDENTIAL 18 $211,270.00 $5,129.20 ROOF RE-PITCH 1 $6,394.97 $719.08 ROOM ADDN-FIRST STRY 3 $740,021.93 $7,841.80 ROOM ADDN-MULTI STRY 1 $147,620.34 $2,134.33 SIDING/STUCCO 1 $700.00 $681.25 SOLAR GRND-COM 1 $469,111.00 $1,296.41 SOLAR GRND-RES 1 $70,400.00 $898.31 SOLAR ROOF-RES 7 $130,730.20 $3,332.18 STORAGE SHED 2 $81,711.00 $4,065.12 WINDOW/GLASS DOOR 2 $11,000.00 $714.98 WOOD DECK 2 $130,218.80 $2,091.49 NRES NON RESIDENTIAL 2 $2,578,257.30 $23,429.57 R 4 GROUP CARE 6+1 $1,744,964.00 $12,124.43 S 1 MODERATE HAZARD 1 $833,293.30 $11,305.14 RESIDENTIAL 20 $5,490,947.32 $126,107.59 SFD-CUSTOM/MODEL 7 $3,463,165.76 $69,181.63 SFD-MASTER PLAN 3 $1,016,601.74 $33,338.19 SFD-MOBILE HOME PFS 4 $805,903.34 $18,674.21 SFD-MOBILE HOME RET 5 $20,500.00 $2,960.08 SFD-MOBILE HOME SFT 1 $184,776.48 $1,953.48 RESIDENTIAL APPLICATION 14 $3,055,910.31 $0.00 R-2 APARTMENT BLDG 1 $220,000.00 $0.00 REMODEL 5 $390,810.00 $0.00 SFD-ALT MATERIALS 1 $9,311.31 $0.00 SFD-CUSTOM/MODEL 4 $1,778,000.00 $0.00 SFD-MOBILE HOME PFS 3 $657,789.00 $0.00 SOLAR ONLINE 48 $1,778,385.68 $28,333.69 SOLAR GRND-RES 7 $380,697.11 $5,417.40 SOLAR ROOF-RES 41 $1,397,688.57 $22,916.29 Totals:290 $20,892,709.26 $330,724.45 Printed: Tuesday, 24 June, 2025 2 of 2 Permits Applied - Summary by Type Butte County Date Range Between 5/1/2025 and 5/31/2025