HomeMy WebLinkAbout06.16.25 Board Correspondence - FW_ Emergency Action Plan submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett,
Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence - FW: Emergency Action Plan submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
Date:Monday, June 16, 2025 4:38:14 PM
Please see Board Correspondence
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, June 16, 2025 2:06 PM
Subject: Emergency Action Plan submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 6/16/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Emergency Action Plan
Description: Pacific Gas and Electric Company submits responses to address FERC's 05/02/2025 Comments Nos. 1 though 9 from the 2021 Emergency Action Plans
Reprint, et al. re the Bucks Storage Dam, et al. of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250616-
5221__;!!KNMwiTCp4spf!COKEOQaRenxWU6O_9Tj5kCY6TsmLuHSgdghbg_0JmQU8ug70FrWdE0-L0zd8jLk4tkCaDl11rFjeMYDkBe6h7CBN0Js9J4xloq1O$
To modify your subscriptions, click here:
L0zd8jLk4tkCaDl11rFjeMYDkBe6h7CBN0Js9J_Mqd_Gj$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!COKEOQaRenxWU6O_9Tj5kCY6TsmLuHSgdghbg_0JmQU8ug70FrWdE0-
L0zd8jLk4tkCaDl11rFjeMYDkBe6h7CBN0Js9J5Ntlk0b$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
June 16, 2025
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Storage Dam, NATDAM No. CA00332
Bucks Diversion Dam, NATDAM No. CA00331
Grizzly Forebay Dam, NATDAM No. CA00333
Three Lakes Dam, NATDAM No. CA 00334
2021 Emergency Action Plans Reprint and Dam Breach Analysis and Inundation Maps
Plan and Schedule for FERC Comments 1–8
Response to FERC Comment 9
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company's (PG&E) responses to address the
Federal Energy Regulatory Commission’s (FERC) comments (C-1 through C-9) on the
emergency action plans and dam breach analysis and inundation maps for Bucks Storage Dam,
Bucks Diversion Dam, Grizzly Forebay Dam, and Three Lakes Dam, which are part of PG&E’s
Bucks Creek Hydroelectric Project, FERC No. 619. PG&E received FERC’s comments in a letter
dated May 2, 2025.
PG&E's plan and schedule to address C-1 through C-8 and response to C-9 are enclosed with
this letter (Enclosure 1).
PG&E believes C-9 has been satisfactorily addressed based on the information enclosed with this
letter and no further action is necessary. Should you have technical questions concerning this
matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459.
For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530)
228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure:
1. Plans and Schedules for FERC Comments 1–8 and Response to FERC Comment 9 on the
2021 Emergency Action Plans and Dam Breach Analysis and Inundation Maps
Document Accession #: 20250616-5221 Filed Date: 06/16/2025
ENCLOSURE 1
Document Accession #: 20250616-5221 Filed Date: 06/16/2025
Enclosure 1
1
Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Storage Dam, NATDAM No. CA00332
Bucks Diversion Dam, NATDAM No. CA00331
Grizzly Forebay Dam, NATDAM No. CA00333
Three Lakes Dam, NATDAM No. CA00334
Plan and Schedule for FERC Comments 1–8
and Response to FERC Comment 9 on the
2021 Emergency Action Plans and Dam Breach Analysis and Inundation Maps
In a letter to Pacific Gas and Electric Company (PG&E) dated May 2, 2025, the Federal
Energy Regulatory Commission (FERC) provided Comments 1 through 9 (C-1 through
C-9) regarding the 2021 emergency action plans and dam breach analysis for Bucks
Storage Dam, Bucks Diversion Dam, Grizzly Forebay Dam, and Three Lakes Dam,
which are part of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. PG&E will
evaluate if additional dam breach modeling scenarios are required to address C-1
through C-8 and will provide responses to those comments by June 30, 2026. For
reference, C-9 is copied below, followed by PG&E's response.
C-9: The plan and schedule to submit updated Geographic Information System (GIS)
files for the most current inundation maps by June 30, 2023 has elapsed. Submit
an extension of time request to submit the inundation maps.
PG&E provided its updated GIS files for the most current inundation maps i n a February
16, 2024, letter to FERC. PG&E believes the information provided in that letter
satisfactorily addressed C-9.
Document Accession #: 20250616-5221 Filed Date: 06/16/2025