Loading...
HomeMy WebLinkAbout06.16.25 Board Correspondence - FW_ Emergency Action Plan submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Emergency Action Plan submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Monday, June 16, 2025 4:38:14 PM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, June 16, 2025 2:06 PM Subject: Emergency Action Plan submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/16/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Emergency Action Plan Description: Pacific Gas and Electric Company submits responses to address FERC's 05/02/2025 Comments Nos. 1 though 9 from the 2021 Emergency Action Plans Reprint, et al. re the Bucks Storage Dam, et al. of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250616- 5221__;!!KNMwiTCp4spf!COKEOQaRenxWU6O_9Tj5kCY6TsmLuHSgdghbg_0JmQU8ug70FrWdE0-L0zd8jLk4tkCaDl11rFjeMYDkBe6h7CBN0Js9J4xloq1O$ To modify your subscriptions, click here: L0zd8jLk4tkCaDl11rFjeMYDkBe6h7CBN0Js9J_Mqd_Gj$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!COKEOQaRenxWU6O_9Tj5kCY6TsmLuHSgdghbg_0JmQU8ug70FrWdE0- L0zd8jLk4tkCaDl11rFjeMYDkBe6h7CBN0Js9J5Ntlk0b$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 June 16, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 Bucks Diversion Dam, NATDAM No. CA00331 Grizzly Forebay Dam, NATDAM No. CA00333 Three Lakes Dam, NATDAM No. CA 00334 2021 Emergency Action Plans Reprint and Dam Breach Analysis and Inundation Maps Plan and Schedule for FERC Comments 1–8 Response to FERC Comment 9 Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) responses to address the Federal Energy Regulatory Commission’s (FERC) comments (C-1 through C-9) on the emergency action plans and dam breach analysis and inundation maps for Bucks Storage Dam, Bucks Diversion Dam, Grizzly Forebay Dam, and Three Lakes Dam, which are part of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. PG&E received FERC’s comments in a letter dated May 2, 2025. PG&E's plan and schedule to address C-1 through C-8 and response to C-9 are enclosed with this letter (Enclosure 1). PG&E believes C-9 has been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: 1. Plans and Schedules for FERC Comments 1–8 and Response to FERC Comment 9 on the 2021 Emergency Action Plans and Dam Breach Analysis and Inundation Maps Document Accession #: 20250616-5221 Filed Date: 06/16/2025 ENCLOSURE 1 Document Accession #: 20250616-5221 Filed Date: 06/16/2025 Enclosure 1 1 Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 Bucks Diversion Dam, NATDAM No. CA00331 Grizzly Forebay Dam, NATDAM No. CA00333 Three Lakes Dam, NATDAM No. CA00334 Plan and Schedule for FERC Comments 1–8 and Response to FERC Comment 9 on the 2021 Emergency Action Plans and Dam Breach Analysis and Inundation Maps In a letter to Pacific Gas and Electric Company (PG&E) dated May 2, 2025, the Federal Energy Regulatory Commission (FERC) provided Comments 1 through 9 (C-1 through C-9) regarding the 2021 emergency action plans and dam breach analysis for Bucks Storage Dam, Bucks Diversion Dam, Grizzly Forebay Dam, and Three Lakes Dam, which are part of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. PG&E will evaluate if additional dam breach modeling scenarios are required to address C-1 through C-8 and will provide responses to those comments by June 30, 2026. For reference, C-9 is copied below, followed by PG&E's response. C-9: The plan and schedule to submit updated Geographic Information System (GIS) files for the most current inundation maps by June 30, 2023 has elapsed. Submit an extension of time request to submit the inundation maps. PG&E provided its updated GIS files for the most current inundation maps i n a February 16, 2024, letter to FERC. PG&E believes the information provided in that letter satisfactorily addressed C-9. Document Accession #: 20250616-5221 Filed Date: 06/16/2025 Document Content(s) PGE20250616_619_EAPActionPlan_Analysis_RespCmntts.pdf ....................1 Document Accession #: 20250616-5221 Filed Date: 06/16/2025