Loading...
HomeMy WebLinkAbout06.26.25 Board Correspondence_ FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence: FW: Compliance Directives issued in FERC P-619-000 Date:Thursday, June 26, 2025 8:38:26 AM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, June 26, 2025 6:05 AM Subject: Compliance Directives issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/26/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company providing comments and requesting response within 45 days re the 06/17/2025 Dam Safety Inspection of the Bucks Lake Dam, of Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250626- 3016__;!!KNMwiTCp4spf!FYCezUuYXI5KcDOkEUVkAj2P3UveFd9YbMmikMaa9tQxW2FA9QATeGVnCp3uF9z8rl4xH6n9acAojqETLODybNInxy-psU8jsn77$ To modify your subscriptions, click here: psbHpQZB6$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FYCezUuYXI5KcDOkEUVkAj2P3UveFd9YbMmikMaa9tQxW2FA9QATeGVnCp3uF9z8rl4xH6n9acAojqETLODybNInxy- pscHIITLl$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office June 26, 2025 In reply refer to: Project No.619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:2025 Dam Safety Inspection Follow-up Dear Mr.Cruzen: On June 17, 2025, Ms. Eunhye Kim and Mr. Rakesh Saigal inspected Bucks Lake Dam, which is part of Bucks Creek Hydroelectric Project, FERC No.619. Based on observations made and discussions held during the inspection, the following action item that requires your attention: We observed a 4-inch diameter and 20-inch deep hole next to the entrance of the access bridge to the intake tower. Evaluate and determine if repairs are necessary to prevent the potential development of a seepage path. Implement rodent abatement program to prevent such activities in the future Within 45 days of the date of this letter, address our comments or provide a plan and schedule to address our comments. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview.When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu.The cover page of the filing must indicate that the material was eFiled.For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov,(866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20250626-3016 Filed Date: 06/26/2025 2 We appreciate your cooperation in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Acting Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Shanw.Jones@water.ca.gov Document Accession #: 20250626-3016 Filed Date: 06/26/2025 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2025.06.26 04:25:28 -07'00' Document Content(s) P-619-000_88321_2025_DSI_Bucks Lake_FollowUp.docx.pdf ....................1 Document Accession #: 20250626-3016 Filed Date: 06/26/2025