HomeMy WebLinkAbout07.03.25 Board Correspondence_ FW_ Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen;
Teeter, Doug
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence: FW: Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company
Date:Thursday, July 3, 2025 2:16:20 PM
Please see board correspondence
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, July 3, 2025 2:15 PM
Subject: Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 7/3/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington
D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-2107-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Progress Report
Description: Pacific Gas and Electric Company submits Final Construction Report for the pedestrian bridge at the
Poe Dam, part of the Poe Hydroelectric Project under P-2107.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250703-
5173__;!!KNMwiTCp4spf!G2SWVohIRPz5sVZ-Udclnm66dr2jPIFl4pkfsVFPyRD-
op0nBKNp5jqOfHhwVx_Ou0fncA-uEVKkE1HFcxMwt53UF9muEYKLIshY$
To modify your subscriptions, click here:
Udclnm66dr2jPIFl4pkfsVFPyRD-op0nBKNp5jqOfHhwVx_Ou0fncA-uEVKkE1HFcxMwt53UF9muEcQcN90k$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!G2SWVohIRPz5sVZ-
Udclnm66dr2jPIFl4pkfsVFPyRD-op0nBKNp5jqOfHhwVx_Ou0fncA-uEVKkE1HFcxMwt53UF9muEX5aWIaG$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
July 3, 2025
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Poe Hydroelectric Project, FERC No. 2107-CA
Poe Dam, NATDAM No. CA00328
Poe Pedestrian Bridge Project – Final Construction Report
ENCLOSURES CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) final construction report
for the pedestrian bridge at Poe Dam, which is part of PG&E’s Poe Hydroelectric Project,
Federal Energy Regulatory Commission (FERC) No. 2107 . In a letter dated February 14,
2024, FERC authorized PG&E to proceed with the project and requested that PG&E file a
final construction report for the project within 90 days of construction completion. The
construction project was completed on April 4, 2025.
(Enclosure 1) of this letter provides the final construction report, which includes the as-built
drawings and construction certifications as appendices. (Enclosure 2) includes the dam
platform certificates.
Should you have technical questions concerning this matter, please contact Gavin
Rhoads, project engineer for PG&E, at (530) 370 -6685. For general questions, please
contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Kyle Ingvoldsen, P.E.
Supervisor, Power Generation Project Engineering
Enclosures: CUI//CEII – DO NOT RELEASE
1. Final Construction Report, prepared by PG&E and dated May 2025
2. Poe Dam Platform Certificates, prepared by PG&E
Document Accession #: 20250703-5173 Filed Date: 07/03/2025
Document Content(s)
PGE20250703_2107_PoePedestrian_BridgeProjct_FCR_Ltr.pdf...................1
Document Accession #: 20250703-5173 Filed Date: 07/03/2025