Loading...
HomeMy WebLinkAbout07.17.25 Board Correspondence_ FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence: FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Thursday, July 17, 2025 11:33:27 AM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, July 17, 2025 10:25 AM Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/17/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits summary and conclusion of efforts to address Action Item No. 1 from the 2025 Annual Dam Safety Inspection of the Bucks Storage Dam part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20250717-5062__;!!KNMwiTCp4spf!EqNwdR6yI4CCDNNmwE- m4yjrwQyDW1lsK3IRQBVUJ_5cR5JlalSiaxQob4clFzeQdtXWQ-ZqhYjNq2kg6afk_hiLGvrxx10r2FYb$ To modify your subscriptions, click here: m4yjrwQyDW1lsK3IRQBVUJ_5cR5JlalSiaxQob4clFzeQdtXWQ-ZqhYjNq2kg6afk_hiLGvrxxx96Kzsr$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!EqNwdR6yI4CCDNNmwE- m4yjrwQyDW1lsK3IRQBVUJ_5cR5JlalSiaxQob4clFzeQdtXWQ-ZqhYjNq2kg6afk_hiLGvrxx66DLNbJ$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 July 17, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 2025 Annual FERC Inspection – Summary and Conclusion for Action Item 1 ENCLOSURE CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address Action Item 1 (I-1) from the 2025 annual Federal Energy Regulatory Commission (FERC) dam safety inspection of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. I-1 is regarding Bucks Storage Dam. FERC inspected the project facilities with PG&E staff on June 17, 2025, and provided the follow-up action items to PG&E in a letter dated June 26, 2025. A summary and conclusion of PG&E’s efforts to address I-1 is enclosed with this letter (Enclosure 1). PG&E believes I-1 has been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Summary and Conclusion for Action Item from the 2025 Annual FERC Dam Safety Inspection Document Accession #: 20250717-5062 Filed Date: 07/17/2025 Document Content(s) PGE20250717_619_Resp_to_2025DSI_Item1_Ltr.pdf.............................1 Document Accession #: 20250717-5062 Filed Date: 07/17/2025