HomeMy WebLinkAbout07.17.25 Board Correspondence_ FW_ Glenn Groundwater Authority Special Board Meeting- July 18, 2025.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on
links, or replying..
From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater,
Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence: FW: Glenn Groundwater Authority Special Board Meeting- July 18, 2025
Date:Thursday, July 17, 2025 9:50:50 AM
Attachments:image002.png
25.07.18 Agenda CGA GGA Board Joint Final.pdf
Please see Board Correspondence
From: Lisa Hunter <LHunter@countyofglenn.net>
Sent: Thursday, July 17, 2025 8:19 AM
Subject: Glenn Groundwater Authority Special Board Meeting- July 18, 2025
Please see the attached agenda for the special Joint Colusa Groundwater Authority/Glenn Groundwater Authority
Board meeting.
Special Meeting Agenda
July 18, 2025 | 1:00 p.m.
Colusa Industrial Properties, 100 Sunrise Blvd., Colusa, CA 95932Alternate Meeting Locations:244 SE Piper Dr., Holt, MO 64048344 E. Laurel Street, Willows, CA 95988
A live online viewing/listening only option is being offered via Microsoft Teams
Join the meeting nowMeeting ID: 210 319 776 671 2 | Passcode: 2ms9Vw3b
Dial in by phone+1 323-676-6164,,223445282# United States, Los Angeles | Find a local numberPhone conference ID: 223 445 282#Need help?
Please note that when you access the online meeting, you will be placed into a waiting room and admitted into the
meeting by the Meeting Host. Public comment will only be taken in person or via email, there will be no option to
provide public comment on the remote platform. In addition, if the remote viewing/listening option is interrupted or
compromised, the meeting will continue in person.
Additionally, meeting information is available on the Glenn County website at:
https://www.countyofglenn.net/ggaboard25.07.18
Best Regards,
Lisa Hunter
Program Manager
Glenn Groundwater Authority
(530) 934-6540
Joint Colusa Groundwater Authority and Glenn Groundwater
Authority Board of Directors
Special Meeting Agenda
July 18, 2025 | 1:00 p.m.
Colusa Industrial Properties, 100 Sunrise Blvd., Colusa, CA 95932
Alternate Meeting Locations:
244 SE Piper Dr., Holt, MO 64048
344 E. Laurel Street, Willows, CA 95988
A live online viewing/listening only option is being offered via Microsoft Teams
Join the meeting now
Meeting ID: 210 319 776 671 2 | Passcode: 2ms9Vw3b
Dial in by phone
+1 323-676-6164,,223445282# United States, Los Angeles | Find a local number
Phone conference ID: 223 445 282#
Need help?
Please note that when you access the online meeting, you will be placed into a waiting room and
admitted into the meeting by the Meeting Host. Public comment will only be taken in person or via
email, there will be no option to provide public comment on the remote platform. In addition, if the
remote viewing/listening option is interrupted or compromised, the meeting will continue in person.
* Indicates an Action Item
1. Call to Order, Roll Call, and Introductions
2. Approval of Minutes
a. *February 14, 2025 CGA/GGA Joint Board Meeting Minutes (CGA)
3. Period of Public Comment
At this time, members of the public may address the Board Members regarding items that are
not on the agenda but are of relevance. The Boards may not act on items not on the agenda.
4. Domestic Well Mitigation Program Development (60 minutes)
a. Receive recommendations from CGA/GGA Joint Domestic Well Mitigation Ad Hoc
Committee and discuss to reach a consensus on next steps.
1. Recommendations on program administration.
a. Recommendation 1: Continue development of a Domestic Well
Mitigation (DWM) draft program administration and coordination
structure through discussions with Colusa and Glenn County staff.
(Final DWM program administration and coordination structure
subject to mutual approval of the GSA Boards and Counties.)
2. Recommendations on eligible mitigation.
a. Recommendation 1: Consistent with the April 2024 Memorandum of
Understanding (MOU), eligible wells should include domestic wells
and shallow wells that supply drinking water users (e.g., public
water systems and state small water systems).
b. Recommendation 2: Consistent with the April 2024 MOU, eligible
mitigation measures should include short-term mitigation (bottled
water and/or water tanks) and long-term mitigation (rehabilitating
or replacing existing wells, lowering or replacing pumps in existing
wells, well consolidation, connection to public water systems or
municipal water systems).
c. Recommendation 3: The DWM program shall mitigate impacts
related to GSA management of the Colusa Subbasin with respect to
groundwater level decline and land subsidence. Such impacts will be
determined through evaluation of the well conditions and
surrounding groundwater and land subsidence conditions in
reference to specific eligibility evaluation criteria established by the
GSAs.
d. Recommendation 4: Consistent with the April 2024 MOU, the DWM
program shall mitigate once per eligible well, and such mitigation
will be appropriate to and commensurate with well impacts
resulting from GSA management of the Colusa Subbasin.
e. Recommendation 5: The DWM program will not mitigate for wear-
and-tear or other well impacts not related to GSA management of the
Colusa Subbasin with respect to groundwater level decline and land
subsidence.
f. Recommendation 6: The DWM program will not provide non-
mitigation oriented services (e.g., landscaping, hardscaping, ongoing
maintenance, distribution infrastructure).
g. Recommendation 7: The DWM program will consider whether well
owners have refused other mitigation opportunities in the past (e.g.,
connection to the City of Orland) when determining well eligibility
for the DWM program.
h. Recommendation 8: Consistent with SGMA and the April 2024 MOU,
the DWM program will specify that the GSAs are not responsible for
injury from overdraft (i.e., the GSAs do not extract groundwater),
and the GSAs do not assume any liability to provide, ensure, or
guarantee any level of water quality or access.
5. Groundwater Demand Management Program Development (30 minutes)
a. Receive recommendations from CGA/GGA Joint Demand Management Ad Hoc
Committee and discuss to reach a consensus on next steps.
1. Review sequence and schedule to issue of Request for Qualifications for a
water accounting system and a Request for Qualifications for remote
sensing.
2. *Approve issuance of RFQ for Development and Implementation of a Water
Accounting System. (CGA, GGA)
b. Reach consensus on review and selection recommendation process.
6. Staff Updates (5 minutes)
7. Review Meeting Schedule and Next Steps (5 minutes)
8. Member Reports and Comments
9. Adjourn
Note: Times listed on the agenda are for estimation purposes only.
A complete agenda packet, including back-up information, is available for inspection during normal business hours at
1213 Market Street, Colusa, CA 95932 or 225 N. Tehama St., Willows, CA 95988. The full agenda packet can also be
found on the CGA and GGA websites: https://colusagroundwater.org/agendas-and-meetings-2025/;
https://www.countyofglenn.net/glenn-groundwater-authority/meetings
In compliance with the Americans with Disability Act, if you require special accommodation to participate in this meeting,
please contact the Carol Thomas Keefer, CGA Program Manager, at 650-587-7300 X17 or Glenn County Water Resources
Division at 530-934-6540 prior to any meeting and arrangements will be made to accommodate you.