Loading...
HomeMy WebLinkAbout07.25.25 Board Correspondence_ FW_ Project Operations Compliance Report submitted in FERC P-619-001 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence: FW: Project Operations Compliance Report submitted in FERC P-619-001 by Pacific Gas and Electric Company Date:Friday, July 25, 2025 9:17:21 AM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, July 25, 2025 9:05 AM Subject: Project Operations Compliance Report submitted in FERC P-619-001 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/25/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-001 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Drawing/Maps Description: Pacific Gas and Electric Company submits request for authorization re Low Level Outlet Modification for Instream Flow Release at the Bucks Storage Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250725- 5053__;!!KNMwiTCp4spf!C0WteVxnHMO6Xgh2QPjSpWdIBxiJXSQ2j4fOKqUTtSJeAIzhVZH- VH1_g9q9v8FprMZKK9th1WlIAa_MWQVyVQkrqI4BwLCRm15p$ To modify your subscriptions, click here: VH1_g9q9v8FprMZKK9th1WlIAa_MWQVyVQkrqI4BwFD3oIhB$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!C0WteVxnHMO6Xgh2QPjSpWdIBxiJXSQ2j4fOKqUTtSJeAIzhVZH- VH1_g9q9v8FprMZKK9th1WlIAa_MWQVyVQkrqI4BwKJ0ADpe$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 July 25, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam Low Level Outlet Authorization Request for Low Level Outlet Modification for Instream Flow Release ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) submittal package for a project to install a bypass line and fixed cone valve to meet the new license required minimum instream flow release (IFR) of 3.0 cfs below Bucks Lake (Storage) Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. FERC issued a new Bucks Creek Project license on June 16, 2022. As part of the new license, PG&E must modify the Bucks Storage Dam Low Level Outlet (LLO) to provide minimum instream flows. PG&E has reviewed the permitting requirements for the proposed modifications to the Bucks Creek flow measurement location and confirmed that no additional environmental permits or agency approvals are necessary beyond FERC authorization. In accordance with license requirements, including the provision to complete instream flow release structure modifications as soon as reasonably practicable and no later than two years after receiving all required permits and approvals (Condition No. 39), the Licensee is procee ding with implementation consistent with this timeline and plans to complete the work in 2026 (License Year 4). Enclosed with this submittal, please find the project description (Enclosure 1), 100% design drawings including design criteria memorandum and specifications (Enclosure 2) and quality control inspection program (Enclosure 3). PG&E has reviewed the enclosures and concurs with the information presented therein. PG&E plans to mobilize for construction after snowmelt by June 1, 2026. Document Accession #: 20250725-5053 Filed Date: 07/25/2025 Frank L. Blackett, P.E., Regional Engineer July 25, 2025 Page 2 PG&E respectfully requests FERC authorization to proceed with the Bucks Storage LLO modification project. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please contact Jamie Visinoni, senior license coordinator for PG&E, at (530) 215-6676. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Project Description, Bucks Low Level Outlet Modifications, prepared by PG&E and dated July 2025 2. 100% Drawings, Design Criteria Memo, and project specifications, dated July 2025 3. Quality Control Inspection Program, Bucks Low Level Outlet Modifications, prepared by PG&E and dated July 2025 Document Accession #: 20250725-5053 Filed Date: 07/25/2025 Document Content(s) PGE20250725_ 619_ BucksStorage_FlowMod_ConstPkge_Ltr.pdf .................1 Document Accession #: 20250725-5053 Filed Date: 07/25/2025