Loading...
HomeMy WebLinkAbout07.29.25 Board Correspondence_ FW_ Request for Delay of Action_Extension of Time submitted in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence: FW: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, July 29, 2025 12:48:34 PM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, July 29, 2025 11:45 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/29/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for an extension of time until 11/30/2030 to complete Recommendation 1 from the 10th Part 12D Safety Inspection re the Grizzly Forebay Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250729- 5073__;!!KNMwiTCp4spf!AGGPwAv9pdRQOeEkbcKTKdkeeG2cDf7Oj0xFpngeQ7iIhu1mV8vuifyzB0X0wP-vZaqquMQ3ksde6QzMB6sCKrQXPjRFGx0Y7rFt$ To modify your subscriptions, click here: vZaqquMQ3ksde6QzMB6sCKrQXPjRFG3xty765$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AGGPwAv9pdRQOeEkbcKTKdkeeG2cDf7Oj0xFpngeQ7iIhu1mV8vuifyzB0X0wP- vZaqquMQ3ksde6QzMB6sCKrQXPjRFG8fCL2Oh$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 July 29, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Grizzly Forebay Dam, NATDAM No. CA00333 10th Part 12D Inspection – Recommendation 1 Extension of Time Request ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to address Recommendation 1 (R-1) from the 10th Part 12D safety inspection report (October 2015) for Grizzly Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. Included with PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E submitted its original plan and schedule for addressing R-1 to FERC in a letter dated December 31, 2015, followed by its most recent extension of time request to FERC in a letter dated September 28, 2023. The extension of time request and reason for the request are enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request Document Accession #: 20250729-5073 Filed Date: 07/29/2025 Document Content(s) PGE20250729_619_Grizzly_Leakage_EOT_Ltr.pdf...............................1 Document Accession #: 20250729-5073 Filed Date: 07/29/2025