HomeMy WebLinkAbout07.29.25 Board Correspondence_ FW_ Request for Delay of Action_Extension of Time submitted in FERC P-619-000From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami;
Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence: FW: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
Date:Tuesday, July 29, 2025 12:48:34 PM
Please see Board Correspondence
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, July 29, 2025 11:45 AM
Subject: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 7/29/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Request for Delay of Action/Extension of Time
Description: Pacific Gas and Electric Company submits request for an extension of time until 11/30/2030 to complete Recommendation 1 from the 10th Part 12D Safety
Inspection re the Grizzly Forebay Dam of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250729-
5073__;!!KNMwiTCp4spf!AGGPwAv9pdRQOeEkbcKTKdkeeG2cDf7Oj0xFpngeQ7iIhu1mV8vuifyzB0X0wP-vZaqquMQ3ksde6QzMB6sCKrQXPjRFGx0Y7rFt$
To modify your subscriptions, click here:
vZaqquMQ3ksde6QzMB6sCKrQXPjRFG3xty765$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AGGPwAv9pdRQOeEkbcKTKdkeeG2cDf7Oj0xFpngeQ7iIhu1mV8vuifyzB0X0wP-
vZaqquMQ3ksde6QzMB6sCKrQXPjRFG8fCL2Oh$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
July 29, 2025
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Grizzly Forebay Dam, NATDAM No. CA00333
10th Part 12D Inspection – Recommendation 1
Extension of Time Request
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension
of time to address Recommendation 1 (R-1) from the 10th Part 12D safety inspection
report (October 2015) for Grizzly Dam, which is part of PG&E’s Bucks Creek Hydroelectric
Project, FERC No. 619. Included with PG&E’s extension of time request is a reasoned
basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d).
PG&E submitted its original plan and schedule for addressing R-1 to FERC in a letter
dated December 31, 2015, followed by its most recent extension of time request to FERC
in a letter dated September 28, 2023.
The extension of time request and reason for the request are enclosed with this letter
(Enclosure 1).
Should you have technical questions concerning this matter, please contact Ben Fontana,
senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please
contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Extension of Time Request
Document Accession #: 20250729-5073 Filed Date: 07/29/2025
Document Content(s)
PGE20250729_619_Grizzly_Leakage_EOT_Ltr.pdf...............................1
Document Accession #: 20250729-5073 Filed Date: 07/29/2025