Loading...
HomeMy WebLinkAbout08.11.25 Board Correspondence_ FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence: FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Monday, August 11, 2025 1:39:14 PM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, August 11, 2025 1:15 PM Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 8/11/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits response to FERC's 07/18/2025 comments, et al. re the Spillway Repair Project at the Bucks Storage Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250811- 5146__;!!KNMwiTCp4spf!A2_apuMeOFkAFMHGafguRSO0GKRj4YKFcnUAOKoTbvQUiqOXiQ3Y_nioWfOQRnvj3D7FsxqazXukp47-CKKAqnA9fn9-LgHryiw3$ To modify your subscriptions, click here: CKKAqnA9fn9-LmxUPAgU$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A2_apuMeOFkAFMHGafguRSO0GKRj4YKFcnUAOKoTbvQUiqOXiQ3Y_nioWfOQRnvj3D7FsxqazXukp47- CKKAqnA9fn9-Lk64DxTd$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 August 11, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 Spillway Repair Project – Responses to FERC Comments ENCLOSURES CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) responses to address the Federal Energy Regulatory Commission’s (FERC) comments (C-1 and C-2) on the spillway repair project at Bucks Storage Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. PG&E received FERC’s comments in a letter dated July 18, 2025. PG&E's responses to FERC’s comments are enclosed with this letter (Enclosure 1). An updated work plan (Enclosure 2) and quality control inspection program (Enclosure 3) are enclosed to address FERC’s comments. PG&E believes that FERC comments have been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Responses to FERC Comments Regarding the Spillway Repair Project 2. Bucks Storage Dam Spillway Repair Work Plan, Revision 2, prepared by PG&E and dated August 2025 3. Bucks Storage Dam 2025 Spillway Repair Quality Control Inspection Program, Revision 2, prepared by PG&E and dated July 2025 Document Accession #: 20250811-5146 Filed Date: 08/11/2025 Document Content(s) PGE20250811_619_BucksSpillPrjct_RespCmnts_Ltr.pdf.........................1 Document Accession #: 20250811-5146 Filed Date: 08/11/2025