HomeMy WebLinkAbout08.13.25 Board Correspondence_ FW_ General Correspondence issued in FERC P-2107-067,et al. (3)From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence: FW: General Correspondence issued in FERC P-2107-067,et al.
Date:Wednesday, August 13, 2025 9:28:11 AM
Please see Board Correspondence
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, August 13, 2025 9:05 AM
Subject: General Correspondence issued in FERC P-2107-067,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 8/13/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-2107-067
P-2107-068
P-2107-069
Lead Applicant: Pacific Gas and Electric Company
Filing Type: General Correspondence
Request for Additional Information
Description: Letter to Pacific Gas and Electric Company requesting additional information to be filed within 90 days re 2025 amendment requests and Biological Monitoring Plan revisions filed on 06/02/2025 for the Poe
Hydroelectric Project under P-2107.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250813-
3027__;!!KNMwiTCp4spf!F8s0gRzqgtj0kTmrRkem53dDxp7Fb1m1icztQxRJtCnAUz6K0cCMxYr0RtShgo3NRZEUrLbr_R7ORwJggj_OeGg6QoWAFPE_N9c8$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!F8s0gRzqgtj0kTmrRkem53dDxp7Fb1m1icztQxRJtCnAUz6K0cCMxYr0RtShgo3NRZEUrLbr_R7ORwJggj_OeGg6QoWAFPBV9_2o$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Washington, D. C. 20426
OFFICE OF ENERGY PROJECTS
Project No. 2107-067, -068, -069
---California
Poe Hydroelectric Project
Pacific Gas and Electric Company
August 13, 2025
VIA FERC Service
Stephanie Maggard, Director
Pacific Gas and Electric Company
300 Lakeside Drive
Oakland, CA 94612
Subject: Request for Additional Information - 2025 Amendment Requests and Biological
Monitoring Plan Revisions
Dear Mrs. Maggard:
This is in response to your amendment requests, filed with the Federal Energy
Regulatory Commission on June 2, 2025, for the Poe Hydroelectric Project No. 2107.1
The project is located on the North Fork Feather River in Butte County, California.
You request to amend Section 401 Water Quality Certification (WQC)
condition 1 and U.S. Forest Service Section 4(e) condition 23 to permit you to
temporarily modify minimum instreams flows to perform maintenance or repairs on Poe
dam, outlet facilities, and release facilities, when needed, and with agreement from the
resource agencies. You also request to amend WQC condition 9 to reflect a process that
can incorporate past and future revisions in certain biological monitoring plans by
referencing the approved plans instead of repeatedly updating the text of condition 9
when revisions occur.
One such requested revision is to the Poe Amphibian Monitoring Plan, to change
the start of yearly foothill yellow-legged frog monitoring from being based on a water
temperature trigger to being set to April 15 each year, until temperature data indicates
breeding may be starting earlier. Another such plan revision is proposed for the Poe
1 Order Issuing New License (165 FERC ¶ 62,172), issued December 17, 2018.
Document Accession #: 20250813-3027 Filed Date: 08/13/2025
Project No. 2107-067, -068, -069 - 2 -
Bypass Reach Fish and Benthic Macroinvertebrate Monitoring Plan, to update the plan to
incorporate that an additional year of monitoring has occurred, and to reflect schedule
changes that have required alteration of future monitoring years.
Commission staff have reviewed your June 2, 2025, request and, in order to
continue our review, we are requesting the following additional information:
1. Please request to be designated as a non-federal representative for
Endangered Species Act section 7 consultation regarding your requests,
where required, and provide us a biological evaluation/assessment for our
review as appropriate. A review conducted on the U.S. Fish and Wildlife
(FWS)‘s website, Information of Planning and Consultation (IPAC),
indicates that several federally listed species may be present in the area
affected by your request. IPAC included the following aquatic species that
occur in the affected area and should be included in consultation with FWS;
threatened California red-legged frog and foothill yellow-legged frog,
proposed to be listed northwestern pond turtle, and the proposed critical
habitat of foothill yellow-legged frog.
2. Please provide documentation of coordination and agreement with the
Forest Service and California SWRCB regarding the proposed amendments
and plan changes. This requirement is described by paragraph 8 in both the
Poe Bypass Reach Fish and Benthic Macroinvertebrate Monitoring Plan 2
and the Amphibian Monitoring Plan 3 orders, and agency agreement is
required prior to filing revised plans with the Commission for approval.
This documentation will need to be filed on the record before the
Commission can further consider approving the updated plans or amending
their conditions.
3. Previously, on December 7, 2023 and supplemented on February 28, 2024,
you requested to revise your Amphibian Monitoring Plan in substantially
similar ways as your current June 2, 2025 request. As this most recent
filing appears to be a repeat of your previous request, please consider this
notification that we are dismissing your previous request under subdocket
P-2107-062 as moot, so that the most current version of the plan is
considered for our review.
2 Order Approving Bypass Reach Fish and Benthic Macroinvertebrate Monitoring
Plan Pursuant to Article 401 (171 FERC ¶ 62,050), issued April 16, 2020.
3 Order Approving Amphibian Monitoring Plan Pursuant to Article 401 (173
FERC ¶ 62,100), issued November 24, 2020.
Document Accession #: 20250813-3027 Filed Date: 08/13/2025
Project No. 2107-067, -068, -069 - 3 -
Please provide the requested information within 90 days of the date of this letter,
by November 11, 2025. The Commission strongly encourages electronic filing. Please
file the requested information using the Commission’s eFiling system
at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC
Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions
sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne
A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
The first page of any filing should include docket number associated with the topic
of the filing. Due to the complexity of your request, we will be considering your
amendment requests of WQC condition 1 and 9, and U.S. Forest Service Section 4(e)
condition 23 under P-2107-067; the revisions to the Poe Amphibian Monitoring Plan
under P-2107-068; and the revisions to the Poe Bypass Reach Fish and Benthic
Macroinvertebrate Monitoring Plan under P-2107-069. If a filing provides information
for multiple subdockets, please indicate that on the first page of any filing with the
Commission.
Thank you for your cooperation. If you have any questions regarding this matter,
please contact me at (415) 369-3348 or katherine.schmidt@ferc.gov.
Sincerely,
Katie Schmidt, Fish Biologist
Aquatic Resources Branch
Division of Hydropower Administration
and Compliance
Document Accession #: 20250813-3027 Filed Date: 08/13/2025
KATHERINE
SCHMIDT
Digitally signed by KATHERINE
SCHMIDT
Date: 2025.08.13 07:46:28
-07'00'
Document Content(s)
P-2107-067_068_069_Poe Amendment AIR.pdf..................................1
Document Accession #: 20250813-3027 Filed Date: 08/13/2025