Loading...
HomeMy WebLinkAbout08.15.25 FW_ General Correspondence issued in FERC P-803-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug Cc:Loeser, Kamie; Nuzum, Danielle Subject:FW: General Correspondence issued in FERC P-803-000 Date:Friday, August 15, 2025 4:39:12 PM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, August 15, 2025 1:25 PM Subject: General Correspondence issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 8/15/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: General Correspondence Description: Letter to Pacific Gas and Electric Company discussing the 07/09/25 updated Public Safety Plan for the DeSabla- Centerville Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20250815-3087__;!!KNMwiTCp4spf!FOd9lNrNZ3glAeTMxLw270Dk- 3FINhFnirUEQtm3W6d9Ay8jzWMLG7ZR6vnryZZwbGDvsPQz1L78C9YCmZOQ6QAgceRlKcSvltoP$ To modify your subscriptions, click here: 3FINhFnirUEQtm3W6d9Ay8jzWMLG7ZR6vnryZZwbGDvsPQz1L78C9YCmZOQ6QAgceRlKTVDzs1V$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FOd9lNrNZ3glAeTMxLw270Dk- 3FINhFnirUEQtm3W6d9Ay8jzWMLG7ZR6vnryZZwbGDvsPQz1L78C9YCmZOQ6QAgceRlKYLq-CVm$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office August 15, 2025 In reply refer to: Project No. 803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: DeSabla-Centerville Project –Public Safety Plan Dear Mr.Cruzen: This is in response to a letter dated July 9, 2025,from Ms. Renée Fernandez-Lipp that submitted an updated public safety plan for the DeSabla-Centerville Project, FERC No. 803. Based on our review of the plan, we have no comments on the public safety plan. You are reminded that you are required to ensure compliance with all safety requirements applicable to your license. In addition, per requirements of 18 CFR § 12.52, it is your responsibility to take all reasonable measures for maintaining and operating your hydropower project in a manner safe for the public. This requires that you are continually aware of public use at your project and regularly review your project for the adequacy of safety devices, warnings systems, and/or other measures necessary to protect the public in the use of project lands and waters. A copy of your public safety plan should be kept readily available at the project and site staff should be familiar with the plan. While we recognize that a properly prepared public safety plan and well-maintained and implemented safety measures do not guarantee that public safety incidents will not occur at a project, lack of due diligence regarding public safety provisions may put the public at greater risk. Please note that our regulatory programs are always subject to review and modification. Therefore, future enhancements to your public safety plan may be necessary based on our inspections, revised conditions at the project, or new our program policies or guidance. Document Accession #: 20250815-3087 Filed Date: 08/15/2025 2 We appreciate your continued cooperation in ensuring public safety at your project. If you have any questions,contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20250815-3087 Filed Date: 08/15/2025 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2025.08.15 12:37:34 -07'00' Document Content(s) P-803-000_91439-DeSabla-PSP.docx.pdf .....................................1 Document Accession #: 20250815-3087 Filed Date: 08/15/2025