HomeMy WebLinkAbout08.15.25 FW_ General Correspondence issued in FERC P-803-000From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa;
Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:FW: General Correspondence issued in FERC P-803-000
Date:Friday, August 15, 2025 4:39:12 PM
Please see Board Correspondence
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, August 15, 2025 1:25 PM
Subject: General Correspondence issued in FERC P-803-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments,
clicking on links, or replying..
On 8/15/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: General Correspondence
Description: Letter to Pacific Gas and Electric Company discussing the 07/09/25 updated Public Safety Plan for the DeSabla-
Centerville Project under P-803.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20250815-3087__;!!KNMwiTCp4spf!FOd9lNrNZ3glAeTMxLw270Dk-
3FINhFnirUEQtm3W6d9Ay8jzWMLG7ZR6vnryZZwbGDvsPQz1L78C9YCmZOQ6QAgceRlKcSvltoP$
To modify your subscriptions, click here:
3FINhFnirUEQtm3W6d9Ay8jzWMLG7ZR6vnryZZwbGDvsPQz1L78C9YCmZOQ6QAgceRlKTVDzs1V$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FOd9lNrNZ3glAeTMxLw270Dk-
3FINhFnirUEQtm3W6d9Ay8jzWMLG7ZR6vnryZZwbGDvsPQz1L78C9YCmZOQ6QAgceRlKYLq-CVm$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
August 15, 2025
In reply refer to:
Project No. 803-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re: DeSabla-Centerville Project –Public Safety Plan
Dear Mr.Cruzen:
This is in response to a letter dated July 9, 2025,from Ms. Renée Fernandez-Lipp
that submitted an updated public safety plan for the DeSabla-Centerville Project, FERC
No. 803. Based on our review of the plan, we have no comments on the public safety
plan.
You are reminded that you are required to ensure compliance with all safety
requirements applicable to your license. In addition, per requirements of 18 CFR §
12.52, it is your responsibility to take all reasonable measures for maintaining and
operating your hydropower project in a manner safe for the public. This requires that you
are continually aware of public use at your project and regularly review your project for
the adequacy of safety devices, warnings systems, and/or other measures necessary to
protect the public in the use of project lands and waters. A copy of your public safety
plan should be kept readily available at the project and site staff should be familiar with
the plan. While we recognize that a properly prepared public safety plan and
well-maintained and implemented safety measures do not guarantee that public safety
incidents will not occur at a project, lack of due diligence regarding public safety
provisions may put the public at greater risk.
Please note that our regulatory programs are always subject to review and
modification. Therefore, future enhancements to your public safety plan may be
necessary based on our inspections, revised conditions at the project, or new our program
policies or guidance.
Document Accession #: 20250815-3087 Filed Date: 08/15/2025
2
We appreciate your continued cooperation in ensuring public safety at your project.
If you have any questions,contact Ms. Eunhye Kim at (415) 369-3321.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Document Accession #: 20250815-3087 Filed Date: 08/15/2025
Frank L Blackett, P.E.Digitally signed by Frank L Blackett,
P.E.
Date: 2025.08.15 12:37:34 -07'00'
Document Content(s)
P-803-000_91439-DeSabla-PSP.docx.pdf .....................................1
Document Accession #: 20250815-3087 Filed Date: 08/15/2025