Loading...
HomeMy WebLinkAbout08.20.25 Board Correspondence_ FW_ Delegated Order issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence: FW: Delegated Order issued in FERC P-619-000 Date:Wednesday, August 20, 2025 10:48:03 AM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, August 20, 2025 10:35 AM Subject: Delegated Order issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 8/20/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company granting the 07/18/2025 request for authorization of construction on the spillway chute damage repair at the Bucks Lake Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20250820-3039__;!!KNMwiTCp4spf!GIuR6XjuhQ9TxnZXyNnnpTCrdttCTtwd- KjSCv228clL_Bt04jwweXQvTOClnNCAyADX6OIs6Fe8exyFPp4Md1WkRh_TORCJs6Du$ To modify your subscriptions, click here: KjSCv228clL_Bt04jwweXQvTOClnNCAyADX6OIs6Fe8exyFPp4Md1WkRh_TOcMYhGD2$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GIuR6XjuhQ9TxnZXyNnnpTCrdttCTtwd- KjSCv228clL_Bt04jwweXQvTOClnNCAyADX6OIs6Fe8exyFPp4Md1WkRh_TOUejrXDf$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office August 20, 2025 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Authorization Request for Spillway Repair Project Dear Mr.Cruzen: This is in response to a letter dated August 11, 2025,from Mr. Robert Ellis,that submitted a response to our comments on the spillway chute damage repair at Bucks Lake Dam,which is a part of the Bucks Creek Hydroelectric Project, FERC Project No. 619.We have reviewed the submittal,and we have no further comments. You may proceed with the construction per our letter dated July 18, 2025. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866)208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20250820-3039 Filed Date: 08/20/2025 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2025.08.20 09:42:58 -07'00' 2 cc: Erik Malvick Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 c/o Shawn.Jones@water.ca.gov Document Accession #: 20250820-3039 Filed Date: 08/20/2025 Document Content(s) P-619-000_94218_Repair Spillway_Bucks Lake_0811.docx.pdf .................1 Document Accession #: 20250820-3039 Filed Date: 08/20/2025