Loading...
HomeMy WebLinkAbout08.21.25 Board Correspondence_ FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence: FW: Compliance Directives issued in FERC P-619-000 Date:Thursday, August 21, 2025 1:37:59 PM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, August 21, 2025 10:45 AM Subject: Compliance Directives issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 8/21/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company providing a comment on the 07/28/2025 request for an extension of time to complete upstream joint and dam face repair project etc. at the Grizzly Forebay Dam, part of the Bucks Creek Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250821- 3060__;!!KNMwiTCp4spf!A6v_sSBJJN2AtyiKUEmOhA77jxWaACemk2yIA3Mdx70HbT_UR9nQwZfmjc0EsA5SIoKBT1u9Xb3nGduHVFELSxbXp2RpUNpruRPt$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A6v_sSBJJN2AtyiKUEmOhA77jxWaACemk2yIA3Mdx70HbT_UR9nQwZfmjc0EsA5SIoKBT1u9Xb3nGduHVFELSxbXp2RpUO7zmg0j$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office August 21, 2025 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Repair on Upstream Joints and Dam Face Project Dear Mr.Cruzen: This is in response to a letter dated July 28, 2025,from Mr. Robert Ellis that submitted a request for an extension of time to complete upstream joint and dam face repair project which was initiated to address the 2015 Part 12D follow-up item M.6,at Grizzly Forebay Dam, which is part of the Bucks Creek Project, FERC No. 619. We have reviewed your proposed extension of time and have the following comment: Your request is rejected since there is insufficient engineering justification provided for extending the completion of what was originally a Part 12D recommendation to 18 years after it was originally made. Although you chose to no longer track this as a Part 12D recommendation, it retains the importance of one. Provide a stronger engineering justification related to potential dam safety implications by extending the completion of this recommendation. Within 45 days of the date of this letter, provide a response to our comment or a plan and schedule to address our comment. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20250821-3060 Filed Date: 08/21/2025 2 We appreciate your cooperation in this aspect of our dam safety program. If you have questions,contact Ms.Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Erik Malvick -Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 c/o Shawn.Jones@water.ca.gov Document Accession #: 20250821-3060 Filed Date: 08/21/2025 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2025.08.21 10:18:52 -07'00' Document Content(s) P-619-000_93724_FUI_M.6-DSI 2015_Grizzly_EOT.docx.pdf ....................1 Document Accession #: 20250821-3060 Filed Date: 08/21/2025