Loading...
HomeMy WebLinkAbout08.18.25 General Correspondence issued in FERC P-2107-066 (2) FEDERAL ENERGY REGULATORY COMMISSION Washington, D. C. 20426 OFFICE OF ENERGY PROJECTS Project No. 2107-066 – California Poe Hydroelectric Project Pacific Gas and Electric Company August 18, 2025 VIA FERC Service Stephanie Maggard Director Pacific Gas & Electric Company 300 Lakeside Drive Oakland, CA 94612 Subject: Additional Information Request – Exhibits A and G Dear Ms. Maggard: This letter is in response to your revised Exhibits A, G-1, and G-6, filed on January 17, 2025, to correct a property ownership error and accurately reflect the location of Poe Beach at the Poe Hydroelectric Project No. 2107.1 For Commission staff to complete the review of your Exhibits A and G, please address the following comments within 30 days of the date of this letter and file revised exhibits. • Section A.5 of the Exhibit A states that the U.S. Forest Service (Forest Service) manages 303 acres of National Forest System lands within the project boundary. Additionally, the total Forest Service land listed in the accompanying table is 303.29 acres. However, the updated table in Exhibit G-1 indicates that only 159.71 acres of Forest Service land is within the project boundary. Please address this discrepancy and revise the Exhibit A and/or Exhibit G, as needed, to accurately reflect the total acres of federal lands within the project boundary. • Exhibit G-1 indicates that the total project boundary land increased by 3.89 acres (from 301.14 to 305.03 acres). However, your filing did not state that any additional land was added to the project boundary. Instead, it 1 Pacific Gas and Electric Company, 165 FERC ¶ 62,172 (2018). Document Accession #: 20250818-3016 Filed Date: 08/18/2025 Project No. 2107-066 - 2 - references the need to correct land ownership and accurately reflect the location of Poe Beach. Please clarify if any new land was added to the project boundary that was not previously approved by the license. Please take this opportunity to review all the Exhibit G drawings for the project to confirm no additional revisions are needed. The Commission strongly encourages electronic filing. Please file the requested information using the Commission’s eFiling system at http://www.ferc.gov/docs- filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P-2107-066. Thank you for your cooperation. If you have any questions regarding this matter, please contact Aneela Mousam at (202) 502-8357 or aneela.mousam@ferc.gov. Sincerely, Kelly Houff Chief, Engineering Resources Branch Division of Hydropower Administration and Compliance Document Accession #: 20250818-3016 Filed Date: 08/18/2025 KELLY HOUFF Digitally signed by KELLY HOUFF Date: 2025.08.18 10:50:15 -04'00' Document Content(s) P-2107-066 AIR.pdf........................................................1 Document Accession #: 20250818-3016 Filed Date: 08/18/2025 From:"FERC eSubscription" Subject:General Correspondence issued in FERC P-2107-066 Date:Monday, August 18, 2025 8:45:14 AM .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 8/18/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2107-066 Lead Applicant: Pacific Gas and Electric Company Filing Type: General Correspondence Request for Additional Information Description: Letter to Pacific Gas and Electric Company requesting additional information to be filed within 30 days re the revised Exhibits A, G-1, and G-6 filed on 01/17/2025 etc. for the Poe Hydroelectric Project under P-2107. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250818- 3016__;!!KNMwiTCp4spf!BZWyQGMe8vDwBW3qO370FpR3iLIFJ7-aGVs1OhUXzUich- DfaUdOyyLJVS5s9l5Ez2AkdTD9i_Djda93sBwiw0m9iVBKh9cnae8Q$ To modify your subscriptions, click here: aGVs1OhUXzUich-DfaUdOyyLJVS5s9l5Ez2AkdTD9i_Djda93sBwiw0m9iVBKh8z4v75y$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BZWyQGMe8vDwBW3qO370FpR3iLIFJ7- aGVs1OhUXzUich-DfaUdOyyLJVS5s9l5Ez2AkdTD9i_Djda93sBwiw0m9iVBKh2cYGUuk$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov