Subject: Additional Information Request – Exhibits A and G
Dear Ms. Maggard:
This letter is in response to your revised Exhibits A, G-1, and G-6, filed on
January 17, 2025, to correct a property ownership error and accurately reflect the location
of Poe Beach at the Poe Hydroelectric Project No. 2107.1 For Commission staff to
complete the review of your Exhibits A and G, please address the following comments
within 30 days of the date of this letter and file revised exhibits.
• Section A.5 of the Exhibit A states that the U.S. Forest Service (Forest
Service) manages 303 acres of National Forest System lands within the
project boundary. Additionally, the total Forest Service land listed in the
accompanying table is 303.29 acres. However, the updated table in Exhibit
G-1 indicates that only 159.71 acres of Forest Service land is within the
project boundary. Please address this discrepancy and revise the Exhibit A
and/or Exhibit G, as needed, to accurately reflect the total acres of federal
lands within the project boundary.
• Exhibit G-1 indicates that the total project boundary land increased by
3.89 acres (from 301.14 to 305.03 acres). However, your filing did not
state that any additional land was added to the project boundary. Instead, it
1 Pacific Gas and Electric Company, 165 FERC ¶ 62,172 (2018).
Document Accession #: 20250818-3016 Filed Date: 08/18/2025
Project No. 2107-066 - 2 -
references the need to correct land ownership and accurately reflect the
location of Poe Beach. Please clarify if any new land was added to the
project boundary that was not previously approved by the license. Please
take this opportunity to review all the Exhibit G drawings for the project to
confirm no additional revisions are needed.
The Commission strongly encourages electronic filing. Please file the requested
information using the Commission’s eFiling system at http://www.ferc.gov/docs-
filing/efiling.asp. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In
lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S.
Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket number P-2107-066.
Thank you for your cooperation. If you have any questions regarding this matter,
please contact Aneela Mousam at (202) 502-8357 or aneela.mousam@ferc.gov.
Sincerely,
Kelly Houff
Chief, Engineering Resources Branch
Division of Hydropower Administration
and Compliance
Document Accession #: 20250818-3016 Filed Date: 08/18/2025
KELLY HOUFF
Digitally signed by KELLY
HOUFF
Date: 2025.08.18 10:50:15
-04'00'
Document Content(s)
P-2107-066 AIR.pdf........................................................1
Document Accession #: 20250818-3016 Filed Date: 08/18/2025
From:"FERC eSubscription"
Subject:General Correspondence issued in FERC P-2107-066
Date:Monday, August 18, 2025 8:45:14 AM
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on
links, or replying..
On 8/18/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-2107-066
Lead Applicant: Pacific Gas and Electric Company
Filing Type: General Correspondence
Request for Additional Information
Description: Letter to Pacific Gas and Electric Company requesting additional information to be filed within 30 days re the revised
Exhibits A, G-1, and G-6 filed on 01/17/2025 etc. for the Poe Hydroelectric Project under P-2107.
To view the document for this Issuance, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250818-
3016__;!!KNMwiTCp4spf!BZWyQGMe8vDwBW3qO370FpR3iLIFJ7-aGVs1OhUXzUich-
DfaUdOyyLJVS5s9l5Ez2AkdTD9i_Djda93sBwiw0m9iVBKh9cnae8Q$
To modify your subscriptions, click here:
aGVs1OhUXzUich-DfaUdOyyLJVS5s9l5Ez2AkdTD9i_Djda93sBwiw0m9iVBKh8z4v75y$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BZWyQGMe8vDwBW3qO370FpR3iLIFJ7-
aGVs1OhUXzUich-DfaUdOyyLJVS5s9l5Ez2AkdTD9i_Djda93sBwiw0m9iVBKh2cYGUuk$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov