Loading...
HomeMy WebLinkAbout06.21.2024 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Friday, June 21, 2024 4:59:57 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, June 21, 2024 9:55 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/21/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits plan and schedule to address FERC's 05/08/2024 Comment Nos. 2 and 3, et al. on the Eleventh Part 12D Safety Inspection Report re the Bucks Storage Dam part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240621- 5066__;!!KNMwiTCp4spf!C2x2t3c3AQkgcu5beVYSWgIlRvtItqSd1_423BNYijH5Oj0Xafs8CYWKxvnDDy7pSYeE80lURntkQMvsEqH-G4rF99QRL16vdcS9$ To modify your subscriptions, click here: G4rF99QRL483aW9L$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!C2x2t3c3AQkgcu5beVYSWgIlRvtItqSd1_423BNYijH5Oj0Xafs8CYWKxvnDDy7pSYeE80lURntkQMvsEqH- G4rF99QRL57jyIvG$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 June 21, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 11th Part 12D Safety Inspection Report – Recommendation 3 Conclusion for FERC Comment 1 and Plans and Schedules for FERC Comments 2 and 3 ENCLOSURE CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address the Federal Energy Regulatory Commission’s (FERC) Comment 1 and provides plans and schedules to address FERC’s Comments 2 and 3 on a stage-frequency analysis for Bucks Storage Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. The analysis was performed in response to Recommendation 3 (R-3) from the 11th 5-year Part 12D safety inspection report for Bucks Storage Dam. PG&E received FERC’s comments in a letter dated May 8, 2024. A summary and conclusion of PG&E’s efforts to address FERC’s Comment 1 and plans and schedules to address Comments 2 and 3 are enclosed with this letter (Enclosure 1). PG&E believes that Comment 1 has been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Conclusion for Comment 1 and Plans and Schedules for Comments 2 and 3 Regarding Recommendation 3 from the 11th Part 12D Safety Inspection Report Document Accession #: 20240621-5066 Filed Date: 06/21/2024 Document Content(s) PGE20240621_619_BucksStorage_Resp_to_cmt1,2,3_Ltr.pdf ....................1 Document Accession #: 20240621-5066 Filed Date: 06/21/2024