HomeMy WebLinkAbout06.21.2024 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen;
Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company
Date:Friday, June 21, 2024 4:59:57 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, June 21, 2024 9:55 AM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 6/21/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: Pacific Gas and Electric Company submits plan and schedule to address FERC's 05/08/2024 Comment Nos. 2 and 3, et al. on the Eleventh Part 12D Safety Inspection Report re the Bucks
Storage Dam part of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240621-
5066__;!!KNMwiTCp4spf!C2x2t3c3AQkgcu5beVYSWgIlRvtItqSd1_423BNYijH5Oj0Xafs8CYWKxvnDDy7pSYeE80lURntkQMvsEqH-G4rF99QRL16vdcS9$
To modify your subscriptions, click here:
G4rF99QRL483aW9L$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!C2x2t3c3AQkgcu5beVYSWgIlRvtItqSd1_423BNYijH5Oj0Xafs8CYWKxvnDDy7pSYeE80lURntkQMvsEqH-
G4rF99QRL57jyIvG$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
June 21, 2024
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Storage Dam, NATDAM No. CA00332
11th Part 12D Safety Inspection Report – Recommendation 3
Conclusion for FERC Comment 1 and Plans and
Schedules for FERC Comments 2 and 3
ENCLOSURE CONTAIN CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts
to address the Federal Energy Regulatory Commission’s (FERC) Comment 1 and provides
plans and schedules to address FERC’s Comments 2 and 3 on a stage-frequency analysis
for Bucks Storage Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, FERC
No. 619. The analysis was performed in response to Recommendation 3 (R-3) from the
11th 5-year Part 12D safety inspection report for Bucks Storage Dam. PG&E received
FERC’s comments in a letter dated May 8, 2024.
A summary and conclusion of PG&E’s efforts to address FERC’s Comment 1 and plans
and schedules to address Comments 2 and 3 are enclosed with this letter (Enclosure 1).
PG&E believes that Comment 1 has been satisfactorily addressed based on the
information enclosed with this letter and no further action is necessary. Should you have
technical questions concerning this matter, please contact Ben Fontana, senior dam safety
engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew
Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Conclusion for Comment 1 and Plans and Schedules for Comments 2 and 3 Regarding
Recommendation 3 from the 11th Part 12D Safety Inspection Report
Document Accession #: 20240621-5066 Filed Date: 06/21/2024