Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, June 21, 2024 1:05 PM
Subject: DOCKET CHANGE- Project Operations Compliance Report submitted in FERC P-619-184 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 9/22/2023, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-184
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Project Operations Compliance Report
Description: Pacific Gas and Electric Company submits Annual Historic Properties Management Plan Implementation Report, Forest Service 4(e) Condition No. 58 for the Bucks Creek Hydroelectric Project
under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20230922-
5004__;!!KNMwiTCp4spf!D_DzyEYurduDQ6AvGPaQoLmPVeHjMCTaGXJCrRZvdEEsWSFISIkYBTLshlPN79TIGPvceKeHCc8ROcq84-YvLYgLXF1cYkHdxKcE$
To modify your subscriptions, click here:
YvLYgLXF1cYoXFNrJD$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!D_DzyEYurduDQ6AvGPaQoLmPVeHjMCTaGXJCrRZvdEEsWSFISIkYBTLshlPN79TIGPvceKeHCc8ROcq84-
YvLYgLXF1cYkDjoF7T$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
September 21, 2023
Via Electronic Submittal (E-File)
Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
888 First Street, N. E.
Washington, D.C. 20426
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Annual Historic Properties Management Plan Implementation Report
Forest Service 4(e) Condition No. 58
ENCLOSURE CONTAINS PRIVILEGED INFORMATION
(CUI//PRIV) – DO NOT RELEASE
Dear Secretary Bose:
This letter is regarding Pacific Gas and Electric Company (PG&E) and the City of Santa
Clara’s (Licensees) Bucks Creek Hydroelectric Project, Federal Energy Regulatory
Commission (FERC) No. 619. FERC issued a new license for the Bucks Creek Project
(Project) on June 16, 2022 (License). A Programmatic Agreement (PA) was executed for
the Project on September 13, 2021. Article 404 of the License requires Licensees to
implement the approved PA and Historic Properties Management Plan (HPMP). United
States Forest Service (Forest Service) 4(e) Condition No. 58 (Condition No. 58) of the
License requires the Licensee to implement the HPMP.
The HPMP requires the Licensees to file the Annual HPMP Implementation Report
(Enclosure 1). Per the PA, the Licensees will hold an Annual HPMP Meeting. The Annual
HPMP Meeting was held on July 18, 2023; agenda and meeting notes are included in
Attachment B of Enclosure 1. The PA requires the draft Annual HPMP Implementation
Report to be shared with consulting parties 31 days prior to the meeting. The Draft Annual
HPMP Report was provided to consulting parties on June 15, 2023. Written comments
from consulting parties have been addressed in the Final HPMP Implementation Report,
and a record of comments has been included in Attachment C of Enclosure 1.
Document Accession #: 20230922-5004 Filed Date: 09/22/2023
Kimberly D. Bose, Secretary
September 21, 2023
Page 2
For general questions, please contact PG&E’s Senior Cultural Resource Specialist,
Kathleen Forrest, at (916) 899-1365 or PG&E’s Senior License Coordinator, Jamie
Visinoni, at (530) 215-6676.
Sincerely,
Matthew Joseph
Supervisor, Hydro License Compliance
Enclosure: CUI//PRIV – DO NOT RELEASE
1. 2022 Annual Historic Properties Management Plan Implementation Report
cc: With Enclosure
Julianne Polanco, State Historic Preservation Officer, calshpo.ohp@parks.ca.gov
Brendon Greenaway, Office of Historic Preservation
Brendon.Greenaway@parks.ca.gov
Chris O’Brien, Heritage Program Manager, Plumas National Forest
chris.obrien@usda.gov
Ashlee Taylor, Mt. Hough Ranger District Archaeologist Ashlee.Taylor@usda.gov
Fred Mankins, bigwolf_1962@yahoo.com
Kyle Self, Chair, Greenville Rancheria, kself@greenvillerancheria.com
Patty Allen, Greenville Rancheria, pallen@greenvillerancheria.com
Arian Hart, Tribal Chairman, Susanville Indian Rancheria, ahart@sir-nsn.gov
Brandie Cooper, Natural Resource Director, Susanville Indian Rancheria,
bcooper@sir-nsn.gov
Chris Lamar, Tribal Historic Preservation Officer, Susanville Indian Rancheria,
lamarr@SusanvilleIndianRancheria.onmicrosoft.com
Misty Salem, Maidu Summit Consortium, misty@maidusummit.org
Document Accession #: 20230922-5004 Filed Date: 09/22/2023
Document Content(s)
PGE20230921_0619_HPMP_Report_Ltr.pdf .....................................1
Document Accession #: 20230922-5004 Filed Date: 09/22/2023