Loading...
HomeMy WebLinkAbout06.18.2024 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, June 18, 2024 1:47:58 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, June 18, 2024 6:05 AM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/18/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits additional resume for on-site civil construction inspector for the Spillway Rehabilitation Project at Lower Bucks Lake Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240618- 5023__;!!KNMwiTCp4spf!F_JoGcYwqGEPL5vvZz92cXq83bjaqiFnhKpnbDmHcgEi3B2e7TetKC-xZrJs7O3c4vGS_SdastcsRfRya6j9b2GCo0hlq-c2LHJq$ To modify your subscriptions, click here: xZrJs7O3c4vGS_SdastcsRfRya6j9b2GCo0hlq2OTeOaZ$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!F_JoGcYwqGEPL5vvZz92cXq83bjaqiFnhKpnbDmHcgEi3B2e7TetKC- xZrJs7O3c4vGS_SdastcsRfRya6j9b2GCo0hlq5V0QaPY$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 June 17, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 Spillway Rehabilitation Project at Lower Bucks Lake Dam Additional Resume for On-Site Civil Construction Inspector ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents an additional resume for the spillway rehabilitation project at Bucks Diversion Dam, which is part of Pacific Gas and Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. PG&E received approval for the project on May 7, 2024. The additional inspector will provide staff supplementation for the inspection team on an as-needed basis for the duration of the project. The resume for the additional inspector is provided in Enclosure 1. PG&E believes the resume demonstrates appropriate experience to fulfill the duties described for the role in the quality control inspection program. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. NV5 Quality Control Resume for Daniel Ramsour Document Accession #: 20240618-5023 Filed Date: 06/18/2024 Document Content(s) PGE20240617_619_BucksDiv_Spillway Rehab_Project_Ltr.pdf...................1 Document Accession #: 20240618-5023 Filed Date: 06/18/2024