HomeMy WebLinkAbout06.18.2024 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter,
Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
Date:Tuesday, June 18, 2024 1:47:58 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, June 18, 2024 6:05 AM
Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 6/18/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Project Operations Compliance Report
Description: Pacific Gas and Electric Company submits additional resume for on-site civil construction inspector for the Spillway Rehabilitation Project at Lower
Bucks Lake Dam of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240618-
5023__;!!KNMwiTCp4spf!F_JoGcYwqGEPL5vvZz92cXq83bjaqiFnhKpnbDmHcgEi3B2e7TetKC-xZrJs7O3c4vGS_SdastcsRfRya6j9b2GCo0hlq-c2LHJq$
To modify your subscriptions, click here:
xZrJs7O3c4vGS_SdastcsRfRya6j9b2GCo0hlq2OTeOaZ$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!F_JoGcYwqGEPL5vvZz92cXq83bjaqiFnhKpnbDmHcgEi3B2e7TetKC-
xZrJs7O3c4vGS_SdastcsRfRya6j9b2GCo0hlq5V0QaPY$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
June 17, 2024
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Diversion Dam, NATDAM No. CA00331
Spillway Rehabilitation Project at Lower Bucks Lake Dam
Additional Resume for On-Site Civil Construction Inspector
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents an additional resume for the spillway rehabilitation project at Bucks
Diversion Dam, which is part of Pacific Gas and Electric Company’s (PG&E) Bucks Creek
Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. PG&E
received approval for the project on May 7, 2024. The additional inspector will provide staff
supplementation for the inspection team on an as-needed basis for the duration of the
project.
The resume for the additional inspector is provided in Enclosure 1. PG&E believes the
resume demonstrates appropriate experience to fulfill the duties described for the role in
the quality control inspection program.
Should you have technical questions concerning this matter, please contact Ben Fontana,
senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please
contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. NV5 Quality Control Resume for Daniel Ramsour
Document Accession #: 20240618-5023 Filed Date: 06/18/2024