HomeMy WebLinkAbout06.18.2024 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Loeser, Kamie; Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter;
Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by
Pacific Gas and Electric Company,et al.
Date:Tuesday, June 18, 2024 1:49:47 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, June 18, 2024 12:55 PM
Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric
Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 6/18/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC),
Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Request for Delay of Action/Extension of Time
Description: Pacific Gas and Electric Company submits request for extension of time until 10/31/2024 to address
Recommendation No.15, et al. from the 10th Part 12D Safety Inspection Report, et al. re the Philbrook Dam of the
DeSabla-Centerville Project under P-803.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240618-
5146__;!!KNMwiTCp4spf!F0Cawwe3dCboQx-
jQse1Xs9G_o07BAG2zQNohQRgiZZ4NOWVxnYt_rWwYxFurTT-3HQYIpPJSR8-
E6eDDUu8WL6hDybv4mq3dY5j$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!F0Cawwe3dCboQx-
jQse1Xs9G_o07BAG2zQNohQRgiZZ4NOWVxnYt_rWwYxFurTT-3HQYIpPJSR8-
E6eDDUu8WL6hDybv4sTRlF2p$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!F0Cawwe3dCboQx-
jQse1Xs9G_o07BAG2zQNohQRgiZZ4NOWVxnYt_rWwYxFurTT-3HQYIpPJSR8-
E6eDDUu8WL6hDybv4nMCpQ1O$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
June 18, 2024
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Philbrook Dam, NATDAM No. CA00345
10th Part 12D Inspection – Recommendation 15
11th Part 12D Inspection – Recommendations 1 and 9
Extension of Time Request
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of
time to address Recommendation 15 (R-15) from the 10th 5-year Part 12D safety inspection
report (dated June 2015) and Recommendations 1 and 9 (R-1 and R-9) from the 11th 5-year
Part 12D safety inspection report (dated October 2020) for Philbrook Dam, which is part of
PG&E’s DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission
(FERC) No. 803. Included with PG&E’s extension of time request is a reasoned basis for the
request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E submitted our
original plan and schedule for addressing R-15 in a letter to your office dated December 15,
2015; our original plan and schedule for addressing R-1 and R-9 in a letter dated December 31,
2020; and our most recent update regarding the recommendations in a letter dated December
23, 2022.
The extension of time request and reason for the request are enclosed with this letter
(Enclosure 1).
Should you have technical questions concerning this matter, please contact Kaitlyn Daniels,
dam safety engineer for PG&E, at (707) 342-7885. For general questions, please contact
Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Extension of Time Request
Document Accession #: 20240618-5146 Filed Date: 06/18/2024