HomeMy WebLinkAbout06.14.2024 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Loeser, Kamie; Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter,
Doug; Zepeda, Elizabeth
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
Date:Friday, June 14, 2024 4:20:59 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, June 14, 2024 5:46 AM
Subject: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 6/14/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Request for Delay of Action/Extension of Time
Description: Pacific Gas and Electric Company submits request for extension of time until 9/30/2024 to file results of Seismic Analysis to address Recommendation No. 4 of the 11th Part 12D Safety Inspection re the Bucks
Storage Dam of Bucks Creek Proj. under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240614-
5016__;!!KNMwiTCp4spf!AM4wbtiaxM6b1pWp022v70OavrejOgJTwbuctuQrOb2MUZqNLsFqfkxuegwVusPTnTojFWeNhbdv3BJYZ8vh1jr0wmSt5wnn0W1o$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AM4wbtiaxM6b1pWp022v70OavrejOgJTwbuctuQrOb2MUZqNLsFqfkxuegwVusPTnTojFWeNhbdv3BJYZ8vh1jr0wmSt5wuJGDgz$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
June 13, 2024
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Storage Dam, NATDAM No. CA00332
11th Part 12D Inspection – Recommendation 4
Extension of Time Request
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) request for extension of time
to address Recommendation 4 (R-4) from the 11th 5-year Part 12D safety inspection report
(dated October 2020) for Bucks Storage Dam, which is part of PG&E’s Bucks Creek
Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. Included with
PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code
of Federal Regulations, Section 12.40(d).
PG&E provided its original plan and schedule regarding R-4 in a letter to FERC dated
December 31, 2020, with a subsequent extension of time requested in a letter to FERC dated
February 14, 2024, that extended the assessment completion date to July 31, 2024. This
extension of time request and reason for the request is enclosed with this letter (Enclosure 1).
Should you have technical questions concerning this matter, please contact Ben Fontana,
senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please
contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Extension of Time Request for Recommendation 4 from the 11th Part 12D Safety
Inspection Report
Document Accession #: 20240614-5016 Filed Date: 06/14/2024
Document Content(s)
PGE20240613_619_BucksStorage_R4_EOT_Ltr.pdf...............................1
Document Accession #: 20240614-5016 Filed Date: 06/14/2024