Loading...
HomeMy WebLinkAbout06.14.2024 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Loeser, Kamie; Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nevers, Dawn Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Friday, June 14, 2024 4:20:59 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, June 14, 2024 5:46 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/14/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for extension of time until 9/30/2024 to file results of Seismic Analysis to address Recommendation No. 4 of the 11th Part 12D Safety Inspection re the Bucks Storage Dam of Bucks Creek Proj. under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240614- 5016__;!!KNMwiTCp4spf!AM4wbtiaxM6b1pWp022v70OavrejOgJTwbuctuQrOb2MUZqNLsFqfkxuegwVusPTnTojFWeNhbdv3BJYZ8vh1jr0wmSt5wnn0W1o$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AM4wbtiaxM6b1pWp022v70OavrejOgJTwbuctuQrOb2MUZqNLsFqfkxuegwVusPTnTojFWeNhbdv3BJYZ8vh1jr0wmSt5wuJGDgz$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 June 13, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 11th Part 12D Inspection – Recommendation 4 Extension of Time Request ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for extension of time to address Recommendation 4 (R-4) from the 11th 5-year Part 12D safety inspection report (dated October 2020) for Bucks Storage Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. Included with PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E provided its original plan and schedule regarding R-4 in a letter to FERC dated December 31, 2020, with a subsequent extension of time requested in a letter to FERC dated February 14, 2024, that extended the assessment completion date to July 31, 2024. This extension of time request and reason for the request is enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request for Recommendation 4 from the 11th Part 12D Safety Inspection Report Document Accession #: 20240614-5016 Filed Date: 06/14/2024 Document Content(s) PGE20240613_619_BucksStorage_R4_EOT_Ltr.pdf...............................1 Document Accession #: 20240614-5016 Filed Date: 06/14/2024