Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, September 11, 2025 11:35 AM
Subject: Delegated Order issued in FERC P-137-000,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 9/11/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-137-000
P-619-000
P-2130-000
P-2310-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Delegated Order
Description: Letter to Pacific Gas and Electric Company granting the 06/30/2025 request for an extension of time to submit updated findings of the Spillway Screening-level Portfolio Risk Analyses etc. for the Mokelumne River
Project et al. under P-137 et al.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250911-
3059__;!!KNMwiTCp4spf!DXhQi0C8US6lpmaMiO1fQpiFBWaHCu1gK8jX_gpLNGJ_kToKXhty_Oe4U6H0nlz2y9nO8xz8u7ZOXdCcZOv9Fp4RlrM68fho_1kj$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DXhQi0C8US6lpmaMiO1fQpiFBWaHCu1gK8jX_gpLNGJ_kToKXhty_Oe4U6H0nlz2y9nO8xz8u7ZOXdCcZOv9Fp4RlrM68X2z1jrD$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
September 11, 2025
In reply refer to:
Project Nos. 137, 619,2130,
and 2310-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Spillway Screening Level Portfolio Risk Analysis
Dear Mr.Cruzen:
This is in response to a letter dated June 30,2025,from Mr. David Ritzman, that
submitted a request for an extension of time to submit updated findings of the spillway
screening-level portfolio risk analyses and updated prioritized schedule for the spillway
capital improvement project (CIP)for Mokelumne River, Bucks Creek, Spring Gap-
Stanislaus, and Drum-Spaulding Projects, FERC Nos. 137, 619, 2130,and 2310. We note
that you would add five additional spillways to the risk analysis report and update two
spillways in your screening level risk analysis with results from the Level 2 risk
assessments (L2RA).We have reviewed your proposed extension of time and grant your
request to submit the updated finding report and the updated plan and schedule for the
spillway capital improvement project by February 27, 2026.
File your submittals using our eFiling system at https://www.ferc.gov/ferc-
online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional
Office from the eFiling menu. The cover page of the filings must indicate that the
material was eFiled. For assistance with eFiling, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).
Document Accession #: 20250911-3059 Filed Date: 09/11/2025
2
We appreciate your cooperation in this aspect of our dam safety program. If you
have questions,contact our engineers listed in Table 1 that are assigned to the specific
projects.Our engineers’ phone numbers are listed in Table 2.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Enclosures
cc:
Mr. Erik Malvick
Division Manager
Division of Safety of Dams
California Department of Water Resources
P.O. Box 942836
Sacramento, CA 94236-0001
c/o Shawn.Jones@water.ca.gov
Document Accession #: 20250911-3059 Filed Date: 09/11/2025
Frank L Blackett, PE Digitally signed by Frank L Blackett,
PE
Date: 2025.09.11 08:24:12 -07'00'
Projects Included in Enclosure 1
PG&E’s Spillway Screening Level Risk Analysis Report
1 of 1
Table 1. Projects, Project Engineers and Phone Numbers
Covered by Spillway Screen-level Risk Analysis Report
Project No.Project Name Engineer
137 Mokelumne River Vincent Vigil
619 Bucks Creek Eunhye Kim
2130 Spring Gap-Stanislaus Vincent Vigil
2310
Drum-Spaulding Mynul Chowdhury
(Lake Fordyce),
Thao Bui (Halsey
Afterbay)
Document Accession #: 20250911-3059 Filed Date: 09/11/2025
Phone numbers Enclosure 2
Engineers Responsible for the Projects
1 of 1
Table 2. FERC Project Engineer Phone Numbers
FERC Engineer Phone Number
Eunhye Kim (415) 369-3321
Vincent Vigil (415) 369-3315
Mynul Chowdhury (415) 369-3313
Thao Bui (415) 369-3312
Document Accession #: 20250911-3059 Filed Date: 09/11/2025
Document Content(s)
P-619-000_92756_LowerBucks_et al_SpillwayRisk_EOT.docx.pdf ...............1
Document Accession #: 20250911-3059 Filed Date: 09/11/2025