Loading...
HomeMy WebLinkAbout09.11.25 Board Correspondence - FW_ Delegated Order issued in FERC P-137-000,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Delegated Order issued in FERC P-137-000,et al. Date:Thursday, September 11, 2025 11:52:40 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, September 11, 2025 11:35 AM Subject: Delegated Order issued in FERC P-137-000,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/11/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-137-000 P-619-000 P-2130-000 P-2310-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company granting the 06/30/2025 request for an extension of time to submit updated findings of the Spillway Screening-level Portfolio Risk Analyses etc. for the Mokelumne River Project et al. under P-137 et al. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250911- 3059__;!!KNMwiTCp4spf!DXhQi0C8US6lpmaMiO1fQpiFBWaHCu1gK8jX_gpLNGJ_kToKXhty_Oe4U6H0nlz2y9nO8xz8u7ZOXdCcZOv9Fp4RlrM68fho_1kj$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DXhQi0C8US6lpmaMiO1fQpiFBWaHCu1gK8jX_gpLNGJ_kToKXhty_Oe4U6H0nlz2y9nO8xz8u7ZOXdCcZOv9Fp4RlrM68X2z1jrD$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office September 11, 2025 In reply refer to: Project Nos. 137, 619,2130, and 2310-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Spillway Screening Level Portfolio Risk Analysis Dear Mr.Cruzen: This is in response to a letter dated June 30,2025,from Mr. David Ritzman, that submitted a request for an extension of time to submit updated findings of the spillway screening-level portfolio risk analyses and updated prioritized schedule for the spillway capital improvement project (CIP)for Mokelumne River, Bucks Creek, Spring Gap- Stanislaus, and Drum-Spaulding Projects, FERC Nos. 137, 619, 2130,and 2310. We note that you would add five additional spillways to the risk analysis report and update two spillways in your screening level risk analysis with results from the Level 2 risk assessments (L2RA).We have reviewed your proposed extension of time and grant your request to submit the updated finding report and the updated plan and schedule for the spillway capital improvement project by February 27, 2026. File your submittals using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filings must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20250911-3059 Filed Date: 09/11/2025 2 We appreciate your cooperation in this aspect of our dam safety program. If you have questions,contact our engineers listed in Table 1 that are assigned to the specific projects.Our engineers’ phone numbers are listed in Table 2. Sincerely, Frank L. Blackett, P.E. Regional Engineer Enclosures cc: Mr. Erik Malvick Division Manager Division of Safety of Dams California Department of Water Resources P.O. Box 942836 Sacramento, CA 94236-0001 c/o Shawn.Jones@water.ca.gov Document Accession #: 20250911-3059 Filed Date: 09/11/2025 Frank L Blackett, PE Digitally signed by Frank L Blackett, PE Date: 2025.09.11 08:24:12 -07'00' Projects Included in Enclosure 1 PG&E’s Spillway Screening Level Risk Analysis Report 1 of 1 Table 1. Projects, Project Engineers and Phone Numbers Covered by Spillway Screen-level Risk Analysis Report Project No.Project Name Engineer 137 Mokelumne River Vincent Vigil 619 Bucks Creek Eunhye Kim 2130 Spring Gap-Stanislaus Vincent Vigil 2310 Drum-Spaulding Mynul Chowdhury (Lake Fordyce), Thao Bui (Halsey Afterbay) Document Accession #: 20250911-3059 Filed Date: 09/11/2025 Phone numbers Enclosure 2 Engineers Responsible for the Projects 1 of 1 Table 2. FERC Project Engineer Phone Numbers FERC Engineer Phone Number Eunhye Kim (415) 369-3321 Vincent Vigil (415) 369-3315 Mynul Chowdhury (415) 369-3313 Thao Bui (415) 369-3312 Document Accession #: 20250911-3059 Filed Date: 09/11/2025 Document Content(s) P-619-000_92756_LowerBucks_et al_SpillwayRisk_EOT.docx.pdf ...............1 Document Accession #: 20250911-3059 Filed Date: 09/11/2025