Loading...
HomeMy WebLinkAbout09.10.25 Board Correspondence - FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-619-000 Date:Wednesday, September 10, 2025 10:44:39 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, September 10, 2025 7:35 AM Subject: Compliance Directives issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/10/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company discussing the 08/29/2025 follow-up Part 12D Field Inspections of the Grizzly Forebay Dam et al., part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250910- 3021__;!!KNMwiTCp4spf!CSH30- 7wV5W9gn9Xqs_KTIPDMsvnqK7pRlgzgklKxpAmlwreghFcgHm4pFUB_BXyEKrZpojgyzMsUnggsNkXJzf7euI6- dAJWt-M$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!CSH30- 7wV5W9gn9Xqs_KTIPDMsvnqK7pRlgzgklKxpAmlwreghFcgHm4pFUB_BXyEKrZpojgyzMsUnggsNkXJzf7euI6- VtoRnc7$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CSH30- 7wV5W9gn9Xqs_KTIPDMsvnqK7pRlgzgklKxpAmlwreghFcgHm4pFUB_BXyEKrZpojgyzMsUnggsNkXJzf7euI6- S19koYE$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office September 10, 2025 In reply refer to: Project No.619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: Follow-up Part 12D Field Inspections Dear Mr.Cruzen: On August 29, 2025, Ms. Eunhye Kim of this office conducted follow-up Part 12D field inspections with the Co-Independent Consultant who was unavailable during the originally scheduled Part 12D Field Inspection with the other Co-Independent Consultant. The additional inspections were conducted on the Grizzly Forebay (Comprehensive Assessment –original inspection performed on June 23rd, 2025)and Lower Bucks Lake (Periodic Inspection –original inspection performed on June 24th, 2025) Dams, which are part of Bucks Creek Hydroelectric Project, FERC No.619. Based on observations made and discussions held during the inspection, additional following action items from these inspections require your attention: Grizzly Forebay: 1.During this inspection, we noted two grout holes on the parapet,with approximate depths of 22 feet and 3 feet, respectively.Evaluate the condition of the grout holes and determine if sealing them is warranted to prevent any inadvertent intrusions through the opening in the dam. 2.We observed that part of the Low-Level Outlet pipe protruding from the dam has several dents. Evaluate the current condition,and determine if repairs are warranted to prevent further damage. Document Accession #: 20250910-3021 Filed Date: 09/10/2025 2 Lower Bucks Lake 3.We observed minor leakage from two separate holes near the intersection of the right downstream face and the toe of the dam. The depths of these holes were measured in field to be 47 inches and 12 inches, respectively.Evaluate the leakage,and determine if seepage measurements or repairs are warranted. Within 45 days of the date of this letter, address our comments or provide a plan and schedule to address our comments. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview.When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu.The cover page of the filing must indicate that the material was eFiled.For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov,(866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your cooperation in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20250910-3021 Filed Date: 09/10/2025 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2025.09.10 06:52:41 -07'00' Document Content(s) P-619-000_94920_94922_Grizzly_Lower Bucks_PIL.docx.pdf....................1 Document Accession #: 20250910-3021 Filed Date: 09/10/2025