Loading...
HomeMy WebLinkAbout09.09.25 Board Correspondence_ FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence: FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Tuesday, September 9, 2025 2:04:04 PM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, September 9, 2025 1:55 PM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/9/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Cultural Resources Inventory - Report/Archaeological Study Description: Pacific Gas and Electric Company submits Annual Historic Properties Management Plan Implementation Report for 2024 re the Bucks Creek Hydroelectric Project under P- 619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250909- 5185__;!!KNMwiTCp4spf!HheMmwVUAq31ZHEecN_2v8RffetEz5qsw0F4pISCAqxtyhEmyNmJXISUX8W5b7H9g_7-kgONVVwIRy7lH4JhIJ7_hELVSJEhsf9l$ To modify your subscriptions, click here: kgONVVwIRy7lH4JhIJ7_hELVSI-KeMkY$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HheMmwVUAq31ZHEecN_2v8RffetEz5qsw0F4pISCAqxtyhEmyNmJXISUX8W5b7H9g_7- kgONVVwIRy7lH4JhIJ7_hELVSBDHu_WT$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 September 9, 2025 Via Electronic Submittal (E-File) Debbie-Anne Reese, Secretary Federal Energy Regulatory Commission 888 First Street, N. E. Washington, D.C. 20426 Re: Bucks Creek Hydroelectric Project, FERC No. 619-CA Annual Historic Properties Management Plan Implementation Report Forest Service 4(e) Condition No. 58 ENCLOSURE CONTAINS PRIVILEGED INFORMATION (CUI//PRIV) – DO NOT RELEASE Dear Secretary Reese: This letter is regarding Pacific Gas and Electric Company (PG&E) and the City of Santa Clara’s (Licensees) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. FERC issued a new license for the Bucks Creek Project (Project) on June 16, 2022 (License). A Programmatic Agreement (PA) was executed for the Project on September 13, 2021. Article 404 of the License requires Licensees to implement the approved PA and Historic Properties Management Plan (HPMP). United States Forest Service (Forest Service) 4(e) Condition No. 58 (Condition No. 58) of the License requires the Licensee to implement the HPMP. The HPMP requires the Licensees to file the Annual HPMP Implementation Report (Enclosure 1). Per the PA, the Licensees will hold an Annual HPMP Meeting. The Annual HPMP Meeting was held on July 22, 2025; agenda and meeting notes are included in Attachment D of Enclosure 1. The PA requires the draft Annual HPMP Implementation Report to be shared with consulting parties 31 days prior to the meeting. The Draft Annual HPMP Report was provided to consulting parties on June 16, 2025. Written comments from consulting parties have been addressed in the Final HPMP Implementation Report, and a record of comments has been included in Attachment E of Enclosure 1. For general questions, please contact PG&E’s Senior Cultural Resource Specialist, Kathleen Forrest, at (916) 899-1365 or PG&E’s License Project Manager, Jamie Visinoni, at (530) 215-6676. Sincerely, Matt Joseph Supervisor, Hydro License Management Enclosure: CUI//PRIV – DO NOT RELEASE 1. 2024 Annual Historic Properties Management Plan Implementation Report cc: See Attached List Document Accession #: 20250909-5185 Filed Date: 09/09/2025 Debbie-Anne Reese, Secretary September 9, 2025 Page 2 cc: via email w/enclosure Julianne Polanco, State Historic Preservation Officer, calshpo.ohp@parks.ca.gov; Brendon Greenaway, Office of Historic Preservation Brendon.Greenaway@parks.ca.gov; Chris O’Brien, Heritage Program Manager, Plumas National Forest chris.obrien@usda.gov; Ashlee Taylor, Mt. Hough Ranger District Archaeologist Ashlee.Taylor@usda.gov; Fred Mankins, bigwolf_1962@yahoo.com Kyle Self, Chair, Greenville Rancheria, kself@greenvillerancheria.com; Patty Allen, Greenville Rancheria, pallen@greenvillerancheria.com; Arian Hart, Tribal Chairman, Susanville Indian Rancheria, ahart@sir-nsn.gov; Brandie Cooper, Natural Resource Director, Susanville Indian Rancheria, bcooper@sir- nsn.gov; Maxwell Sickler, Advisory Council on Historic Preservation, msickler@ahcp.gov Shannon Williams, Maidu Summit Consortium, shannon@maidusummit.org Document Accession #: 20250909-5185 Filed Date: 09/09/2025 Document Content(s) PGE20250909_619_Bucks_Creek_HPMP_Report_Ltr.pdf...........................1 Document Accession #: 20250909-5185 Filed Date: 09/09/2025