Loading...
HomeMy WebLinkAbout10.14.25 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Tuesday, October 14, 2025 11:33:57 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, October 14, 2025 10:55 AM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/14/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits Brief Construction Report for the 115-kV Transmission Line Rebuild Phase II Project at the Grizzly Powerhouse of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251014- 5231__;!!KNMwiTCp4spf!FlYOUsFHrpyGZiJ7v0jbxr4wYFzie6NhWzTsfN12cLMEFKp8sPPgYjzEkNONkzLuZhmemBGzksamFGBG254aJkx0fxEJHzajkrng$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FlYOUsFHrpyGZiJ7v0jbxr4wYFzie6NhWzTsfN12cLMEFKp8sPPgYjzEkNONkzLuZhmemBGzksamFGBG254aJkx0fxEJHzkaq7MD$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 14, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Grizzly Powerhouse Brief Construction Report - 115-kV Transmission Line Rebuild, Phase II ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: On June 21, 2024, the Federal Energy Regulatory Commission (FERC) issued a letter authorizing Pacific Gas and Electric Company (PG&E) to proceed with construction of the 115-kV Transmission Line Rebuild – Phase II Project, part of the Bucks Creek Hydroelectric Project (FERC Project No. 619). As part of that authorization, PG&E was required to file a brief construction report for the Phase II project. The brief construction report is provided as (Enclosure 1) to this letter. PG&E appreciates FERC’s continued support for the effort to rebuild the Grizzly Tap. If you have any technical questions regarding this matter, please contact Handel Chavez, Senior Transmission Line Engineer, at (415) 349-0831. For general questions, please contact Jamie Visinoni, license project manager at (530) 215-6676. Sincerely, Kyle Ingvoldsen, P.E. Supervisor, Power Generation Project Engineering Enclosure: CUI//CEII – DO NOT RELEASE 1. Brief Report Summarizing Work for the 115 kV Transmission Line Rebuild, Phase II, prepared by PG&E and dated October 13, 2025 cc: via email w/enclosure: Valentina Guzman, City of Santa Clara – Vguzman@SantaClaraCA.gov Paulo Rocha, City of Santa Clara - procha@santaclaraca.gov Diane Asuncion, City of Santa Clara – dasuncion@santaclaraca.gov Document Accession #: 20251014-5231 Filed Date: 10/14/2025 Document Content(s) PGE20251014_619_Grizzly_Powerhouse_BriefConst_Rpt_Ltr.pdf.................1 Document Accession #: 20251014-5231 Filed Date: 10/14/2025