October 9, 2025
Via Electronic Submittal (E-File)
Debbie-Anne Reese, Secretary
Federal Energy Regulatory Commission
Division of Hydropower Administration and Compliance
888 First Street, NE
Washington, D.C. 20426
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Oro Fino Substation Rebuild –
Delegation of Authority Request Regarding Section 106
Dear Secretary Reese:
This letter respectfully requests that the Federal Energy Regulatory Commission (FERC)
designate Pacific Gas and Electric Company (PG&E) as its non-federal representative to
conduct informal consultation with the California State Historic Preservation Officer (SHPO)
for the Oro Fino Substation Rebuild Project. This maintenance will take place within the
FERC boundary of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. The
Oro Fino Substation Rebuild Project involves civil and electric construction activities within
the FERC boundary. These activities are necessary due to the failure of Transformer Bank 1
in December 2021. The rebuild will transition the substation to a permanent setup that
resolves operational and safety concerns while supporting long -term reliability for the
surrounding community.
Pursuant to Article 51 of the FERC license, PG&E is required to consult with the SHPO prior
to initiating construction to determine the need for cultural resource surveys or mitigation.
PG&E respectfully requests that FERC designate PG&E as its non -federal representative to
conduct informal consultation with SHPO in accordance with Section 106 of the National
Historic Preservation Act.
To assist the construction schedule, please respond to this request by November 15, 2025.
For general questions, please contact Sky Ramirez-Doble, license coordinator for PG&E, at
(530) 250-7002.
Sincerely,
Chadwick McCready,
Senior License Coordinator
Document Accession #: 20251009-5032 Filed Date: 10/09/2025
Document Content(s)
PGE20251009_803_DeSabla_Sect106_DOA_OroFino_Sub.pdf ......................1
Document Accession #: 20251009-5032 Filed Date: 10/09/2025
From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter,
Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence - FW: Procedural Motion submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
Date:Thursday, October 9, 2025 4:39:10 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, October 9, 2025 8:45 AM
Subject: Procedural Motion submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 10/9/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
PG&E Corporation (as Agent)
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Procedural Motion
Description: Pacific Gas and Electric Company submits request to be designated as a Non-Federal Representative for Consultation under Section 106 of the National Historic
Preservation Act re the DeSabla-Centerville Hydroelectric Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251009-
5032__;!!KNMwiTCp4spf!BVFXVlFGEh_XZQpT4_afjh_hcDCZNVy_cjeA9J4nAQg86XE2frNJQF05fv5ePFp9Ge-XKWVOXnXfmSO9ErHfPzHKLfA4keuclu0i$
To modify your subscriptions, click here:
XKWVOXnXfmSO9ErHfPzHKLfA4kURmvROj$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BVFXVlFGEh_XZQpT4_afjh_hcDCZNVy_cjeA9J4nAQg86XE2frNJQF05fv5ePFp9Ge-
XKWVOXnXfmSO9ErHfPzHKLfA4kd5NbcZi$
or for phone support, call 866-208-3676.