Loading...
HomeMy WebLinkAbout10.03.25 Board Correspondence - FW_ Lake Oroville Community Update - October 3, 2025.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Lake Oroville Community Update - October 3, 2025 Date:Friday, October 3, 2025 2:58:58 PM Please see Board Correspondence - From: California Natural Resources Agency <CNRA@public.govdelivery.com> Sent: Friday, October 3, 2025 2:55 PM To: Clerk of the Board <clerkoftheboard@buttecounty.net> Subject: Lake Oroville Community Update - October 3, 2025 View as a webpage / Share Lake Oroville Community Update October 3, 2025 Loafer Creek Fuel Reduction Activities As part of ongoing fuel reduction work within the Lake Oroville State Recreation Area (LOSRA), the Department of Water Resources (DWR) is coordinating with the Butte County Sheriff’s Office (BCSO), the California Conservation Corps (CCC), and CAL FIRE to remove hazardous fuels in the Loafer Creek area. Crews prepped areas this week along State Route 162 and near the Loafer Creek campgrounds and boat launch. Prescribed burning is tentatively scheduled for the week of Oct. 20, depending on weather conditions and CAL FIRE crew availability. In addition, a CAL FIRE grant-funded project supported by DWR, the Department of Parks Mooretown Rancheria of Maidu Indians will begin additional fuel reduction work next week in the Loafer Creek area near State Route 162. Approximately 140 acres will be treated by hand crews and heavy equipment over the next several months. During vegetation management activities some trails within the Loafer Creek area may be intermittently closed. Trail users should use caution in active work areas and follow all posted signage. Oroville-area residents should expect to see smoke from prescribed fires in the coming weeks. DWR appreciates the public’s cooperation and understanding as it works to reduce wildfire risk, increase public safety, and support long-term land management goals. Vegetation management remains a top priority for DWR and its partners. Between early 2013 – June 2024, DWR and its local partners treated or retreated more than 2,500 acres of vegetation around the FERC project boundary including LOSRA. Golden Mussel Inspection Program DWR is alerting water recreators to upcoming changes to boat ramp hours that will be in effect as of Monday, Oct. 13. More details about DWR’s mussel inspection program are available at water.ca.gov/mussels. Watercraft Inspection Location/Decontamination Services North Thermalito Forebay at Garden Drive and HWY 70 in Oroville Hours of operation: Daily from 8:30 a.m. to 5:30 p.m. Starting Nov. 3: Daily from 8:30 a.m. to 4:30 p.m. Sealed Vessel Launching Lake Oroville Ramp hours: Daily from 7:30 a.m. to 9 p.m. Starting Oct. 13: Daily from 7:30 a.m. to 6:30 p.m. Spillway Ramp hours: Daily from 7:30 a.m. to 9 p.m. Starting Oct. 13: Monday-Thursday 7:30 a.m. to 6:30 p.m.; Friday-Sunday 7:30 a.m. to 8 p.m. Bidwell Canyon Ramp hours: Daily from 5 a.m. to 9 p.m. Starting Oct. 13: Monday-Thursday 5 a.m. to 6:30 p.m.; Friday-Sunday 5 a.m. to 8 p.m. Lime Saddle Ramp hours: Daily from 5 a.m. to 9 p.m. Starting Oct. 13: Daily from 5 a.m. to 6:30 p.m. Loafer Creek/Loafer Point Thermalito Afterbay Ramp hours: Daily from 1.5 hours before sunrise to 1 hour after sunset Monument Hill Thermalito Forebay Ramp Hours: Daily from 8 a.m. to sunset North Forebay (Non-motorized vessels only) Paving and Sealing Work Ongoing DWR is continuing work on a $1.9 million paving and sealing project to rehabilitate seven locations owned and maintained by the department that are heavily used by maintenance staff and public members. Project work is expected to continue through November 2025. Vintage Paving Company, Inc. of Winters, Calif. is the contractor for the project. Upcoming construction work will require closures to the following public areas: 18 – Oct. 31: Afterbay Dam Crest Road/Brad Freeman Trail south of State Route 162 to the East Hamilton Road Trail Access Additional locations for future paving, sealing, and guardrail work include: Thermalito Powerplant Access Roads Thermalito Diversion Dam Powerplant Oroville Field Division Operations and Maintenance Center at Glen Drive Canyon Drive from the intersection of Oroville Dam Blvd. E./Royal Oaks Drive heading north to the dam and upper overlook Oroville Dam Boulevard East near Oro Powerhouse Road DWR will provide more details about scheduled work and potential public access impacts in future newsletters. Work schedules are subject to change based on weather and the availability of equipment and materials. Feather River Fish Monitoring Station Between Jan. 30 and April 20, high flows in the Feather River required the temporary removal of fish monitoring equipment resulting in lower spring-run estimates. Upstream migrating fish totals through the Feather River Fish Monitoring Station between Jan. 1 and Sept. 25, 2025 are: Spring-run Chinook salmon (April 16 through June 30): 17,733 Fall-run Chinook salmon (July 1 through present): 4,201 This email was sent to clerkoftheboard@buttecounty.net from the California Natural Resources Agency utilizing govDelivery. California Natural Resources Agency, 715 P Street, Sacramento, CA 95814 To see previous year data, visit CalFish.org. Current Lake Operations Lake Oroville is at 794 feet elevation and storage is approximately 2.03 million acre-feet (MAF), which is 59 percent of its total capacity and 107 percent of the historical average. Feather River flows are at 650 cubic feet per second (cfs) through the City of Oroville with 7,350 cfs being released from the Thermalito Afterbay River Outlet (Outlet) for a total Feather River release of 8,000 cfs downstream. DWR continues to assess Feather River releases daily. The public can track precipitation, snow, reservoir levels, and more at the California Data Exchange Center. The Lake Oroville gage station is identified as “ORO.” All data as of 11:59 p.m. on 10/2/2025. California Department of Water Resources 715 P Street Sacramento, CA 95814 Call our general information line at 916-820-8142 or email us at oroville@water.ca.gov Contact Us Stay Connected with the California Department of Water Resources SUBSCRIBER SERVICES: Manage Subscriptions | Help