HomeMy WebLinkAbout10.03.25 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa;
Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug;
Zepeda, Elizabeth
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric
Company
Date:Friday, October 3, 2025 1:18:14 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, October 3, 2025 12:50 PM
Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments,
clicking on links, or replying..
On 10/3/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Project Operations Compliance Report
Description: Pacific Gas and Electric Company submits plan and schedule to address FERC's 08/21/2025 comment re the
concrete repair project on the upstream face of Grizzly Forebay Dam of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20251003-5102__;!!KNMwiTCp4spf!AitsKxxosXXoQlQpSo4jvkeAe6-De2auew9jSXBF-4yZGWPX_Z-
BtTYUakr5CAieoVhSEMf6T4CUtZDuZouU-_2CBsAib8OiioCF$
To modify your subscriptions, click here:
De2auew9jSXBF-4yZGWPX_Z-BtTYUakr5CAieoVhSEMf6T4CUtZDuZouU-_2CBsAib1_EcG7v$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AitsKxxosXXoQlQpSo4jvkeAe6-
De2auew9jSXBF-4yZGWPX_Z-BtTYUakr5CAieoVhSEMf6T4CUtZDuZouU-_2CBsAib_26plsA$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
October 3, 2025
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Grizzly Forebay Dam, NATDAM No. CA00333
Upstream Dam Face Concrete Repair Project – Plan and Schedule for
Response to FERC Comment
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company's (PG&E) plan and schedule to
address the Federal Energy Regulatory Commission’s (FERC) comment (C-1) regarding
the concrete repair project on the upstream face of Grizzly Forebay Dam, which is part of
PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. PG&E received C-1 in a letter
dated August 21, 2025.
PG&E's plan and schedule to address C-1 is enclosed with this letter (Enclosure 1).
Should you have technical questions concerning this matter, please contact Ben Fontana,
senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please
contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Plan and Schedule for FERC Comment Regarding Concrete Repair Project
Document Accession #: 20251003-5102 Filed Date: 10/03/2025
Document Content(s)
PGE20251003_619_Grizzly_UpstreamRepair_RspntoCmnt_Ltr.pdf.................1
Document Accession #: 20251003-5102 Filed Date: 10/03/2025