Loading...
HomeMy WebLinkAbout10.03.25 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Friday, October 3, 2025 1:18:14 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, October 3, 2025 12:50 PM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/3/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits plan and schedule to address FERC's 08/21/2025 comment re the concrete repair project on the upstream face of Grizzly Forebay Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20251003-5102__;!!KNMwiTCp4spf!AitsKxxosXXoQlQpSo4jvkeAe6-De2auew9jSXBF-4yZGWPX_Z- BtTYUakr5CAieoVhSEMf6T4CUtZDuZouU-_2CBsAib8OiioCF$ To modify your subscriptions, click here: De2auew9jSXBF-4yZGWPX_Z-BtTYUakr5CAieoVhSEMf6T4CUtZDuZouU-_2CBsAib1_EcG7v$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AitsKxxosXXoQlQpSo4jvkeAe6- De2auew9jSXBF-4yZGWPX_Z-BtTYUakr5CAieoVhSEMf6T4CUtZDuZouU-_2CBsAib_26plsA$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 3, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Grizzly Forebay Dam, NATDAM No. CA00333 Upstream Dam Face Concrete Repair Project – Plan and Schedule for Response to FERC Comment ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) plan and schedule to address the Federal Energy Regulatory Commission’s (FERC) comment (C-1) regarding the concrete repair project on the upstream face of Grizzly Forebay Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. PG&E received C-1 in a letter dated August 21, 2025. PG&E's plan and schedule to address C-1 is enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Plan and Schedule for FERC Comment Regarding Concrete Repair Project Document Accession #: 20251003-5102 Filed Date: 10/03/2025 Document Content(s) PGE20251003_619_Grizzly_UpstreamRepair_RspntoCmnt_Ltr.pdf.................1 Document Accession #: 20251003-5102 Filed Date: 10/03/2025