Loading...
HomeMy WebLinkAbout10.21.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Tuesday, October 21, 2025 8:23:38 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, October 21, 2025 6:45 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/21/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits plans and schedules to address additional action items from the Part 12D Field Inspections of the Grizzly Forebay Dam et al., part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251021- 5023__;!!KNMwiTCp4spf!GY0EYxzDQvOExfQtye8Ei1PtAZ4E1lMGs4kf0P1eCAHgqWsi6kjg0c69pvw7qgQ1vYLvz7A_-zBWL4XHJje8bc-G-HrHGXWYIUM0$ To modify your subscriptions, click here: zBWL4XHJje8bc-G-HrHGYkUBfD0$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GY0EYxzDQvOExfQtye8Ei1PtAZ4E1lMGs4kf0P1eCAHgqWsi6kjg0c69pvw7qgQ1vYLvz7A_- zBWL4XHJje8bc-G-HrHGYopkpNL$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 20, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 Grizzly Forebay Dam, NATDAM No. CA00333 2025 Part 12D Safety Review – Plans and Schedules for Follow-Up Action Items ENCLOSURE CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) plans and schedules to address additional Action Items 1, 2, and 3 (I-1, I-2, and I-3) from the Federal Energy Regulatory Commission’s (FERC) 2025 Part 12D field inspection of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. I-1 and I-2 are regarding Grizzly Forebay Dam and I-3 is regarding Bucks Diversion Dam. FERC initially inspected the project facilities on June 23–24, 2025, as part of the 2025 Part 12D comprehensive assessment. Following the inspection, FERC issued a letter dated June 30, 2025, outlining action items for PG&E. PG&E responded to FERC’s June 30 letter in a correspondence dated August 6, 2025. Subsequently, a supplemental inspection was performed on August 29, 2025, after which FERC provided additional action items to PG&E in a letter dated September 10, 2025. PG&E's plans and schedules to address the additional action items identified in FERC’s September 10, 2025, correspondence are enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Plans and Schedules for Additional Action Items from the August 29, 2025, Supplemental Part 12D Field Inspection Document Accession #: 20251021-5023 Filed Date: 10/21/2025 Document Content(s) PGE20251020_619_BucksDivGrizzly_2025DSI_Items_Ltr.pdf ....................1 Document Accession #: 20251021-5023 Filed Date: 10/21/2025