Loading...
HomeMy WebLinkAbout10.17.25 Board Correspondence - FW_ Progress Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Progress Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Friday, October 17, 2025 8:05:54 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, October 17, 2025 6:25 AM Subject: Progress Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/17/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Progress Report Description: Pacific Gas and Electric Company submits Monthly Construction Report No. 11 for September 2025 re the Lower Bucks Spillway Rehabilitation Project at the Bucks Diversion Dam, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251017- 5005__;!!KNMwiTCp4spf!HP6DhfaruRqEzXvhMaJuY5cSkaZuIvnstb1XkpgvpdKWp8IoyxyAqyYZBKn0M3CEk0A-v0FFuCPwcfJHsfcHb4faeuBdLSy-8AhV$ To modify your subscriptions, click here: v0FFuCPwcfJHsfcHb4faeuBdLXCmtSIr$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HP6DhfaruRqEzXvhMaJuY5cSkaZuIvnstb1XkpgvpdKWp8IoyxyAqyYZBKn0M3CEk0A- v0FFuCPwcfJHsfcHb4faeuBdLTwHbOTF$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 16, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 Lower Bucks Spillway Rehabilitation Project 11th Monthly Construction Report ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) 11th monthly construction report for the replacement and repair of the spillway at Bucks Diversion Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. In a letter dated May 7, 2024, FERC provided PG&E authorization to proceed with the project and requested that PG&E file monthly reports to document the progress of construction. The monthly construction report for this project is provided in (Enclosure 1). The report provides details on the project’s construction activities for September 2025. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Matthew Joseph Supervisor, Hydro License Compliance Enclosure: CUI//CEII – DO NOT RELEASE 1. Monthly Construction Report No.11, prepared by PG&E and dated September 2025 Document Accession #: 20251017-5005 Filed Date: 10/17/2025 Document Content(s) PGE20251016_619_BucksDiv_Spillway_SepMCR11_Ltr.pdf........................1 Document Accession #: 20251017-5005 Filed Date: 10/17/2025