Loading...
HomeMy WebLinkAbout10.16.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Friday, October 17, 2025 8:05:29 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, October 16, 2025 12:55 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/16/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits 12th Part 12D Safety Inspection Plan for Comprehensive Assessment re the Philbrook Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20251016-5144__;!!KNMwiTCp4spf!GbkqGHT7Ybzo40AQ- wC87D8PIbVcdB4d59LtSh1ve6ePpxVgJQ7ZuEs05GowGOZAtx7ZDyfbpOj--MkMm4EnjwPLEBAuGDTVH2pL$ To modify your subscriptions, click here: wC87D8PIbVcdB4d59LtSh1ve6ePpxVgJQ7ZuEs05GowGOZAtx7ZDyfbpOj--MkMm4EnjwPLEBAuGARnfQy6$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GbkqGHT7Ybzo40AQ- wC87D8PIbVcdB4d59LtSh1ve6ePpxVgJQ7ZuEs05GowGOZAtx7ZDyfbpOj--MkMm4EnjwPLEBAuGNwebZSj$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 16, 2025 Via Electronic Submittal (E-File) David E. Capka, P.E., Director Federal Energy Regulatory Commission Division of Dam Safety and Inspections, Office of Energy Projects 888 First Street, N.E., Room 6N-01 Washington, D.C. 20426 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 12th Part 12D Inspection Plan for Comprehensive Assessment ENCLOSURE CONTAIN CUI//CEII – DO NOT RELEASE Dear David E. Capka: This letter presents Pacific Gas and Electric Company’s (PG&E) Part 12D inspection plan, including an independent consultant (IC) team proposal, for the comprehensive assessment (CA) of the following dam and appurtenant structures associated with PG&E’s DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. FERC provided PG&E the general requirements of the Part 12D CA for the following dam in a letter dated January 22, 2025. Dam Report No. Report Due Date Philbrook Dam 12th November 1, 2026 The enclosed Philbrook Dams Part 12D inspection plan (Enclosures 1) includes descriptions of project features to be inspected, a schedule for inspection-related activities, and IC team resumes. In accordance with Title 18 of the Code of Federal Regulations, Section 12.34, PG&E requests approval of the IC teams and potential failure mode and risk facilitator. PG&E’s schedule included in Enclosure 1 meets the requirement to have the IC team’s first field activity occur at least 180 days after submitting the Part 12D inspection plan. With FERC approval, PG&E and the IC team are available to perform the first project activity on approximately April 20, 2026, which would include submitting the pre-inspection preparation report 30 days before the activity begins. Document Accession #: 20251016-5144 Filed Date: 10/16/2025 David E. Capka, P.E., Director October 16, 2025 Page 2 Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359 -5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Twelfth FERC Part 12D Safety Inspection, Comprehensive Assessment, Inspection Plan for Philbrook Dams, prepared by Geosyntec and dated October 14, 2025 cc: via email w/enclosure and FERC accession number Frank L. Blackett, P.E., Regional Engineer cc: via hard copy w/enclosure Erik Malvick, Division Manager Department of Water Resources Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 Document Accession #: 20251016-5144 Filed Date: 10/16/2025 Document Content(s) PGE20251016_803_PhilbrookDam_P12_InspPlanCA_Ltr.pdf ......................1 Document Accession #: 20251016-5144 Filed Date: 10/16/2025