Loading...
HomeMy WebLinkAbout11.16.25 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-7242-000 by Eagle Creek Renewable Energy, LLCFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-7242-000 by Eagle Creek Renewable Energy, LLC Date:Monday, November 17, 2025 8:09:24 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, November 14, 2025 2:45 PM Subject: Dam Safety Compliance Report submitted in FERC P-7242-000 by Eagle Creek Renewable Energy, LLC .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/14/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Eagle Creek Renewable Energy, LLC Docket(s): P-7242-000 Lead Applicant: STS HydroPower, Ltd. Filing Type: Dam Safety Compliance Report Description: STS Hydropower LLC submits Supporting Design Report and Decommissioning Plan in response to FERC's 11/07/2025 letter re the Kanaka Hydroelectric Project under P-7242. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251114- 5250__;!!KNMwiTCp4spf!Gh2xJODBpqCH11mhNHMlQo0ryPNyrQYpoFUq7KCQG5j9ZoLI5JSNc1nfZwSDQVEjQm5mADT6ENdecoNFVDSaWQ0n1SGPN0-ZUQzd$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Gh2xJODBpqCH11mhNHMlQo0ryPNyrQYpoFUq7KCQG5j9ZoLI5JSNc1nfZwSDQVEjQm5mADT6ENdecoNFVDSaWQ0n1SGPNznOIhOm$ or for phone support, call 866-208-3676. VIA Electronic Filing November 14, 2025 Frank Blackett, Regional Engineer Federal Energy Regulatory Commission San Francisco Regional Office Re: Kanaka License Surrender (FERC P-7242-CA) Kanaka Decommission Plan Dear Mr. Blackett, This letter responds to your November 7, 2025, correspondence regarding STS Hydropower, LLC’s (STS) Kanaka Decommission Plan filings submitted on October 1 and October 29, 2025. Your letter requested a response within ten (10) days, by November 17, 2025. STS’s responses are provided below: Response to Comment 1: The contractor started mobilizing on October 8, 2025. Site demobilization is forecast for November 21, 2025. Response to Comment 2: Mr. Mel Koleber’s and Ms. Melissa Rondou’s resumes have been added to the Decommission Plan attached. Response to Comment 3: Section C of drawing 5 has been revised to clearly show the riprap extending to the top of the wing wall. The revised drawing set replaces the previously submitted drawings in the Decommission Plan, and the corresponding details have been updated in the Supporting Design Report. Both documents are attached. If you have any questions regarding this submittal, please contact Melvin Koleber at melvin.koleber@eaglecreekre.com or at 918-850-6976. Sincerely, STS Hydropower, LLC Melvin Koleber, P.E. Chief Dam Safety Engineer CC: Melissa Rondou, Director Licensing and Compliance Dale Short, Division Manager Sam Schleicher, Dam Safety Engineer Daniel Hacker, Project Manager Attachments: Kanaka Decommission Plan CUI/ CEII Kanaka Supporting Desing Report CUI/ CEII Document Accession #: 20251114-5250 Filed Date: 11/14/2025 Document Content(s) 2025-11-14_ECRE_KNKA_ReDecommissioning_PUB.pdf ...........................1 Document Accession #: 20251114-5250 Filed Date: 11/14/2025