Loading...
HomeMy WebLinkAbout11.07.25 Board Correspondence - FW_ Delegated Order issued in FERC P-803-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nuzum, Danielle; Loeser, Kamie Subject:Board Correspondence - FW: Delegated Order issued in FERC P-803-000 Date:Friday, November 7, 2025 8:49:41 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, November 7, 2025 8:25 AM Subject: Delegated Order issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/7/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company granting the 08/28/2025 request for an extension of time to submit the Final Construction Report by 01/31/2027 for the DeSabla Powerhouse, part of DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251107- 3023__;!!KNMwiTCp4spf!BkHuSvfy7p_cwjAFuOlGbg15F1F26Ol6cy4uZke7I0XhykMizGE_crE6xHCMYG8XMCNKI2pay8kvHmIn4ycDMW444pNAC8lEihF9$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BkHuSvfy7p_cwjAFuOlGbg15F1F26Ol6cy4uZke7I0XhykMizGE_crE6xHCMYG8XMCNKI2pay8kvHmIn4ycDMW444pNAC6TfeGJ8$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office November 7, 2025 In reply refer to: Project No. 803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Extension of Time Request for Final Construction Report for the Road Stabilization Project for DeSabla Powerhouse Dear Mr.Cruzen: This is in response to a letter dated August 28, 2025,from Mr. Kyle Ingvoldsen that submitted a request for an extension of time to submit a final construction report for repairing the road to DeSabla Powerhouse,which is part of DeSabla-Centerville Hydroelectric Project, FERC Project No. 803.We have reviewed your proposed extension of time and grant your request to submit the final construction report by January 31, 2027 as the project has been delayed and construction is now planned to be completed by November 1, 2026. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview.When eFiling, select Hydro: Dam Safety and San Francisco Regional Office from the eFiling menu.The cover page of the filing must indicate that the material was eFiled.For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20251107-3023 Filed Date: 11/07/2025 Frank L Blackett Digitally signed by Frank L Blackett Date: 2025.11.07 07:33:23 -08'00' Document Content(s) P-803-000_94889_DS PH Road Repair_EOT.docx.pdf ...........................1 Document Accession #: 20251107-3023 Filed Date: 11/07/2025