Loading...
HomeMy WebLinkAbout11.07.25 Board Correspondence - FW_ Compliance Directives issued in FERC P-7242-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nuzum, Danielle; Loeser, Kamie Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-7242-000 Date:Friday, November 7, 2025 8:50:01 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, November 7, 2025 7:40 AM Subject: Compliance Directives issued in FERC P-7242-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/7/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-7242-000 Lead Applicant: STS HydroPower, Filing Type: Compliance Directives General Correspondence Description: Letter to Eagle Creek Renewable Energy, LLC providing comments on the 10/01/2025 et al. Erosion Control Measures Plan, Quality Control and Inspection Plan, Supporting Design Report etc. re the Kanaka Hydroelectric Project under P-7242. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20251107-3015__;!!KNMwiTCp4spf!DidO- PY6SC70u9E5z6Q2vpC_itRVtkKDnsNmNaFxsXJlb2qZzxiARkdFBqRwB8piFBrBaZM43cT-82AlHfKBsvTR40nUXHA8R26A$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!DidO- PY6SC70u9E5z6Q2vpC_itRVtkKDnsNmNaFxsXJlb2qZzxiARkdFBqRwB8piFBrBaZM43cT-82AlHfKBsvTR40nUXDiiB-X_$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DidO- PY6SC70u9E5z6Q2vpC_itRVtkKDnsNmNaFxsXJlb2qZzxiARkdFBqRwB8piFBrBaZM43cT-82AlHfKBsvTR40nUXG3Z77p6$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office November 7, 2025 In reply refer to: Project No. 7242-CA VIA FERC Service Mr. David Fox Director Licensing and Compliance Eagle Creek Renewable Energy, LLC 116 N. State Street, P.O. Box 167 Neshkoro, WI 54960-0167 Re: Kanaka Decommission Plan Dear Mr.Fox: This is in response to letters dated October 1, 2025,and October 29, 2025,from Mr.Melvin Koleber that submitted the Erosion Control Measures Plan, Quality Control and Inspection Plan,Supporting Design Report and Temporary Construction Emergency Action Plan for the decommissioning of the Kanaka Hydroelectric Project, FERC No. 7242. We have reviewed the submittal, and we have the following comments: 1.Provide specific dates for the start and completion of the project. 2.Submit Mr. Mel Kolebers’s and Ms. Melissa Rondou’s resumes for our review and acceptance. The resumes must contain detailed experience roles and responsibilities that clearly indicate they are qualified for their roles and responsibilities for this project. 3.Paragraph 33 (D) FERC License Surrender Order states that you must fill the tailrace and grade the disturbed areas to match surrounding slopes.Section C of drawing 05 shows that the riprap is approximately 4 feet below the top of the wing wall,at the end of tailrace. This results in the top of wingwall not being level with the surrounding slopes. You must either cut the wing wall to match slope of the ripap or fill the riprap up to match the top of wing wall. Revise the drawing and resubmit for review. Document Accession #: 20251107-3015 Filed Date: 11/07/2025 2 Provided that you address the above comments within 10 days of the date of this letter, you are authorized to proceed with decommissioning of the Kanaka Project upon receipt of this letter. Failure to adequately address our comments within 10 days will require a suspension of all work until the comments are addressed. Within 30 days of completing decommissioning activities, you must file a final report, with photographs to this office, that documents the project facilities have been decommissioned. You are responsible for ensuring completion of any necessary environmental coordination with resource agencies as well as the procurement of any federal, state, or local permits required for the work. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program.If you have any questions, please contact Mr.Thao Bui at (415)369-3312. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20251107-3015 Filed Date: 11/07/2025 Frank L Blackett Digitally signed by Frank L Blackett Date: 2025.11.07 06:54:46 -08'00' Document Content(s) P-7242 98043 KanakaDecomisionPlan.docx.pdf................................1 Document Accession #: 20251107-3015 Filed Date: 11/07/2025