HomeMy WebLinkAbout11.04.25 Board Correspondence - FW_ Compliance Directives issued in FERC P-803-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nuzum, Danielle; Loeser, Kamie Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-803-000 Date:Tuesday, November 4, 2025 3:13:19 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, November 4, 2025 11:06 AM Subject: Compliance Directives issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/4/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives Delegated Order Description: Letter authorizing Pacific Gas and Electric Company to proceed with construction of the dam weir BW-44A at the Philbrook Dam, part of the DeSabla Centerville Hydroelectric Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251104- 3037__;!!KNMwiTCp4spf!GggHlnJElACQIx5uLrKS5V3jxAQt7dnyxeSFnwLpdHkiEo17D9YGak92L2_fccKD8cUas0KI7NwbLq62E1Lt-i2X6QIN0PutnBgP$ To modify your subscriptions, click here: i2X6QIN0LWrqIkE$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GggHlnJElACQIx5uLrKS5V3jxAQt7dnyxeSFnwLpdHkiEo17D9YGak92L2_fccKD8cUas0KI7NwbLq62E1Lt- i2X6QIN0LF5xZAw$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office November 4, 2025 In reply refer to: Project No. 803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric (PG&E)Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Authorization Request for Weir Modification Project Dear Mr.Cruzen: This is in response to a letter dated October 10, 2025,from Mr. Robert Ellis,that submitted a response to our comments on the authorization request to modify the dam weir BW-44A at Philbrook Dam,which is part of the DeSabla Centerville Hydroelectric Project, FERC Project No.803.We have reviewed the submittal,and we have no comments. You are authorized to proceed with the construction outlined in this revised weir modification construction package upon receipt of this letter. During construction, we typically require monthly construction reports. However, due to the short duration of this project, we will not require monthly construction reports. Within 90 days of completion of construction of the facilities authorized by this letter, or no later than 2/19/2026,you must file the following: 1.A final construction report, which addresses the applicable items in Enclosure 1. 2.The following construction certifications, which must be verified in accordance with Title 18, Section 12.13 of the Code of Federal Regulations (18 CFR 12.13): a.A certification by the Design Engineer that the project was constructed in accordance with the design intent. Document Accession #: 20251104-3037 Filed Date: 11/04/2025 2 b.A certification by the Quality Control Manager that the inspection and testing program resulted in the conclusion that the project was constructed in accordance with the plans and specifications reviewed by us. c.A certification by the Licensee (PG&E) that the project was constructed in accordance with the design intent and in accordance with the plans and specifications reviewed by us. Sample certifications are given in Enclosure 2. 3.Submit for our approval, revised Exhibits A, F, and G, as applicable, to describe and show those project facilities as built. If you determine that previously approved exhibits reflect the as-built facilities and no revisions are necessary, you must file a letter stating the approved exhibits reflect the as-built project facilities. To assist Commission staff in the review of any revised Exhibit A, we strongly recommend that you file a revised Exhibit A, in its entirety, in two forms: a.A strikethrough format (i.e., strikethrough items to be removed, and underline or bold items to be added to the exhibit), and b.A final, clean copy incorporating the changes (i.e., without the strikethrough, underline, and bold notations). You must separate Exhibit F drawings from the other project exhibits, and label and file them as Critical Energy Infrastructure Information (CEII) material under 18 CFR §388.113. The submission should consist of, as applicable: 1) a public portion consisting of a cover letter and the Exhibits A and G; and 2) a CEII portion containing only the Exhibit F drawings. EFile all revised exhibit drawings to the Secretary of the Commission with the transmittal addressed as follows: Ms. Debbie-Anne A. Reese Acting Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 If the plans and specifications are revised during the construction process, it is your responsibility to ensure that these changes are properly coordinated between the Design Engineer, the Resident Engineer, the Project Manager, us, and you, prior to proceeding with the changes. Also, you are reminded that no changes may be made to Document Accession #: 20251104-3037 Filed Date: 11/04/2025 3 the operation of the project without first coordinating those proposed changes with the FERC. You are responsible for ensuring completion of any necessary environmental coordination with resource agencies as well as the procurement of any federal, state, or local permits required for the work. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Erik Malvick -Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 c/o Shawn.Jones@water.ca.gov Document Accession #: 20251104-3037 Filed Date: 11/04/2025 Frank L Blackett Digitally signed by Frank L Blackett Date: 2025.11.04 10:11:11 -08'00' Items to be Addressed in Final Construction Report for Enclosure 1 Philbrook Weir Modification FERC No. 803 Page 1 of 1 FINAL CONSTRUCTION REPORTS FROM LICENSEES The Final Construction Report should be submitted within 90 days of completion of the work. This report should include all information pertinent to dam safety in a concise form. It should be included in the project file and should be given to the independent consultant for his or her safety inspection and analyses, if applicable. As such, the report should contain a summary of information in each of the applicable sections indicated below (the information was previously presented in the monthly reports). Construction difficulties should be reported under the appropriate sections. For conciseness, test results should be presented in a tabular format, with an indication of the applicable standards. Finally, in those cases where there is nothing to report under a specific heading, a statement of non-applicability will suffice. 1. General. Briefly present the reason for construction and description of the work with dates of the beginning and end of construction. Include reservoir drawdown and filing dates, and any findings regarding the original structure. 2. Foundations. Discuss the condition of the foundation (faults, etc.) and the treatment of the foundation. Attach a foundation mapping. 3. Embankments. Describe the equipment and the types of materials used in filters and fills. Attach gradation and compaction requirements and all test results. 4. Concrete work. Describe the equipment and the types of materials used in all concrete work. Include all grout test results and describe any surface treatments. 5. Anchors. Present a summary of any drilling operations, including boring logs; results of water pressure tests; anchor design calculations, design loads, and specifications; results of grout tests; results of proof and performance tests; and a summary of the acceptance criteria. 6. Instrumentation. Present plots of existing instrumentation readings taken during construction if the readings are affected by the work. Include a plan and schedule for calibration of all new instrumentation. 7. Drawings. Attach as-built drawings reduced in size to 8.5"x11" or 11"x17". The drawings should include plan and section views, and details of the structures affected by the new work. The plan and section views should show any new instrumentation that was installed as part of the work. Document Accession #: 20251104-3037 Filed Date: 11/04/2025 Enclosure 2 CERTIFICATION By Design Engineer CERTIFICATION OF CONSTRUCTION PAGE 1 OF 3 FERC Project No. Construction Project Description: Design Drawings/Specifications: Quality Control and Inspection Program (QCIP) dated: This is a certification by the Design Engineer that the project was constructed in accordance with the design intent. ***************************************************************************** VERIFICATION STATE OF CALIFORNIA ] COUNTY OF ],SS: The undersigned, being first duly sworn, states that he/she has read the above document and knows the contents of it, and that all of the statements contained in that document are true and correct, to the best of his/her knowledge and belief (per 18CFR Part 12, Paragraph 12.13). Design Engineer (Print Name) Signature [STAMP] Sworn to and subscribed before me this day of , 20 NOTARY PUBLIC [SEAL] Document Accession #: 20251104-3037 Filed Date: 11/04/2025 Enclosure 2 CERTIFICATION By Quality Control Manager CERTIFICATION OF CONSTRUCTION PAGE 2 OF 3 FERC Project No. Construction Project Description: Design Drawings/Specifications: Quality Control and Inspection Program (QCIP) dated: This is a certification by the Quality Control Manager that the inspection and testing program resulted in the conclusion that the project was constructed in accordance with the plans and specifications reviewed by the Commission. ***************************************************************************** VERIFICATION STATE OF CALIFORNIA ] COUNTY OF ],SS: The undersigned, being first duly sworn, states that he/she has read the above document and knows the contents of it, and that all of the statements contained in that document are true and correct, to the best of his/her knowledge and belief (per 18CFR Part 12, Paragraph 12.13). Quality Control Manager (Print Name) Signature [STAMP] Sworn to and subscribed before me this day of , 20 NOTARY PUBLIC [SEAL] Document Accession #: 20251104-3037 Filed Date: 11/04/2025 Enclosure 3 CERTIFICATION By Licensee or Exemptee CERTIFICATION OF CONSTRUCTION PAGE 3 OF 3 FERC Project No. Construction Project Description: Design Drawings/Specifications: Quality Control and Inspection Program (QCIP) dated: This is a certification by the Licensee or Exemptee that the project was constructed in accordance with the design intent and in accordance with the plans and specifications reviewed by the Commission. ************************************************************************ ***** VERIFICATION STATE OF CALIFORNIA ] COUNTY OF ],SS: The undersigned, being first duly sworn, states that he/she has read the above document and knows the contents of it, and that all of the statements contained in that document are true and correct, to the best of his/her knowledge and belief (per 18CFR Part 12, Paragraph 12.13). For Licensee or Exemptee (Print Name) Signature [STAMP] Sworn to and subscribed before me this day of , 20 NOTARY PUBLIC [SEAL] Document Accession #: 20251104-3037 Filed Date: 11/04/2025 Document Content(s) P-803-000_97082,-3-4_Weir Mod-Philbrook Const_Rev.docx.pdf ...............1 Document Accession #: 20251104-3037 Filed Date: 11/04/2025