Loading...
HomeMy WebLinkAbout11.03.25 Board Correspondence_ FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:BOS Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence: FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Monday, November 3, 2025 9:28:27 AM Please see Board Correspondence Sharleen L Krater Administrative Analyst – Supervisor (530) 552-3353 Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 "COUNTY OF BUTTE E-MAIL DISCLAIMER: This e-mail and any attachment thereto may contain private, confidential, and privileged material for the sole use of the intended recipient. Any review, copying, or distribution of this e-mail (or any attachments thereto) by other than the County of Butte or the intended recipient is strictly prohibited. If you are NOT the intended recipient, please contact the sender immediately and permanently delete the original and any copies of this e-mail and any attachments thereto." -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, November 3, 2025 6:25 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/3/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits Comprehensive Assessment Report for the 12th Part 12D Safety Inspection of the Grizzly Forebay Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251103- 5013__;!!KNMwiTCp4spf!FF0uay_ONIdhSmau- Bdrg8k9Jg7cWxfbwCWi2yRuzbcz1EbBAJXTgpl4U0xV6S246FYWM9aCnsgUxfSqRSxoBdMgeqRdZOwGS4vn$ To modify your subscriptions, click here: Bdrg8k9Jg7cWxfbwCWi2yRuzbcz1EbBAJXTgpl4U0xV6S246FYWM9aCnsgUxfSqRSxoBdMgeqRdZLT6eEPT$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FF0uay_ONIdhSmau- Bdrg8k9Jg7cWxfbwCWi2yRuzbcz1EbBAJXTgpl4U0xV6S246FYWM9aCnsgUxfSqRSxoBdMgeqRdZMB2q_or$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 31, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Grizzly Forebay Dam, NATDAM No. CA00333 12th Part 12D Inspection – Comprehensive Assessment Report ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents the comprehensive assessment (CA) report for the 12th Part 12D safety inspection for Grizzly Forebay Dam, which is part of Pacific Gas and Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. The report was prepared in accordance with Title 18 of the Code of Federal Regulations (CFR), Section 12.38 FERC authorized the inspection plan and independent consultant (IC) team for this dam in a letter to PG&E dated February 26, 2025. PG&E provided the CA pre-inspection preparation report to FERC in a letter dated March 19, 2025. The CA report is enclosed with this letter for FERC review (Enclosure 1). In accordance with Title 18 of the CFR, Section 12.41, PG&E will prepare plans and schedules for addressing IC recommendations. PG&E will submit the plans and schedules to FERC by December 30, 2025. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. 12th Part 12D Inspection Comprehensive Assessment – Inspection Plan, Grizzly Forebay Dam, prepared by HDR Engineering, Inc. and dated October 31, 2025 cc: See Attached List Document Accession #: 20251103-5013 Filed Date: 11/03/2025 Frank L. Blackett, P.E. Regional Engineer October 31, 2025 Page 2 cc: via hard copy w/enclosure Erik Malvick, Ph.D., P.E., G.E., Division Manager Department of Water Resources, Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 via secure file transfer w/enclosure Russ Bowlus, Area Engineer Department of Water Resources, Division of Safety of Dams russell.bowlus@water.ca.gov Document Accession #: 20251103-5013 Filed Date: 11/03/2025 Document Content(s) PGE20251031_619_Grizzly_Part12_InspectionReport_CA_Ltr.pdf ...............1 Document Accession #: 20251103-5013 Filed Date: 11/03/2025