HomeMy WebLinkAbout11.03.25 Board Correspondence_ FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:BOS
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence: FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific
Gas and Electric Company
Date:Monday, November 3, 2025 9:28:27 AM
Please see Board Correspondence
Sharleen L Krater
Administrative Analyst – Supervisor
(530) 552-3353
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
"COUNTY OF BUTTE E-MAIL DISCLAIMER: This e-mail and any attachment thereto may contain private,
confidential, and privileged material for the sole use of the intended recipient. Any review, copying, or distribution
of this e-mail (or any attachments thereto) by other than the County of Butte or the intended recipient is strictly
prohibited. If you are NOT the intended recipient, please contact the sender immediately and permanently delete the
original and any copies of this e-mail and any attachments thereto."
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, November 3, 2025 6:25 AM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric
Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 11/3/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC),
Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: Pacific Gas and Electric Company submits Comprehensive Assessment Report for the 12th Part 12D
Safety Inspection of the Grizzly Forebay Dam of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251103-
5013__;!!KNMwiTCp4spf!FF0uay_ONIdhSmau-
Bdrg8k9Jg7cWxfbwCWi2yRuzbcz1EbBAJXTgpl4U0xV6S246FYWM9aCnsgUxfSqRSxoBdMgeqRdZOwGS4vn$
To modify your subscriptions, click here:
Bdrg8k9Jg7cWxfbwCWi2yRuzbcz1EbBAJXTgpl4U0xV6S246FYWM9aCnsgUxfSqRSxoBdMgeqRdZLT6eEPT$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FF0uay_ONIdhSmau-
Bdrg8k9Jg7cWxfbwCWi2yRuzbcz1EbBAJXTgpl4U0xV6S246FYWM9aCnsgUxfSqRSxoBdMgeqRdZMB2q_or$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
October 31, 2025
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Grizzly Forebay Dam, NATDAM No. CA00333
12th Part 12D Inspection – Comprehensive Assessment Report
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents the comprehensive assessment (CA) report for the 12th Part 12D safety
inspection for Grizzly Forebay Dam, which is part of Pacific Gas and Electric Company’s (PG&E)
Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. The
report was prepared in accordance with Title 18 of the Code of Federal Regulations (CFR), Section
12.38 FERC authorized the inspection plan and independent consultant (IC) team for this dam in a
letter to PG&E dated February 26, 2025. PG&E provided the CA pre-inspection preparation report
to FERC in a letter dated March 19, 2025.
The CA report is enclosed with this letter for FERC review (Enclosure 1). In accordance with Title
18 of the CFR, Section 12.41, PG&E will prepare plans and schedules for addressing IC
recommendations. PG&E will submit the plans and schedules to FERC by December 30, 2025.
Should you have technical questions concerning this matter, please contact Ben Fontana, senior
dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew
Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. 12th Part 12D Inspection Comprehensive Assessment – Inspection Plan, Grizzly Forebay Dam,
prepared by HDR Engineering, Inc. and dated October 31, 2025
cc: See Attached List
Document Accession #: 20251103-5013 Filed Date: 11/03/2025
Frank L. Blackett, P.E. Regional Engineer
October 31, 2025
Page 2
cc: via hard copy w/enclosure
Erik Malvick, Ph.D., P.E., G.E., Division Manager
Department of Water Resources, Division of Safety of Dams
2720 Gateway Oaks Drive, Suite 300
Sacramento, CA 95833
via secure file transfer w/enclosure
Russ Bowlus, Area Engineer
Department of Water Resources, Division of Safety of Dams
russell.bowlus@water.ca.gov
Document Accession #: 20251103-5013 Filed Date: 11/03/2025