Loading...
HomeMy WebLinkAbout10.28.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, October 28, 2025 4:29:27 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, October 28, 2025 1:50 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/28/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits 12th Part 12D Periodic Inspection Report re the Bucks Diversion Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251028- 5180__;!!KNMwiTCp4spf!CcwFBRSKLVVyWBku3yf3PxcjFmoAP2CNmSDb1ETn8XTjjUKtutvoq7LFAvfgzRl5Zek8ikGMi_P65Mgg_KmXTu45Oj-YaTp8HaPF$ To modify your subscriptions, click here: YafBzNf9p$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CcwFBRSKLVVyWBku3yf3PxcjFmoAP2CNmSDb1ETn8XTjjUKtutvoq7LFAvfgzRl5Zek8ikGMi_P65Mgg_KmXTu45Oj- YacA34Km2$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 28, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 12th Part 12D Inspection – Periodic Inspection Report ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents the periodic inspection (PI) report for the 12th Part 12D safety inspection for Bucks Diversion Dam, which is part of Pacific Gas and Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. The report was prepared in accordance with Title 18 of the Code of Federal Regulations (CFR), Section 12.36. FERC authorized the inspection plan and independent consultant (IC) team for this dam in a letter to PG&E dated February 11, 2025. PG&E provided the PI pre-inspection preparation report to FERC in a letter dated May 16, 2025. The PI report is enclosed with this letter for FERC review (Enclosure 1). In accordance with Title 18 of the CFR, Section 12.41, PG&E will prepare plans and schedules for addressing IC recommendations. PG&E will submit the plans and schedules to FERC by January 1, 2026. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. 12th Part 12D Inspection, Periodic Inspection Report, Bucks Diversion Dam, prepared by HDR Engineering and dated October 20, 2025 Document Accession #: 20251028-5180 Filed Date: 10/28/2025 Document Content(s) PGE20251028_619_BucksDiversion_P12PI_InspRpt_Ltr.pdf......................1 Document Accession #: 20251028-5180 Filed Date: 10/28/2025