HomeMy WebLinkAbout12.16.25 Board Correspondence - FW_ Compliance Directives issued in FERC P-2088-085From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nuzum, Danielle
Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-2088-085
Date:Tuesday, December 16, 2025 8:08:10 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, December 16, 2025 8:06 AM
Subject: Compliance Directives issued in FERC P-2088-085
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 12/16/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-2088-085
Lead Applicant: South Feather Water & Power Agency
Filing Type: Compliance Directives
Description: Letter to South Feather Water and Power Agency requesting additional information to be filed within 45 days re the reservoir water elevation filed on 08/05/25 etc. for the Little Grass Valley
Reservoir, upstream of the South Feather Power Proj., P-2088.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251216-
3037__;!!KNMwiTCp4spf!AuuPulPHPy6Pa0ifzEN13X5yarjguhu7Tidie_V3Ww6_S3S9NfamphWArKxkrJ5JYyOSgtDzekiKuqQpBJc1-uT6MyqByGnN249e$
To modify your subscriptions, click here:
uT6MyqByBF2ccYo$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AuuPulPHPy6Pa0ifzEN13X5yarjguhu7Tidie_V3Ww6_S3S9NfamphWArKxkrJ5JYyOSgtDzekiKuqQpBJc1-
uT6MyqByOZ8__Sx$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Washington, D. C. 20426
OFFICE OF ENERGY PROJECTS
Project No. 2088-085 – California
South Feather Power Project
South Feather Water and Power Agency
December 16, 2025
VIA FERC Service
Rath Moseley
General Manager
South Feather Water and Power Agency
2310 Oro Quincy Highway
Oroville, CA 95966
Subject: Project Operation Investigation - Data and Additional Information Request
Dear Rath Moseley:
This letter is in regard to a comment we received about project operations
affecting the private property on the Little Grass Valley Reservoir, upstream of the South
Feather Power Project No. 2088.1 In a comment by Dominic Dominguez filed with the
Commission on August 5, 2025,2 Mr. Dominguez alleges that the reservoir water
elevation rapidly dropped in late July of 2025, and that the affected property owners were
not given advanced notice of the drawdown as they were in past years.
Background
Article 30 of the license requires you to regulate the releases from the Grass
Valley Reservoir and the Slate Creek Reservoir so that such releases will be at as uniform
a rate as practicable. During the fishing season, as prescribed from time to time by the
California State Department of Fish and Game, the releases shall not be increased or
decreased by more than 20 cubic feet per second (cfs) during any successive hour.
During flood periods releases from the reservoirs shall be limited to an amount not
greater than the inflows.
1 Oroville-Wyandotte Irrigation District, 11 FCP ¶ 1129 (1952).
2 See FERC Accession Number: 20250805-5001.
Document Accession #: 20251216-3037 Filed Date: 12/16/2025
Project No. 2088-085 - 2 -
Article 32 requires you to make every effort to maintain the water surface of the
several reservoirs at the maximum elevation and with a minimum fluctuation from
June 15 to September 15 of each year as is consistent with the primary purpose of the
reservoir. You provide annual notifications of planned, non-emergency drawdowns of
project facilities for the purpose of annual maintenance pursuant to 18 CFR§12.4(b).3
Summary of the Complaint
Mr. Dominguez’s August 5, 2025 filing expresses concerns with the project that
he states occurred in both 2024 and 2025. The concerns are related to a rapid drop in
water reservoir elevation on the Little Grass Valley Reservoir in late July 2025, and that
property owners around the Little Grass Valley Reservoir were not notified of the drop.
Mr. Dominguez states that the water elevation of the reservoir at his property dropped by
nine feet. Mr. Dominquez also describes the effects on the people that live near the
project and how they were scrambling to push their docks and boats out to prevent
damage from occurring. Furthermore, Mr. Dominguez states that the affected property
owners were not given advanced notice of the drawdown as they were in past years, and
that a similar event occurred last year, which resulted in several property owners
contacting you to request advanced notice of reservoir drawdown events. Mr.
Dominguez concludes his letter by asking why property owners around Little Grass
Valley Reservoir no longer receive advanced notification of drawdowns.
Data and Additional Information Request
In order to complete our review and determine if you have been operating the
project as required by your license, we request that you file the following, within 45 days
from the date of this letter:
1. All measured operations data (i.e., reservoir level and outgoing flow) in the
smallest time increment available for the time period of May 1, 2025, through
August 5, 2025, for/from the Little Grass Valley Reservoir. This must include
releases level, and flow. Also include a description of the method and/or
equipment used to measure each type of operations data.
a. Explain which data source you used to report operations data.
b. The operational data must be in an electronic spreadsheet format (excel
or similar software).
3 See FERC Accession Nos. 20230828-5282 and 20240815-5050.
Document Accession #: 20251216-3037 Filed Date: 12/16/2025
Project No. 2088-085 - 3 -
c. If relevant, you must indicate any periods when you did not comply with
the operational requirements of your license. You must explain the
cause, duration, and environmental effects observed for the deviation.
You must also describe any corrective measures you implemented as a
result of the deviation.
d. Any additional data or information that you believe will demonstrate
your compliance with the operating requirements of your license for the
time period.
2. Any other relevant data that might help us in our investigation of the comment.
The Commission strongly encourages electronic filing. Please file the requested
information using the Commission’s eFiling system at
https://www.ferc.gov/media/efiling-user-guide. For assistance, please contact FERC
Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions
sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426. Submissions sent via any other carrier must be addressed to:
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, MD 20852. The first page of any filing should include
docket number P-2088-085.
Thank you for your cooperation, and if you have any questions, please contact
Mark Mattozzi at (202) 502-8087 or Mark.Mattozzi@ferc.gov.
Sincerely,
Kelly Houff
Chief, Engineering Resources Branch
Division of Hydropower Administration
and Compliance
CC: VIA FERC Service
Dominic Dominguez
2826 Little Grass Valley Rd
P.O. Box 333
La Porte, CA 95930
Document Accession #: 20251216-3037 Filed Date: 12/16/2025
KELLY
HOUFF
Digitally signed by KELLY
HOUFF
Date: 2025.12.16
08:47:05 -05'00'
Document Content(s)
P-2088-085.pdf............................................................1
Document Accession #: 20251216-3037 Filed Date: 12/16/2025