Loading...
HomeMy WebLinkAbout12.11.25 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nuzum, Danielle; Loeser, Kamie Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Friday, December 12, 2025 8:21:12 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, December 11, 2025 1:56 PM Subject: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/11/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits response to FERC's 12/03/2025 comments re the removal of dead and hazardous trees, at the Philbrook Dam, part of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251211- 5235__;!!KNMwiTCp4spf!GSM2isEtdTG7WuyErN7LIjZkg_L9yQoiXrZEX01JeuhW8Gzks5ptAbLm3vCbGRb2PSl_y52r743lgjX1UPD-cucq9D4oQUXvNQ6M$ To modify your subscriptions, click here: cucq9D4oQebMmcPz$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GSM2isEtdTG7WuyErN7LIjZkg_L9yQoiXrZEX01JeuhW8Gzks5ptAbLm3vCbGRb2PSl_y52r743lgjX1UPD- cucq9D4oQUdQaDoK$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 December 11, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Notification of Hazard Tree Removal – Responses to FERC Comments ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) responses to address the Federal Energy Regulatory Commission’s (FERC) comments (C-1, C-2, and C-3) on the removal of dead and hazardous trees, at Philbrook Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. PG&E received FERC’s comments in a letter dated December 3, 2025, which included FERC’s authorization to implement the tree-removal project provided that PG&E addresses the comments within 10 days. PG&E's responses to C-1, C-2, and C-3 are enclosed with this letter (Enclosure 1). PG&E believes Comments 1, 2, and 3 have been satisfactorily addressed based on the information enclosed with this letter. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Responses to FERC Comments Regarding Notification of Hazard Tree Removal Document Accession #: 20251211-5235 Filed Date: 12/11/2025 Document Content(s) PGE20251211_803_Philbrook_HarzardTreeRem_Resp_Ltr.pdf ....................1 Document Accession #: 20251211-5235 Filed Date: 12/11/2025