HomeMy WebLinkAbout12.11.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by
Pacific Gas and Electric Company
Date:Thursday, December 11, 2025 10:25:00 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, December 11, 2025 9:26 AM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric
Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 12/11/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC),
Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: Pacific Gas and Electric Company submits plan and schedule to address Recommendations 1-4 from
the Twelfth Part 12D Safety Inspection Report for the Bucks Storage Dam of the Bucks Creek Hydroelectric Project
under P-619.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251211-
5098__;!!KNMwiTCp4spf!Enfn-z3Evugh8n4PfmLm3gpbKr-
yl0uTW72pR2GcWgeEfPfBv8i9VX_ZkThM2NQPtHP7Cqfnk4WF8pwGD0x1gv3ARyCLZSKPdODy$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Enfn-
z3Evugh8n4PfmLm3gpbKr-
yl0uTW72pR2GcWgeEfPfBv8i9VX_ZkThM2NQPtHP7Cqfnk4WF8pwGD0x1gv3ARyCLZRf5f_GW$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Enfn-
z3Evugh8n4PfmLm3gpbKr-
yl0uTW72pR2GcWgeEfPfBv8i9VX_ZkThM2NQPtHP7Cqfnk4WF8pwGD0x1gv3ARyCLZfDt3ZKF$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
December 11, 2025
Via Electronic Submittal (E-file)
Frank L. Blackett P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Storage Dam, NATDAM No. CA00332
12th Part 12D Inspection – Plans and Schedules for Recommendations 1–4
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) plans and schedules to
address recommendations from the 12th Part 12D safety inspection report (periodic
inspection [PI]) (dated November 2025) for Bucks Storage Dam, which is part of PG&E’s
Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619.
PG&E prepared the plans and schedules in accordance with Title 18 of the Code of Federal
Regulation (CFR), Section 12.41. PG&E submitted the PI report to FERC in a letter dated
October 15, 2025.
PG&E’s proposed plans and schedules to address the recommendations are enclosed with
this letter for FERC review (Enclosure 1). In accordance with Title 18 of the CFR, Section
12.41(a)(2), PG&E plans to provide its first annual status report on the PI report
recommendations by December 31, 2026.
Should you have technical questions concerning this matter, please contact Ben Fontana,
senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please
contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Plans and Schedules for Recommendations from the 12th Part 12D Inspection –Periodic
Inspection Report
Document Accession #: 20251211-5098 Filed Date: 12/11/2025
Document Content(s)
PGE20251211_619_BucksStg_12thPart12D_PI_P&S_Ltr.pdf ......................1
Document Accession #: 20251211-5098 Filed Date: 12/11/2025