Loading...
HomeMy WebLinkAbout12.05.25 Board Correspondence - FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-619-000 Date:Friday, December 5, 2025 4:28:21 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, December 5, 2025 10:06 AM Subject: Compliance Directives issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/5/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Delegated Order Description: Letter to Pacific Gas and Electric Company providing comments on the 07/16/2025 hazard tree removal plan for the Bucks Lake Dam, part of the Bucks Creek Hydroelectric Project under the P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251205- 3039__;!!KNMwiTCp4spf!BXaTUEMOmtPeAmsOT9_nA7kyg1FNLTuMrB_JWeAk7e39PHfLjfU1BC690LQ6S9ixqrpz8l3r5lg2s-gFwfbkrEouO-rVuNjUyQ7C$ To modify your subscriptions, click here: gFwfbkrEouO-rVuIF73ulC$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BXaTUEMOmtPeAmsOT9_nA7kyg1FNLTuMrB_JWeAk7e39PHfLjfU1BC690LQ6S9ixqrpz8l3r5lg2s- gFwfbkrEouO-rVuJR42Glw$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office December 5, 2025 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Tree Removal Dear Mr. Cruzen: This is in response to a letter dated July 16, 2025,from Mr. Robert Ellis submitting a hazard tree removal plan for Bucks Lake Dam, which is part of the Bucks Creek Hydroelectric Project, FERC No. 619. We have reviewed the submittal,which indicates that the tree removal project will potentially consist of three separate projects over the next 10 years. We have following comments: 1.Your request of a target completion year of 2035 is unacceptable for the following reasons: a.Refer to our authorization letter dated March 13, 2025 where we requested that you provide a brief report documenting the work within 90 days completion of the tree removal or by no later than March 31, 2027, whichever comes first.If additional time is required beyond this date, you must request an extension of time with an exact due date the report will be submitted. b.The access road and spillway projects are scheduled to occur somewhere in the next 3 to 10 years. With the changes already noted in your approach to these projects, we cannot authorize tree removal without having precise designs that could influence the permitting of the access road and spillway project. 2.You state that the work will occur after September 1st because of our comment regarding additional consultation required for work between February 15th and August 31st in any given year. We remind you that any work started after Document Accession #: 20251205-3039 Filed Date: 12/05/2025 2 September 1st must be completed prior to February 15th of the following year or the additional consultation with the agencies noted in our March 13, 2025, letter is required. 3.Provide an updated submittal requesting authorization only for the trees at the toe of the dam not associated with the future spillway or access road project. Provide a specific date for the completion of the removal of these trees. Within 45 days of the date of this letter, provide a response to our comments or a plan and schedule to address our comments. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. For all Dam Safety and Public Safety Documents, select Hydro: Regional Office and San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Erik Malvick -Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 c/o Shawn.Jones@water.ca.gov Document Accession #: 20251205-3039 Filed Date: 12/05/2025 Frank L Blackett Digitally signed by Frank L Blackett Date: 2025.12.05 09:36:56 -08'00' Document Content(s) P-619-000_93361_Tree Removal-Bucsk Lake-Auth.docx.pdf ....................1 Document Accession #: 20251205-3039 Filed Date: 12/05/2025