Loading...
HomeMy WebLinkAbout12.05.25 Board Correspondence - FW_ Delegated Order issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Delegated Order issued in FERC P-619-000 Date:Friday, December 5, 2025 4:27:49 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, December 5, 2025 1:26 PM Subject: Delegated Order issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/5/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company accepting the 10/20/2025 plan and schedule to address Part 12D Field Inspection follow-up items for the Grizzly Forebay Dam et al., parts of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251205- 3057__;!!KNMwiTCp4spf!AmlNrwBENvPgdgA5CCEEUeQx2XJ0MxBdw8yjbpbK3lAv42fUVWjNE2pCgaCCi8bVXjbXXSd-9wLoLmlVa4c_PKTemRaJMJS2-6uj$ To modify your subscriptions, click here: 9wLoLmlVa4c_PKTemRaJMBxIykTZ$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AmlNrwBENvPgdgA5CCEEUeQx2XJ0MxBdw8yjbpbK3lAv42fUVWjNE2pCgaCCi8bVXjbXXSd- 9wLoLmlVa4c_PKTemRaJMDn99Gkf$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office December 5, 2025 In reply refer to: Project No.619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:2025 Follow-up Part 12D Field Inspections Dear Mr.Cruzen: This is in response to a letter dated October 20, 2025,from Mr. Robert Ellis that submitted a plan and schedule to address Part 12D field inspection follow-up items for Grizzly Forebay Dam and for Lower Bucks Lake Dam,which are part of the Bucks Creek Hydroelectric Project,FERC No. 619. The plan and schedule for submittal of multiple items by the multiple dates in your letter is acceptable File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your cooperation in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20251205-3057 Filed Date: 12/05/2025 Frank L Blackett Digitally signed by Frank L Blackett Date: 2025.12.05 12:52:43 -08'00' Document Content(s) P-619-000_97634_I1-3_P12DInsp_GrizzlyLower.docx.pdf ......................1 Document Accession #: 20251205-3057 Filed Date: 12/05/2025