Loading...
HomeMy WebLinkAbout12.03.25 Board Correspondence - FW_ Compliance Directives issued in FERC P-803-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-803-000 Date:Thursday, December 4, 2025 8:32:22 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, December 3, 2025 11:56 AM Subject: Compliance Directives issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/3/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company providing comments on the 09/04/2025 hazard tree removal plan for the Philbrook Dam, part of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251203- 3066__;!!KNMwiTCp4spf!AeRHXvpEi3K32qeUWJ8mOVEjxDdD2umlFwV3- g1zZ47cT5PCBoUOHcJy2v6j4x25z8TjYKLVLorKNgvJokSPgZaGmlVt7gesmPYC$ To modify your subscriptions, click here: g1zZ47cT5PCBoUOHcJy2v6j4x25z8TjYKLVLorKNgvJokSPgZaGmlVt7uPPwD_x$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AeRHXvpEi3K32qeUWJ8mOVEjxDdD2umlFwV3- g1zZ47cT5PCBoUOHcJy2v6j4x25z8TjYKLVLorKNgvJokSPgZaGmlVt7nZHmOo6$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office December 3, 2025 In reply refer to: Project No. 803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Notification of Hazard Tree Removal Dear Mr. Cruzen: This is in response to a letter dated September 4, 2025,from Mr. Robert Ellis that submitted a hazard tree removal plan for Philbrook Dam, which is part of the DeSabla- Centerville Hydroelectric Project, FERC No. 803. The project consists of cutting several trees but leaving the stumps in place.We have reviewed the submittal,and we have following comments: 1.We note that you indicate any observed changes will be discussed during annual inspections. That is unacceptable. If you encounter any changes, unplanned circumstances, or anything potentially impacting the safety of the dam during the tree removal it must be reported to us immediately. Similarly, any potential dam safety items noted during the year must be immediately reported to us. 2.Provide a firm date for completion of this project. 3.Upon completion of the removal of the trees, submit a brief report summarizing the work and any unusual conditions or items that are important to document for future reference. Provided that you address the above comments within 10 days of the date of this letter, you are authorized to proceed with the tree removal upon receipt of this letter. Failure to adequately address our comment within 10 days will require a suspension of all work until the comment is addressed. Document Accession #: 20251203-3066 Filed Date: 12/03/2025 2 You are responsible for ensuring completion of any necessary environmental coordination with resource agencies as well as the procurement of any federal, state, or local permits required for the work. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20251203-3066 Filed Date: 12/03/2025 Frank L Blackett Digitally signed by Frank L Blackett Date: 2025.12.03 10:28:00 -08'00' Document Content(s) P-803-000_95336 Tree Removal_Philbrook-Auth.docx.pdf......................1 Document Accession #: 20251203-3066 Filed Date: 12/03/2025