Loading...
HomeMy WebLinkAbout11.20.25 Board Correspondence - FW_ Annual Spill Gate Testing Report submitted in FERC P-2088-000 by Individual No Affiliation,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Annual Spill Gate Testing Report submitted in FERC P-2088-000 by Individual No Affiliation,et al. Date:Thursday, November 20, 2025 8:06:41 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, November 20, 2025 7:55 AM Subject: Annual Spill Gate Testing Report submitted in FERC P-2088-000 by Individual No Affiliation,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/20/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Individual No Affiliation South Feather Water & Power Agency (as Agent) Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: Annual Spill Gate Testing Report Description: South Feather Water and Power Agency submits 2025 Annual Spillway Gate Operation Certificates re the Little Grass Valley Dam et al. of the South Fork Power Project under P-2088. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251120- 5077__;!!KNMwiTCp4spf!DVzMwwIFlZLVZPfOMeoI8XiWD1PIH_NghxdA3SuBQRVM3VUJ4IXpNg_zDZqPwm9ghrSacluVhcqhcEHEZxGienYpcCDikqHZVXS2$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DVzMwwIFlZLVZPfOMeoI8XiWD1PIH_NghxdA3SuBQRVM3VUJ4IXpNg_zDZqPwm9ghrSacluVhcqhcEHEZxGienYpcCDikrskvESk$ or for phone support, call 866-208-3676. November 20, 2025 Filed electronically Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105 RE: South Feather Power Project (FERC No. 2088) 2025 Annual Spillway Gate Operation Certificates (Little Grass Valley/Ponderosa Reservoirs) Dear Mr. Blackett, This serves as the transmittal our Agency’s 2025 Annual Spillway Gate Operation Certificates for Little Grass Valley and Ponderosa Reservoirs. Both of these inspections were conducted in accordance with 18 CFR § 12.54 requirements. If you have any questions related to this filing, please feel free to contact me at (530) 532-1348, or via email at kmckillop@southfeather.com. Sincerely, South Feather Water and Power Agency Attachments: CUI//CEII documents submitted separately cc: Hunter Doyle, Power Division Manager Brian Howerton, Maintenance Foreman KRISTEN MCKILLOP REGULATORY COMPLIANCE MANAGER Document Accession #: 20251120-5077 Filed Date: 11/20/2025 Document Content(s) to FERC_11202025_transmit annual spillway gate certs_CEII TRANSMITTAL.pdf.1 Document Accession #: 20251120-5077 Filed Date: 11/20/2025