Loading...
HomeMy WebLinkAbout11.19.25 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Monday, November 24, 2025 4:45:47 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, November 19, 2025 9:05 AM Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/19/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits Low-Level Outlet Inspection Report re the Philbrook Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20251119-5069__;!!KNMwiTCp4spf!DydWQS3FU3WYKe7BxCwkY-cQ6-F08WObyknJs- mY2sn69nEeZPf2bOumK33SdVapVMAVf1z4Fr3cUrgPtE4sKANRhlKn0YFEasKC$ To modify your subscriptions, click here: cQ6-F08WObyknJs-mY2sn69nEeZPf2bOumK33SdVapVMAVf1z4Fr3cUrgPtE4sKANRhlKn0el9A6ug$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DydWQS3FU3WYKe7BxCwkY-cQ6- F08WObyknJs-mY2sn69nEeZPf2bOumK33SdVapVMAVf1z4Fr3cUrgPtE4sKANRhlKn0T8NQ-Lw$ or for phone support, call 866-208-3676. ENCLOSURE MEMO Date: November 19, 2025 To: Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 From: Andrew Garcia License coordinator Subject: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Low-Level Outlet Inspection The following submittal is marked CUI//CEII – DO NOT RELEASE regarding the above-subject matter. Thank you! Document Accession #: 20251119-5069 Filed Date: 11/19/2025 Document Content(s) PGE20251119_803_Philbrook_LLOInspection_Rpt_memo.pdf......................1 Document Accession #: 20251119-5069 Filed Date: 11/19/2025