HomeMy WebLinkAbout11.19.25 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa;
Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug;
Zepeda, Elizabeth; Loeser, Kamie
Cc:Nuzum, Danielle
Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric
Company,et al.
Date:Monday, November 24, 2025 4:45:47 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, November 19, 2025 9:05 AM
Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments,
clicking on links, or replying..
On 11/19/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Dam Safety Compliance Report
Description: Pacific Gas and Electric Company submits Low-Level Outlet Inspection Report re the Philbrook Dam of the
DeSabla-Centerville Hydroelectric Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20251119-5069__;!!KNMwiTCp4spf!DydWQS3FU3WYKe7BxCwkY-cQ6-F08WObyknJs-
mY2sn69nEeZPf2bOumK33SdVapVMAVf1z4Fr3cUrgPtE4sKANRhlKn0YFEasKC$
To modify your subscriptions, click here:
cQ6-F08WObyknJs-mY2sn69nEeZPf2bOumK33SdVapVMAVf1z4Fr3cUrgPtE4sKANRhlKn0el9A6ug$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DydWQS3FU3WYKe7BxCwkY-cQ6-
F08WObyknJs-mY2sn69nEeZPf2bOumK33SdVapVMAVf1z4Fr3cUrgPtE4sKANRhlKn0T8NQ-Lw$
or for phone support, call 866-208-3676.
ENCLOSURE MEMO
Date: November 19, 2025
To: Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
From: Andrew Garcia
License coordinator
Subject: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Philbrook Dam, NATDAM No. CA00345
Low-Level Outlet Inspection
The following submittal is marked CUI//CEII – DO NOT RELEASE regarding
the above-subject matter.
Thank you!
Document Accession #: 20251119-5069 Filed Date: 11/19/2025
Document Content(s)
PGE20251119_803_Philbrook_LLOInspection_Rpt_memo.pdf......................1
Document Accession #: 20251119-5069 Filed Date: 11/19/2025