Loading...
HomeMy WebLinkAbout12.01.25 Board Correspondence - FW_ General Correspondence issued in FERC P-803-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: General Correspondence issued in FERC P-803-000 Date:Tuesday, December 2, 2025 8:48:14 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, December 1, 2025 11:47 AM Subject: General Correspondence issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/1/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: General Correspondence Delegated Order Description: Letter to Pacific Gas and Electric Company providing comments on the 11/20/25 resumes for additional field inspectors to replace the previous inspectors for the Weir Modification Project for the Philbrook Dam, part of the DeSabla-Centerville Proj., P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251201- 3051__;!!KNMwiTCp4spf!A052ovy1h1VlnIWI- h0j9jA3KGdVK7kg5lLhgDGR6H5TIyx3L3TY0XtuVdzyjUXo227mM6fKuinxAfT7TVy4QZPRJV-xZDSeJeA4$ To modify your subscriptions, click here: h0j9jA3KGdVK7kg5lLhgDGR6H5TIyx3L3TY0XtuVdzyjUXo227mM6fKuinxAfT7TVy4QZPRJV-xZE8GXDup$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A052ovy1h1VlnIWI- h0j9jA3KGdVK7kg5lLhgDGR6H5TIyx3L3TY0XtuVdzyjUXo227mM6fKuinxAfT7TVy4QZPRJV-xZDhPaIFX$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office December 1, 2025 In reply refer to: Project No. 803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Field Inspectors’Resumes Dear Mr.Cruzen: This is in response to a letter dated November 20, 2025,from Mr. Robert Ellis that submitted resumes for additional field inspectors to replace the previous inspectors for the Weir Modification Project for Philbrook Dam, which is part of the DeSabla- Centerville Project, FERC No.803. We have reviewed the submittal,and we have the following comment: The proposed field inspectors, James Layfield and Justin Welty, are acceptable to serve as senior civil inspectors, and replace the senior civil inspectors authorized in the October 10, 2025, construction package. We appreciate your cooperation in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20251201-3051 Filed Date: 12/01/2025 Frank L Blackett Digitally signed by Frank L Blackett Date: 2025.12.01 11:20:45 -08'00' Document Content(s) P-803-000_99054_field inspectors_Philbrook Weir Mod.docx.pdf..............1 Document Accession #: 20251201-3051 Filed Date: 12/01/2025