Loading...
HomeMy WebLinkAbout11.26.25 Board Correspondence_ FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:BOS Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence: FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Wednesday, November 26, 2025 3:26:13 PM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, November 26, 2025 2:16 PM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/26/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Drawing/Maps Description: Pacific Gas and Electric Company submits revised Exhibit F-5 for the Grizzly Tap Removal and Reconnection Project at the Bucks Creek Powerhouse of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251126- 5394__;!!KNMwiTCp4spf!Ba6MwILmj4RsP- k6MmKVWaTAiqdYOaOD_Wi9sKC3TCLlJUtsp5EJG0eT8FGbD5WfLM2- cAWu6zq90CJcG6IDpuSuIIuwLTO5Aedn$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Ba6MwILmj4RsP- k6MmKVWaTAiqdYOaOD_Wi9sKC3TCLlJUtsp5EJG0eT8FGbD5WfLM2-cAWu6zq90CJcG6IDpuSuIIuwLR- z9I4Z$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Ba6MwILmj4RsP- k6MmKVWaTAiqdYOaOD_Wi9sKC3TCLlJUtsp5EJG0eT8FGbD5WfLM2- cAWu6zq90CJcG6IDpuSuIIuwLQ2fi-Sx$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 November 26, 2025 Via Electronic Submittal (E-File) Debbie-Anne Reese, Secretary ATTN: OEP/DHAC Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Creek Powerhouse Grizzly Tap Removal and Reconnection – Revised Exhibit F-5 ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Secretary Reese: This letter provides an updated license Exhibit F-5 (Plans and Section of Bucks Creek Powerhouse) for the Grizzly Tap Removal and Reconnection Project at Bucks Creek Powerhouse, part of Pacific Gas and Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, FERC Project No. 619. A Brief Construction Report for this project is being filed separately with the San Francisco Regional Office (SFRO). On April 22, 2021, FERC issued an order amending the Bucks Creek Project license to change the transmission line route and revise the project description. (Enclosure 1) includes the updated Exhibit F-5, Plans and Section of Bucks Creek Powerhouse. This revision reflects the shortening of the Grizzly Tap and reconfiguration of certain ancillary and non-project features. Please note that PG&E filed updated Exhibit F drawings for the new license on March 29, 2024, and these remain under FERC review and pending approval. PG&E respectfully requests FERC’s review and approval of this updated Exhibit F -5. Under the new license issued on June 16, 2022, PG&E filed a revised Exhibit A on March 26, 2024, incorporating updates related to the Grizzly Tap project. Exhibit G was updated through a modified drawing G‑10 (FERC Drawing No. 619‑204), filed on March 27, 2024, along with the Final Exhibit G Drawing Set and the Statement of Federal Lands. These updates reflect the reduced length of the Grizzly Tap; no changes to the Project boundary were proposed. Document Accession #: 20251126-5394 Filed Date: 11/26/2025 Debbie-Anne Reese, Secretary November 26, 2025 Page 2 Should you have technical questions concerning this matter, please contact Gavin Rhoads, project engineer for PG&E, at (530) 370 -6685. For general questions, please contact Jamie Visinoni, senior license coordinator for PG&E, at (530) 215-6676. Sincerely, Joe Landucci Manager, Project Engineering Enclosure: CUI//CEII – DO NOT RELEASE 1. Exhibit F-5, Plans and Section of Bucks Creek Powerhouse, XX-XX-XXXX cc: via email w/o enclosure Valentina Guzman, City of Santa Clara – Vguzman@SantaClaraCA.gov Paulo Rocha, City of Santa Clara - procha@santaclaraca.gov Diane Asuncion, City of Santa Clara – dasuncion@santaclaraca.gov Document Accession #: 20251126-5394 Filed Date: 11/26/2025 Document Content(s) PGE20251126_619_ BucksCreekPwrH_Revised_ExhibitF5_Ltr.pdf.................1 Document Accession #: 20251126-5394 Filed Date: 11/26/2025