HomeMy WebLinkAbout11.26.25 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen;
Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company
Date:Wednesday, November 26, 2025 10:03:32 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, November 26, 2025 6:21 AM
Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links,
or replying..
On 11/26/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Dam Safety Compliance Report
Description: Pacific Gas and Electric Company submits Design Change Notification 6 re the Spillway Rehabilitation Project at the Bucks
Diversion Dam of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20251126-5088__;!!KNMwiTCp4spf!ENa8xg43PKuWaT14_9wW2oGF2SX9HKxJ-EkkMfAazrYt85VdNNWxgCdrM-
EKnwAN7wmMEaRCbiTZCCmsdKd0tftse-ijdlzZAgPk$
To modify your subscriptions, click here:
EkkMfAazrYt85VdNNWxgCdrM-EKnwAN7wmMEaRCbiTZCCmsdKd0tftse-ijdma1_94Y$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!ENa8xg43PKuWaT14_9wW2oGF2SX9HKxJ-
EkkMfAazrYt85VdNNWxgCdrM-EKnwAN7wmMEaRCbiTZCCmsdKd0tftse-ijdqCoqO9D$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
November 25, 2025
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Diversion Dam, NATDAM No. CA00331
Spillway Rehabilitation Project – Design Change Notification 6
ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Design Change Notification 6 (DCN 6) for the spillway rehabilitation
project at Bucks Diversion Dam, which is part of Pacific Gas and Electric Company’s (PG&E)
Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619 .
FERC authorized the work in a letter to PG&E dated May 7, 2024.
A summary of DCN 6 is provided in (Enclosure 1). DCN 6 is included with this letter for FERC
review and authorization (Enclosure 2).
Should you have technical questions concerning this matter, please contact Ben Fontana,
senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please
contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosures: CUI//CEII – DO NOT RELEASE
1. Summary of DCN 6 for the Spillway Rehabilitation Project
2. DCN 6 for the Spillway Rehabilitation Project at Bucks Diversion Dam, dated October 31,
2025
Document Accession #: 20251126-5088 Filed Date: 11/26/2025