Loading...
HomeMy WebLinkAbout11.26.25 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Wednesday, November 26, 2025 10:03:32 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, November 26, 2025 6:21 AM Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/26/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits Design Change Notification 6 re the Spillway Rehabilitation Project at the Bucks Diversion Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20251126-5088__;!!KNMwiTCp4spf!ENa8xg43PKuWaT14_9wW2oGF2SX9HKxJ-EkkMfAazrYt85VdNNWxgCdrM- EKnwAN7wmMEaRCbiTZCCmsdKd0tftse-ijdlzZAgPk$ To modify your subscriptions, click here: EkkMfAazrYt85VdNNWxgCdrM-EKnwAN7wmMEaRCbiTZCCmsdKd0tftse-ijdma1_94Y$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!ENa8xg43PKuWaT14_9wW2oGF2SX9HKxJ- EkkMfAazrYt85VdNNWxgCdrM-EKnwAN7wmMEaRCbiTZCCmsdKd0tftse-ijdqCoqO9D$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 November 25, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 Spillway Rehabilitation Project – Design Change Notification 6 ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Design Change Notification 6 (DCN 6) for the spillway rehabilitation project at Bucks Diversion Dam, which is part of Pacific Gas and Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619 . FERC authorized the work in a letter to PG&E dated May 7, 2024. A summary of DCN 6 is provided in (Enclosure 1). DCN 6 is included with this letter for FERC review and authorization (Enclosure 2). Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Summary of DCN 6 for the Spillway Rehabilitation Project 2. DCN 6 for the Spillway Rehabilitation Project at Bucks Diversion Dam, dated October 31, 2025 Document Accession #: 20251126-5088 Filed Date: 11/26/2025 Document Content(s) PGE20251125_619_BucksDivSpillway_DCN06_Ltr.pdf ...........................1 Document Accession #: 20251126-5088 Filed Date: 11/26/2025