Loading...
HomeMy WebLinkAbout11.25.25 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, November 25, 2025 4:46:52 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, November 25, 2025 10:46 AM Subject: Project Operations Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/25/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Drawing/Maps Description: Pacific Gas and Electric Company submits revised Exhibit G-1 and G-6 Drawings re the Poe Hydroelectric Project under P-2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251125- 5207__;!!KNMwiTCp4spf!C6TL38SBQGinychfGtbVXgMcL6a0RPXGqGjncjK2fqpdb6nIeidJ5hHHZVdJ5HPx3WrtFlZ-Kp3uEc12m17nRnFUApY5Aq4qSj_o$ To modify your subscriptions, click here: Kp3uEc12m17nRnFUApY5AjPlQEfE$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!C6TL38SBQGinychfGtbVXgMcL6a0RPXGqGjncjK2fqpdb6nIeidJ5hHHZVdJ5HPx3WrtFlZ- Kp3uEc12m17nRnFUApY5Arhye_94$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 November 25, 2025 Via Electronic Submittal (E-File) Debbie-Anne Reese, Secretary Federal Energy Regulatory Commission Division of Hydropower Administration and Compliance 888 First Street, NE Washington, D.C. 20426 RE: Poe Hydroelectric Project, FERC No. 2107-CA Docket: 20251014-2004, Revised Exhibits G-1 and G-6 Dear Secretary Reese: In the October 14, 2025 Order Approving Revised Exhibits A And G, And Revising Federal Land Acreage and Annual Charges Pursuant to Article 201 (Order), the Federal Energy Regulatory Commission (FERC) approved Exhibit A, Exhibit G-1 and G-6 that were filed for Pacific Gas & Electric Company’s (PG&E) Poe Hydroelectric Project, FERC Project No. 2107. The Order required PG&E to file the final stamped Exhibit G drawings, submit Form FERC-587 with FERC and with the Bureau of Land Management (BLM), and submit GIS data in an electric file format within 45 days of the issuance of the Order. The final stamped drawings for Exhibit G-1 and G-6 are included as (Enclosures 1 and 2), respectively. Pursuant to the revised Article 204 of the license, the Poe Project now occupies 159.7 acres of federal land and is included in a table on Exhibit G-1. Forms FERC-587 are included in (Enclosure 3). Digital Images of both exhibits and associated geographic information systems data are filed directly to FERC in electronic format. If you have any questions, please contact PG&E’s License Coordinator, Anna Urias, at 530-201-9161. Sincerely, Matthew Joseph Supervisor, Hydro License Management Enclosures: 1. G-1, P-2107-1015, General Map, 10-14-2025 2. G-6, P-2107-1016, PH & Big Bend Dam, 10-14-2025 3. Forms FERC-587 (a.P-2107_FERC-587_22N-05E, b.P-2107_FERC-587_23N-05E) Document Accession #: 20251125-5207 Filed Date: 11/25/2025 ENCLOSURE 1 Document Accession #: 20251125-5207 Filed Date: 11/25/2025 ") ") E E E 21N 4E. M. B. D. M 21N 5E. M. B. D. M 21N 6E. M. B. D. M 22N 4E. M. B. D. M 22N 5E. M. B. D. M 22N 6E. M. B. D. M 23N 4E. M. B. D. M 23N 5E. M. B. D. M 23N 6E. M. B. D. M POE PH CRESTA PH BUTTE COUNTY PLUMAS COUNTY Exhibit G-2 Exhibit G-3 Exhibit G-4 Exhibit G-5 Exhibit G-6 Reference Point 1 39.800008 -121.533391 Reference Point 2 39.733345 -121.533387 Reference Point 3 39.766678 -121.366726¬«70 121°21'0"W 121°22'0"W 121°22'0"W 121°23'0"W 121°23'0"W 121°24'0"W 121°24'0"W 121°25'0"W 121°25'0"W 121°26'0"W 121°26'0"W 121°27'0"W 121°27'0"W 121°28'0"W 121°28'0"W 121°29'0"W 121°29'0"W 121°30'0"W 121°30'0"W 121°31'0"W 121°31'0"W 121°32'0"W 121°32'0"W 39 ° 5 0 ' 0 " N 39 ° 4 9 ' 0 " N 39 ° 4 9 ' 0 " N 39 ° 4 8 ' 0 " N 39 ° 4 8 ' 0 " N 39 ° 4 7 ' 0 " N 39 ° 4 7 ' 0 " N 39 ° 4 6 ' 0 " N 39 ° 4 6 ' 0 " N 39 ° 4 5 ' 0 " N 39 ° 4 5 ' 0 " N 39 ° 4 4 ' 0 " N 39 ° 4 4 ' 0 " N 39 ° 4 3 ' 0 " N 39 ° 4 3 ' 0 " N EXHIBIT G-1 PACIFIC GAS AND ELECTRIC CO. 701319 G-1 REV 2 THIS DRAWING/DOCUMENT IS PROPERTY OF THE PACIFIC GAS AND ELECTRIC COMPANY AND CONTAINS INFORMATION THAT IS DEEMED TO BE CONFIDENTIAL AND/OR PROPRIETARY BY SAID COMPANY. INFORMATION CONTAINED IN THIS DRAWING/DOCUMENT WHICH IS CONFIDENTIAL AND/OR PROPRIETARY IS NOT SUBJECT TO MANDATORY DISCLOSURE UNDER THE FREEDOM OF INFORMATION ACT, OR THE CALIFORNIA PUBLIC RECORDS ACT, AND USE OR DISCLOSURE OF INFORMATION CONTAINED IN THIS DRAWING/DOCUMENT MAY ALSO BE PROHIBITED BY VIRTUE OF APPLICABLE LAWS SUCH AS THE FEDERAL TRADE SECRETS ACT. NO USE, REPRODUCTION, OR DISCLOSURE IS AUTHORIZED WITHOUT THE EXPRESS WRITTEN PERMISSION OF SAID COMPANY. FERC 2107- © 202, BY PACIFIC GAS AND ELECTRIC COMPANY DECLINATION 13.17°E CHANGING BY .10° W/YEAR COMPUTED BY NOAA MAGNETIC DECLINATION CALCULATOR Õ 0 0.5 1 1.5 2 Miles 1 inch = 2,037 feet 13.17° Supersedes: FERC 2107-1009, PG&E 447236 GENERAL MAP POE PROJECT (P-2107) PG&E Private Land Plumas National Forest State Land FERC Project Boundary ! ! ! ! ! ! !! ! !! ! !! ! ! !! ! Reservoir Exhibit Extents Rivers/Streams Highway The data represented on these exhibits are not based on a survey, therefore contain no appropriate control points. All FERC linear project features were digitized based on ESRI aerial imagery. All FERC non-linear features (polygons) are based on historical Exhibit K drawings, BLM PLSS, and land ownership information acquired from USFS, State of California, PG&E and county parcel data. ESRI aerial imagery is sourced from Esri, DigitalGlobe, GeoEye, Earthstar Geographics, and local and state agencies Additional vendor data layers are used for context and non-project features and where appropriate have been modified to agree with digitized linear features. Environmental Systems Research Institute (ESRI) United States Forest Service (USFS) Bureau of Land Management (BLM) Public Land Survey System (PLSS) Roads (ESRI,2019) Hydrology (USGS NHD, 2016) Railroad (ESRI, 2019) PROJECTION: UTM ZONE: 10 THE PURPOSE OF THIS MAP IS TO PROVIDE A GRAPHIC DEPICTION OF THE FERC BOUNDARY. THIS MAP IS DERIVED FROM AERIAL IMAGERY AND HISTORICAL DRAWINGS PREPARED BY PACIFIC GAS AND ELECTRIC COMPANY OR ITS PREDECESSORS. ALL INFORMATION SHOWN, INCLUDING LINEWORK, COORDINATES AND ELEVATIONS, IS NOT DERIVED FROM A FIELD SURVEY USING MODERN SURVEY EQUIPMENT. ALL COORDINATES ARE TO BE CONSIDERED APPROXIMATE AND ARE NOT INTENDED TO BE USED FOR REAL PROPERTY DESCRIPTIONS. SURVEYOR'S STATEMENT  Date: 11/14/2025 Document Accession #: 20251125-5207 Filed Date: 11/25/2025 ENCLOSURE 2 Document Accession #: 20251125-5207 Filed Date: 11/25/2025 " [ [ [ ! ! Poe Tunnel Project Boundary 100' Width 50' Each Side of Center Adit No.2 800' 210' Project Width from Access Rd Western Pacific Railroad 210' Project Width from Access Rd Centerline Poe Powerhouse Rd 130' Project Width from Access Rd Centerline 130' Project Width from Access Rd Centerline Rock Creek Poe (Non-Project) Transmission Line Calibou-Palermo (Non-Project) Transmission Line Cresta-Rio Oso (Non-Project) Transmission Line Non-Project 230kV Transmission Line Project Boundary 20' Horizontal from N.M.W.S.E. Project Boundary 20' Horizontal from N.M.W.S.E. Matchline (See Exhibit G-5) Adit No.2 Spoil Pile Project Boundary Defined by PG&E LD# 2122-04-0298 50' Project Width from Bridge C/L Surge Chamber Poe PH Switchyard Big Bend Reservoir N.M.W.S. 901' Big Bend Dam Project Boundary 100' from RR C/L Adit No.2 Edge of Slope Project Boundary Edge of Treeline Project Boundary O.H.W.M. Project Boundary 50' from T/L Project Boundary Matchline FERC No.2100 Poe Powerhouse River Access Poe Beach 21N 4E. M. D. B. & M.21N 5E. M. D. B. & M. 22N 4E. M. D. B. & M. 22N 5E. M. D. B. & M. BUTTE COUNTY Big B e n d R d Bard e e s B a r R d Poe Powerhouse Rd Ro c k C r e e k North Fork F e a t h e r R i v e r NoltonCreek North Fork Feather R i v e r NorthForkFeatherRiver Plumas National Forest State Land Plumas National Forest PG&E PG&E PG&E PG&E State Land Reference Point 1 Lat 39.733334 Lon -121.483389 Reference Point 2 Lat 39.716666 Lon -121.483389 Reference Point 3 Lat 39.727778 Lon -121.450057 05 31 32 01 06 36 31 29 30 32 25 36 30 31 121°27'0"W 121°27'0"W 121°27'20"W 121°27'20"W 121°27'40"W 121°27'40"W 121°28'0"W 121°28'0"W 121°28'20"W 121°28'20"W 121°28'40"W 121°28'40"W 121°29'0"W 121°29'0"W 39 ° 4 4 ' 0 " N 39 ° 4 4 ' 0 " N 39 ° 4 3 ' 4 0 " N 39 ° 4 3 ' 4 0 " N 39 ° 4 3 ' 2 0 " N 39 ° 4 3 ' 2 0 " N 39 ° 4 3 ' 0 " N 39 ° 4 3 ' 0 " N ! Exhibit G-5 Exhibit G-6 Butte County 21N 4E. M. D. B. & M.21N 5E. M. D. B. & M. 22N 4E. M. D. B. & M. 22N 5E. M. D. B. & M. ¬«70 Parkhill EXHIBIT G-6 POE PROJECT (P-2107) PACIFIC GAS AND ELECTRIC CO. 701324 G6 REV-2 THIS DRAWING/DOCUMENT IS PROPERTY OF THE PACIFIC GAS AND ELECTRIC COMPANY AND CONTAINS INFORMATION THAT IS DEEMED TO BE CONFIDENTIAL AND/OR PROPRIETARY BY SAID COMPANY. INFORMATION CONTAINED IN THIS DRAWING/DOCUMENT WHICH IS CONFIDENTIAL AND/OR PROPRIETARY IS NOT SUBJECT TO MANDATORY DISCLOSURE UNDER THE FREEDOM OF INFORMATION ACT, OR THE CALIFORNIA PUBLIC RECORDS ACT, AND USE OR DISCLOSURE OF INFORMATION CONTAINED IN THIS DRAWING/DOCUMENT MAY ALSO BE PROHIBITED BY VIRTUE OF APPLICABLE LAWS SUCH AS THE FEDERAL TRADE SECRETS ACT. NO USE, REPRODUCTION, OR DISCLOSURE IS AUTHORIZED WITHOUT THE EXPRESS WRITTEN PERMISSION OF SAID COMPANY. FERC 2107 - © 202, BY PACIFIC GAS AND ELECTRIC COMPANY DECLINATION 13.73°E CHANGING BY .08° W/YEAR COMPUTED BY NOAA MAGNETIC DECLINATION CALCULATORÕ 0 800 1,600400 FEET 1 inch = 400 feet Transmission Line Project Feature Highway Powerhouse & Big Bend Dam 13.73° Reservoirs! ! ! ! ! ! ! ! ! ! !! ! FERC Project Boundary Major River Supersedes:FERC 2107-1014 Road Current Text are just placeholders Drawing Rev. No Description Draft Submittal Date FERC Approval Information Date Document No Drawing No Final Submittal Date 1 Initial new 2018 License Exhibit Drawing Revision Information Minor River/Stream Land Ownership Federal Lands PG&E Lands Private Lands !Recreation Sites 2107-DRAFT12/10/2019 20191210-302406/17/2019 01/24/2020 State Lands 2 G-6 Ownership Correction: PG&E to USFS THE PURPOSE OF THIS MAP IS TO PROVIDE A GRAPHIC DEPICTION OF THE FERC BOUNDARY. THIS MAP IS DERIVED FROM AERIAL IMAGERY AND HISTORICAL DRAWINGS PREPARED BY PACIFIC GAS AND ELECTRIC COMPANY OR ITS PREDECESSORS. ALL INFORMATION SHOWN, INCLUDING LINEWORK, COORDINATES AND ELEVATIONS, IS NOT DERIVED FROM A FIELD SURVEY USING MODERN SURVEY EQUIPMENT. ALL COORDINATES ARE TO BE CONSIDERED APPROXIMATE AND ARE NOT INTENDED TO BE USED FOR REAL PROPERTY DESCRIPTIONS. SURVEYOR'S STATEMENT The drawing was created with GIS systems using UTM ZONE 10, NAD83 Projection 1 inch = 400 feet   Date: 11/14/2025 Document Accession #: 20251125-5207 Filed Date: 11/25/2025 ENCLOSURE 3 Document Accession #: 20251125-5207 Filed Date: 11/25/2025 Form FERC-587 OMB No. 1902-0145 (Expires 10/31/2027) LAND DESCRIPTION Public Land States (Rectangular Survey System Lands) 1. STATE 2. FERC PROJECT NO. 3. TOWNSHIP RANGE MERIDIAN 4. Check one: Check one: License Pending Preliminary Permit Issued If preliminary permit is issued, provide the expiration date: 5. EXHIBIT SHEET NUMBERS OR LETTERS 6. Contact Name _____________________________ Telephone Number__________________________ Date Submitted _____________________________ This information is necessary for the Federal Energy Regulatory Commission to discharge its responsibilities under Section 24 of the Federal Power Act. Document Accession #: 20251125-5207 Filed Date: 11/25/2025 Form FERC-587 OMB No. 1902-0145 (Expires 10/31/2027) LAND DESCRIPTION Public Land States (Rectangular Survey System Lands) 1. STATE 2. FERC PROJECT NO. 3. TOWNSHIP RANGE MERIDIAN 4. Check one: Check one: License Pending Preliminary Permit Issued If preliminary permit is issued, provide the expiration date: 5. EXHIBIT SHEET NUMBERS OR LETTERS 6. Contact Name _____________________________ Telephone Number__________________________ Date Submitted _____________________________ This information is necessary for the Federal Energy Regulatory Commission to discharge its responsibilities under Section 24 of the Federal Power Act. Document Accession #: 20251125-5207 Filed Date: 11/25/2025 Document Content(s) PGE20251125_2107_Poe_ExhibitG_Update.pdf..................................1 Document Accession #: 20251125-5207 Filed Date: 11/25/2025