Loading...
HomeMy WebLinkAbout11.20.25 Board Correspondence - FW_ Emergency Action Plan submitted in FERC P-2088-000 by Individual No Affiliation,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Emergency Action Plan submitted in FERC P-2088-000 by Individual No Affiliation,et al. Date:Thursday, November 20, 2025 8:05:46 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, November 20, 2025 5:45 AM Subject: Emergency Action Plan submitted in FERC P-2088-000 by Individual No Affiliation,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/20/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Individual No Affiliation South Feather Water & Power Agency (as Agent) Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: Emergency Action Plan Description: South Feather Water and Power Agency submits 2025 Emergency Action Plan Status Report re the Little Grass Valley Dam, et al. of the South Feather Power Project under P-2088. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251120- 5026__;!!KNMwiTCp4spf!By0RTKvuRUDdul3cdfoJJMKVz23oQB_2kUFkld5jXSwCY6uOj1Nd7zJuWtqT-w0GEFZgDxnkNkPVwCjxDjLBSAZjYjrnOt7LXsUv$ To modify your subscriptions, click here: w0GEFZgDxnkNkPVwCjxDjLBSAZjYjrnOo_60ub7$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!By0RTKvuRUDdul3cdfoJJMKVz23oQB_2kUFkld5jXSwCY6uOj1Nd7zJuWtqT- w0GEFZgDxnkNkPVwCjxDjLBSAZjYjrnOnq4xCj3$ or for phone support, call 866-208-3676. 1 November 19, 2025 Frank L. Blackett, PE, Regional Engineer Filed electronically Federal Energy Regulatory Commission 100 First Street, Suite 2300 San Francisco, CA 94105 RE: 2025 EAP Status Report for South Fork Power Project FERC No. 2088 Dear Mr. Blackett: Pursuant to 18 CFR §12.24, 12.25, South Feather Water and Power Agency submits this annual Emergency Action Plan (EAP) Status Report documenting compliance status with Chapter 6 of the FERC Engineering Guidelines which outline regulatory requirements for hydropower projects. 2023 EAP Status report for P-2088 020880601 Little Grass Valley CA00269 020880701 Sly Creek CA00272 020880301 Lost Creek CA00268 020880101 Miner’s Ranch CA00275 Items included in this status report are outlined below: • The date of the annual comprehensive review of the EAP. Staff continually review the EAP for content accuracy and clarity, as well as potential improvements. Dam safety training and review of the EAP for SFWPA staff was held on June 25, 2025, July 30, 2025, and October 29, 2025. The annual binder holder review of the EAP was conducted on October 23, 2025. • The date on which any EAP updates were sent to binder holders. The binder holders attending the October 23, 2025 annual meeting were able to review contents of the current EAP and provide comments for necessary updates. • A list of recipients of the EAP. See Appendix A. • The date of the last full reprint and distribution of the EAP. The last full reprint was done in 2020. Requested updates to the EAP are completed and distributed annually. The Agency will be submitting a complete reprint of the SFWPA EAP to the FERC and all binder holders by January 30, 2026. • The date of the last Annual Seminar, Table Top and Functional Exercises and description of what was discussed. The last annual seminar was hosted on October 23, 2025. The last table top Document Accession #: 20251120-5026 Filed Date: 11/20/2025 2 and functional exercises were conducted on December 8, 2022. See Appendix B for the Annual Seminar presentation, including a summary of discussion and list of attendees. • The date of the last call-down drill. The last call-down drill was conducted on October 29, 2025. See Appendix C. • The date and results of the most current Sudden Failure Assessment. The most recent Sudden Failure Assessments were conducted in March 2025. See Appendix D. • The date and description of any public education materials provided during the year, and to whom. The 5-member Board of Directors is updated regarding dam safety issues on a monthly basis at the regularly scheduled Agency Board meetings. The Agency maintains public outreach materials on its’ website under Dam Safety - South Feather Water & Power Agency. Here, the public is able to access the comprehensive informational booklet created by FEMA “Living With Dams: Know Your Risk” and in 2025 added South Fork Power Project specific safety outreach materials, and these were printed and distributed at the EAP Annual Seminar on October 23, 2025. • A table including all parties who 1) received EAP updates, 2) participated in the annual seminar, and 3) participated in the annual call-down drill. See Appendices A through C respectively. • For a project previously exempted by FERC from filing an EAP, you must still submit an annual report. The annual review and status update of the Agency’s Emergency Plan Exempted dams was conducted by the CDSE and CDSC, and submitted via separate electronic filing to FERC on November 18, 2025. If you have any questions, please feel free to contact me at (530) 532-1348, or via email at kmckillop@southfeather.com. Sincerely, South Feather Water and Power Agency Enclosures: CUI/CEII/PRIV content filed separately c. Rath Moseley, General Manager Hunter Doyle, Power Division Manager Silas Sanderson, PE, Chief Dam Safety Engineer Document Accession #: 20251120-5026 Filed Date: 11/20/2025 Document Content(s) to FERC_11192025_2025 EAP Status Report.pdf...............................1 Document Accession #: 20251120-5026 Filed Date: 11/20/2025