HomeMy WebLinkAbout12.23.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by
Pacific Gas and Electric Company
Date:Tuesday, December 23, 2025 8:10:16 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, December 23, 2025 5:26 AM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric
Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 12/22/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC),
Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: Pacific Gas and Electric Company submits summary and conclusion of efforts to address
Recommendation 6 from the 11th Part 12D Safety Inspection Report et al. re the Bucks Storage Dam of the Bucks
Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251222-
5342__;!!KNMwiTCp4spf!GBCLH-xpOdk2noxovbboxfg596Xbmk9-
X0CCa2bMEEIJf5bnjjF_PUkQ5A1WfEBmVKpXD2cb20Kb8meo8VBGX1cOBBwWqNr9gD63$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!GBCLH-
xpOdk2noxovbboxfg596Xbmk9-
X0CCa2bMEEIJf5bnjjF_PUkQ5A1WfEBmVKpXD2cb20Kb8meo8VBGX1cOBBwWqJMlm-Ap$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GBCLH-
xpOdk2noxovbboxfg596Xbmk9-
X0CCa2bMEEIJf5bnjjF_PUkQ5A1WfEBmVKpXD2cb20Kb8meo8VBGX1cOBBwWqE3RNo_8$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
December 22, 2025
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Storage Dam, NATDAM No. CA00332
11th Part 12D Inspection – Recommendation 6 and FERC Comment
Summary and Conclusion
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to
address Recommendation 6 (R-6) from the 11th Part 12D safety inspection report (dated
October 2020) and the Federal Energy Regulatory Commission’s (FERC) Comment 1 (C-1)
from their January 20, 2023 letter for Bucks Storage Dam, which is part of PG&E’s Bucks
Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. FERC
provided its comment in a letter dated January 20, 2023. PG&E submitted its original plan
and schedule for addressing R-6 and C-1 in a letter to your office dated May 2, 2023.
PG&E believes R-6 and C-1 have been satisfactorily addressed based on the information
enclosed with this letter and no further action is necessary. Should you have technical
questions concerning this matter, please contact Ben Fontana, senior dam safety engineer
for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license
coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Summary and Conclusion for Recommendation 6 from the 11th Part 12D Inspection
Safety Report and Comment 1 from FERC’s January 20, 2023 letter
Document Accession #: 20251222-5342 Filed Date: 12/22/2025