Loading...
HomeMy WebLinkAbout12.23.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Tuesday, December 23, 2025 8:10:16 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, December 23, 2025 5:26 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/22/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits summary and conclusion of efforts to address Recommendation 6 from the 11th Part 12D Safety Inspection Report et al. re the Bucks Storage Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251222- 5342__;!!KNMwiTCp4spf!GBCLH-xpOdk2noxovbboxfg596Xbmk9- X0CCa2bMEEIJf5bnjjF_PUkQ5A1WfEBmVKpXD2cb20Kb8meo8VBGX1cOBBwWqNr9gD63$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!GBCLH- xpOdk2noxovbboxfg596Xbmk9- X0CCa2bMEEIJf5bnjjF_PUkQ5A1WfEBmVKpXD2cb20Kb8meo8VBGX1cOBBwWqJMlm-Ap$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GBCLH- xpOdk2noxovbboxfg596Xbmk9- X0CCa2bMEEIJf5bnjjF_PUkQ5A1WfEBmVKpXD2cb20Kb8meo8VBGX1cOBBwWqE3RNo_8$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 December 22, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 11th Part 12D Inspection – Recommendation 6 and FERC Comment Summary and Conclusion ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address Recommendation 6 (R-6) from the 11th Part 12D safety inspection report (dated October 2020) and the Federal Energy Regulatory Commission’s (FERC) Comment 1 (C-1) from their January 20, 2023 letter for Bucks Storage Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. FERC provided its comment in a letter dated January 20, 2023. PG&E submitted its original plan and schedule for addressing R-6 and C-1 in a letter to your office dated May 2, 2023. PG&E believes R-6 and C-1 have been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Summary and Conclusion for Recommendation 6 from the 11th Part 12D Inspection Safety Report and Comment 1 from FERC’s January 20, 2023 letter Document Accession #: 20251222-5342 Filed Date: 12/22/2025 Document Content(s) PGE20251222_2105_BucksStorage_2020Part12D_R6_Ltr.pdf......................1 Document Accession #: 20251222-5342 Filed Date: 12/22/2025