Loading...
HomeMy WebLinkAbout12.22.25 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company Date:Monday, December 22, 2025 9:32:32 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, December 22, 2025 7:06 AM Subject: Project Operations Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/22/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Drawing/Maps Description: Pacific Gas and Electric Company submits revised Exhibits G-1 and G-6 Geographical Information System data re the Poe Hydroelectric Project under P- 2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251222- 5036__;!!KNMwiTCp4spf!AhWdUYcPZuD7Wi5Ub8y0uUOTNTzm2sQ55svUWfQu_avhakfyot1b5-kptPr9HEztYdtJ2iO0sNTnqd5CbiQxtQKR2rai40llD3Ci$ To modify your subscriptions, click here: kptPr9HEztYdtJ2iO0sNTnqd5CbiQxtQKR2rai4y0e_KII$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AhWdUYcPZuD7Wi5Ub8y0uUOTNTzm2sQ55svUWfQu_avhakfyot1b5- kptPr9HEztYdtJ2iO0sNTnqd5CbiQxtQKR2rai4149FHDw$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 December 18, 2025 Via Electronic Submittal (E-File) Debbie-Anne Reese, Secretary Federal Energy Regulatory Commission Division of Hydropower Administration and Compliance 888 First Street, NE Washington, D.C. 20426 RE: Poe Hydroelectric Project, FERC No. 2107-CA Docket: 20251014-2004, Revised Exhibits G-1 and G-6 GIS Data Dear Secretary Reese: In the October 14, 2025 Order Approving Revised Exhibits A And G, And Revising Federal Land Acreage and Annual Charges Pursuant to Article 201 (Order), the Federal Energy Regulatory Commission (FERC) approved Exhibit A, Exhibit G-1 and G-6 that were filed for Pacific Gas & Electric Company’s (PG&E) Poe Hydroelectric Project, FERC Project No. 2107. The Order required PG&E to file the final stamped Exhibit G drawings, submit Form FERC-587 with FERC and with the Bureau of Land Management (BLM), and submit GIS data in an electric file format within 45 days of the issuance of the Order. In accordance with the Order, PG&E filed the final approved digital Exhibits and related GIS data with FERC on November 25, 2025. In an e-mail dated December 17, 2025, Division of Hydropower Administration and Compliance (DHAC) staff notified PG&E that DHAC did not receive the required GIS shapefiles specified by the Order during PG&E’s November 25, 2025, filing (Enclosure 1). This letter is provided to notify FERC that PG&E is re-filing the GIS shapefiles specified by the Order directly to the FERC e-Library. If you have any questions, please contact PG&E’s License Coordinator, Anna Urias, at 530-201-9161. Sincerely, Matthew Joseph Supervisor, Hydro License Management Enclosures: 1. E-mail from DHAC staff to PG&E requesting GIS data 2. GIS Data Files for updated Exhibits G-1 and G-6 Document Accession #: 20251222-5036 Filed Date: 12/22/2025 PDF/A non-compatible ENCLOSURE 1 Document Accession #: 20251222-5036 Filed Date: 12/22/2025 PDF/A non-compatible 1 Drummond, Duncan From:Joseph, Matthew Sent:Wednesday, December 17, 2025 5:33 AM To:Urias, Anna; Drummond, Duncan Subject:FW: Electronic Exhibit G drawings for P-2107 FYI From: Aneela Mousam <Aneela.Mousam@ferc.gov> Sent: Wednesday, December 17, 2025 4:06 AM To: Joseph, Matthew <MWJA@pge.com> Cc: Maggard, Stephanie <Stephanie.Maggard@pge.com> Subject: Electronic Exhibit G drawings for P-2107 !!! EXTERNAL SENDER !!! This email came from outside PG&E. Think before you click. Be extra wary of links, attachments, providing sensitive information, and QR Codes. If this email seems suspicious, use the REPORT PHISH BUTTON. Hello, Commission staƯ has received the electronic Exhibit G drawings (G-1 and G-6), filed on November 15, 2025, or Poe Hydroelectric Project. However, the filing did not include the required GIS shapefiles (project boundary, ederal lands boundary, and etc.). Please file the GIS data as soon as possible. Thank You, Aneela Mousam, P.E. Environmental Engineer Division o Hydropower Administration and Compliance Federal Energy Regulatory Commission (202) 502-8357 Document Accession #: 20251222-5036 Filed Date: 12/22/2025 PDF/A non-compatible Document Accession #: 20251222-5036 Filed Date: 12/22/2025 PDF/A non-compatible File [Enc2_P-2107_GIS_DATA_2025-12-18.zip] cannot be converted. (File extension 'ZIP' is not supported) Document Content(s) PGE20251219_2107_Poe_ExhibitG_GIS_Data_Sub_Ltr.pdf........................1 PGE20251219_2107_Poe_ExhibitG_GIS_Data_Sub_Enc1.pdf ......................2 Enc2_P-2107_GIS_DATA_2025-12-18.zip.......................................4 Document Accession #: 20251222-5036 Filed Date: 12/22/2025 PDF/A non-compatible